ML17261B093
| ML17261B093 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 07/09/1990 |
| From: | Mecredy R ROCHESTER GAS & ELECTRIC CORP. |
| To: | Andrea Johnson NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| References | |
| GL-88-14, NUDOCS 9007190045 | |
| Download: ML17261B093 (4) | |
Text
AC LERATED'ISTRIBUTION DEMONSTRATION SYSTEM t
ft REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR: 9007190045 DOC. DATE: 90/07/09 NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.
Rochester Gas 6 Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.
Project Directorate I-3
SUBJECT:
Responds to Generic Ltr 88-14, "Instrument Air Supply Sys Problems Affecting Safety Related Equipment."
DISTRIBUTION CODE:
A048D COPIES RECEIVED:LTR 2 ENCL 0 SIZE:
/
TITLE: OR/Licensing Submittal:
Equipment Qualification NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
DOCKET, 5 05000244 05000244 RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: NRR/DET/EMEB 9H R
PCeaNZZSZEEDP41 EXTERNAL: LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD1-3 PD NRR/DET/ESGB 8D OGC/HDS2 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL
~ p'o
$>fov571'y NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
a TOTAL NUMBER OF COPIES REQUIRED:
LTTR 12 ENCL
r Jt
t 4
zlzz@
zurzzr LA ~ OwIaa AHD t zzsgp zizuirizi
/
i 10%I(
I tZ@FI/d'sed ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.y.
$4849 ppp July 9, 1990 TELKPHONK ARKA cooc %id 546-2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn:
Allen R. Johnson Project Directorate I-3 Washington, D.C.
20555
Subject:
Generic Letter 88-14 R.E.
Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Johnson:
This letter is being provided in response to the reporting provisions of Generic Letter 88-14, "Instrument Air Supply System Problems Affecting Safety Related Equipment."
In that Generic Letter, it was requested that RG&E provide a written notification that all necessary actions taken to implement our commitments are complete (as specified in our February 3,
1989 response).
RG&E has completed all of these
- actions, and will retain the documentation verification for a minimum of two years.
Very truly yours, Robert C. Mecr dy Division Manager Nuclear Safety
& Licensing GJW:kjdh111
/
zc: Mr. Allen R. Johnson (Mail Stop 14Dl)
Project Directorate I-3 Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector 9007l 90045 900709 R
AGOCK 05000244 PDC
h F
%v PT L
N
~
II 1