Advises That Final Results of Station Blackout Documentation Review Will Be Submitted to NRC on or About 900501
ML17261B040
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/30/1990
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Murley T
Office of Nuclear Reactor Regulation
References
NUDOCS 9004160282
Download: ML17261B040 (4)


Text

ACCELERATED DISHGBUTION DEMONSHRATION SYSTEM

~

~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9004160282 DOC.DATE: 90/03/30'OTARIZED:

NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION MURLEY,T.E.

Office of Nuclear Reactor Regulation, Director (Post 870411

SUBJECT:

Advises that final results of station blackout documentation review will be submitted to NRC on or about 900501.

DXSTRXBUTXON CODE:

A050D COPIES RECEIVED:LTR g ENCL ~SIZE:

TITLE: OR Submittal: Station Blackout (USI A-44) 10CFR50.63, MPA A-22 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL: NRR PD1-4PM TAM NRR/DST/SELB B8E REG 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME JOHNSON,A NRR/DET/ESGB 8D NRR/DST/SPLB8D1 NUDOCS-ABSTRACT NRC PDR COPIES LTTR E CL NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WAS') CONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELMINATEYOUR NAMEFROM DISIRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED:

LTTR 17 ENCL

f 4

9 t

lr 0

CW'/

C

'E

().

C~i O.a

(

Cg (i

i'//ZIP I JVBÃ'i'tl//I

//I /IIIIIIIIIII/

IIIIIIII IIIII/I//ifl/

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N. K 14649 0001 March 30, 1990 TELEPHONE AREA COOE Tle 546.2700 Thomas E. Murley, Director Office Of Nuclear Reactor Regulation United States Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, Maryland 20852

Subject:

10 CFR f50.63 Station Blackout R. E. Ginna Nuclear Power Plant Docket Number 50-244

Dear Mr,

Murley:

On April 17, 1989, Rochester Gas and Electric Corporation supplied the NRC with information on compliance to 10 CFR f50.63 at the R. E. Ginna Nuclear Power Plant.

Since that time, RG&E personnel have been participating in industry groups on station blackout, and have been closely monitoring the recent interactions between NUMARCand the NRC Staff on this subject. We have noted generic concerns from NUMARC and the Staff that the industry's documentation of compliance to 10 CFR f50.63 did not meet the Staff's original intent (see RNUMARC 87-00 Supplemental Questions and Answers," and RNUMARC87-00 MajorAssumptions," December 27, 1990; Thadani to Marion, January 3, 1990; and, Lee to NUMARC Board of Directors, "Request for Supplemental SBO Submittal to NRC," January 4, 1990).

In light of these concerns, we would like to take this opportunity to inform you of recent activities that RG&E has undertaken to verify station blackout documentation for Ginna.

RG&E is in the final stages of a comprehensive review of its station blackout documentation.

This review makes a point-by-point comparison of our April 17, 1989 response and station blackout documentation to the methodology and baseline assumptions of NUMARC 87-00.

It also takes into account the concerns generated by the NRC Staff in station blackout documentation informational audits conducted in the industry in 1989, and in the recent interactions with NUMARC.

Preliminary results of our review have not indicated any problems with the proposed station blackout duration of four hours, the proposed target emergency diesel generator reliability of 0.975, or the schedule for completing the modifications and procedure changes, identified in our submittal of April 17, 1989.

We still intend to complete these changes within two years of the notification provided by the Director, Office of Nuclear Reactor Regulation, in accordance with 10 CFR f50.63(c)(3).

9'004160282 900330 PDR ADOCK 05000244 P

PDC o MVgof

RG&E Supplemental Information On Station Blackout March 30, 1990 Page 2 of 2 We expect to have the final results of our station blackout documentation review available for submittal to you on or about May 1, 1990.

Very truly yours, Robert C. Mecre y, Division Manager Nuclear Production TAD/094 XC:

United States Nuclear Regulatory Commission [Original]

Document Control Desk Washington, DC 20555 Mr. Allen R. Johnson (Mail Stop 14D1)

United States Nuclear. Regulatory Commission Project Directorate l-3 Washington, DC 20555 United States Nuclear Regulatory Commission Region I

475 Allendale Road King Of Prussia, Pennsyivania i 9406 Mr. Charles Marschall, USNRC Senior Resident Inspector R. E. Ginna Nuclear Power Plant 1503 Lake Road Ontario, New York14519 Mr, Alex Marion Nuclear Management And Resources Council 1776 Eye Street North West, Suite 300 Washington, DC 20006-2496