ACCELERATED DISTRIBUTION DEMONSTPA,TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR: 9005310498 DOC. DATE: 90/05/18 NOTARIZED:
NO FACIL:50-244 Robert, Emmet Ginna Nuclear Plant, Unit 1, Rochester AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.
Rochester Gas 6 Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.
Project Directorate I-3
SUBJECT:
Forwards Rev 1 to "Summary Exam Rept for 1990 Steam Generator Eddy Current Insp."
DISTRIBUTION CODE:
A001D COPIES RECEIVED LTR ENCL SIZE:
TITLE:
OR Submittal:
General Distribution NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
DOCKET G
05000244 8
05000244
/
RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: NRR/DET/ECMB 9H NRR/DST 8E2 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS2 RES/DS IR/EIB EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1
1 5
5 1
1 1
1 1
1 1
1 1
0 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD1-3 PD NRR/DOEA/OTSB11 NRR/DST/SELB 8D NRR DST/SRXB 8E G FILE Ol NRC PDR COPIES LTTR ENCL 1
1 D
D MPo p zyoys7z9.7 R
D S
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENI'ONTROLDESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 21 ENCL 19 A
D D
0 l
) 0 t
PZZZZ(ZZZ I////////I/
ll////
///
/////////////
ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N Y. 14649 0001 May 18, 1990 TCLCPHONC ARCA COOC 7ld 546-2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn:
Allen R. Johnson Project Directorate I-3 Washington, D.C.
20555
Subject:
1990 Steam Generator Eddy Current Examination Summary Report R.E.
Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Johnson:
In accordance with Appendix B paragraph 1.12.2.1 of the Ginna Station Quality Assurance Manual and Section 6.9.3.4 of the Ginna Station Technical Specifications, we are submitting Revision 1 of the 1990 Steam Generator Eddy Current Examination Summary Report for R.E.
Ginna Nuclear Power Plant.
This report summarizes observations and corrective actions resulting from inspections performed during the 1990 outage and identifies the tubes inspected, the location and extent of each indication and the tubes which have been plugged or sleeved.
The only changes made in this revision are to Table 1 to more clearly identify the examination extents.
Very truly yours, Robert C.
Me ed Division Manager Nuclear Production GJWK106 xc: Mr. Allen R. Johnson (Mail Stop 14D1)
Project Directorate I-3 Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Region I 475 A'llendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector 90053~049, 05000244 8 900518 pDR
@DOC~
PDC 0
qg)g9 gl