MONTHYEARML17250B3041999-10-20020 October 1999 Forwards Changes to Tech Specs Bases for Re Ginna Nuclear Power Plant.Change Bars Indicate Those Revs Which Have Been Incorporated IR 05000244/19990081999-10-14014 October 1999 Forwards Insp Rept 50-244/99-08 on 990809-0919.Severity Level IV Violation of NRC Requirements Occurred & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML17265A7651999-10-0808 October 1999 Forwards Fifteen Relief Requests That Will Be Utilized for Ginna NPP Fourth Interval ISI Program That Will Start on Jan 1,2000.Attachment 1 Includes Summaries & Detailed Description of Each Relief Request ML17265A7631999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 43 to Address Volumetric Examination Limitations (Less than 90%) Associated with a & B RHR Heat Exchanger Outlet Nozzle to Shell Welds.Approval Is Requested by Dec 31,2000 ML17265A7641999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 42 to Address Volumetric Examinations Limitations (Less than 90%) Associated with Eight Class 1 Identified Welds or Areas of Reactor Pressure Vessel ML20212J3561999-09-30030 September 1999 Forwards Four Copies of Re Ginna NPP Training & Qualification Plan for Security Officers, Rev 7,dtd 990930. Synopsis of Changes,Encl.Encl Withheld Per 10CFR73.21 ML20212J3801999-09-30030 September 1999 Forwards Four Copies of Rev to Re Ginna NPP Security Plan.Rev Changes Contingency Weapons Available to Response Force to Those Most Effective in Current Defensive Strategy.Encl Withheld Per 10CFR73.21 IR 05000244/19990051999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs ML17265A7571999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs IR 05000244/19992011999-09-24024 September 1999 Forwards Insp Rept 50-244/99-201 (Operational Safeguards Response Evaluation) on 990621-24.No Violations Noted. Primary Purpose of Osre to Assess Licensee Ability to Respond to External Threat.Insp Rept Withheld ML17265A7461999-08-31031 August 1999 Submits Response to NRC Administrative Ltr 95-03,rev 2, Availability of Reactor Vessel Integrity Database,Version, Dtd 990726 ML17265A7401999-08-26026 August 1999 Requests Approval for Use of Relief Request Number 35 Re Use of ASME Section XI Code,1995 Edition,1996 Addenda.Code Will Be Used to Develop Plant Fourth 10-year Interval ISI Program on Class 1,2 & 3 Components ML17265A7411999-08-26026 August 1999 Forwards LER 99-004-01 Re Plant Being Outside Design Basis Due to Containment Recirculation Fan Moisture Separator Vanes Being Incorrectly Installed.Part 21 Notification of 990512 Is Being Rescinded ML17265A7451999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Rept for Six Months Ending 990630,per 10CFR26.71(d) ML17250B3021999-08-23023 August 1999 Informs That Util & NRC Had Conference Call on 990816 to Review Approach in Responding to Questions,As Result of Questions Re Main Steam Check Valve Performance Included in Insp Rept 50-244/99-05,dtd 990806 ML17265A7271999-07-30030 July 1999 Forwards 10CFR21 Interim Rept Per Reporting of Defects & Noncompliance,Section 21 (a) (2).Interim Rept Prepared Because Evaluation Cannot Be Completed within 60 Days from Discovery of Deviation or Failure to Comply ML17265A7151999-07-23023 July 1999 Forwards LER 99-007-01 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Reactor Trip.Further Investigation of Event Identified Addl Corrective Actions ML17265A7061999-07-22022 July 1999 Forwards LER 98-003-02,re Actuations of CR Emergency Air Treatment Sys.All Creats Actuations,Including Those Originally Believed to Be Valid Actuations,Were,In Fact Invalid Actuations ML17265A7191999-07-21021 July 1999 Forwards Ginna Station ISI Rept for Refueling Outage Conducted in 1999 ML17265A7141999-07-21021 July 1999 Withdraws Relief Request 35 for Plant Inservice Insp Program Section XI Requirements,Submitted on 980806.Licensee Plans to Resubmit Relief Request,Which Includes Addl Level of Detail,In Near Future ML17265A7041999-07-16016 July 1999 Submits Info Re Specific Licensing Actions Which May Be Expected to Generate Complex Reviews,In Response to Administrative Ltr 99-02,dtd 990603 ML17265A6911999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Readiness Disclosure Attached ML17265A6871999-06-22022 June 1999 Forwards Response to RAI Made During 990225 Telcon Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Calculation Encl. Encl ML17265A6841999-06-21021 June 1999 Informs That Util Wishes to Amend Extend of Alternate Exams Provided for Relief Request Re ISI Program ASME Section XI Require Exams for First 10-Yr Interval for Containment ML17265A6741999-06-15015 June 1999 Submits Annual ECCS Rept IAW 10CFR50.46(a)(3)(ii) Requirements.No Changes Have Been Made to Large Break LOCA PCT & Small Break LOCA PCT ML17265A6751999-06-11011 June 1999 Responds to NRC RAI Re Licensee GL 96-05 Program.Encl Info Verifies That Util Is Implementing Provisions of JOG Program on MOV Periodic Verification ML17309A6551999-06-0707 June 1999 Responds to NRC 990310 RAI Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment ML17265A6671999-06-0101 June 1999 Requests Approval of Ginna QA Program for Radioactive Matl Packages,Form 311,approval Number 0019.Ginna QA Program for Station Operation, Was Most Recently Submitted to NRC by Ltr Dtd 981221 & Supplemented on 990301 ML17265A6641999-05-25025 May 1999 Forwards Addl Info on Use of GIP Method a for Re Ginna Nuclear Power Plant.Copy of Re Ginna Station USI A-46 Outlier Resolution Table as Requested ML17265A6611999-05-24024 May 1999 Forwards LER 99-007-00 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Rt.Util Is Planning to Submit Suppl to LER by 990730 ML20206U0921999-05-13013 May 1999 Forwards Four Copies of Rev R to Gnpp Security Plan,Per Provisions of 10CFR50.54(p).Rev Clarifies Armed Response Team Assignments & Does Not Degrade Physical Security Effectiveness.Rev Withheld,Per 10CFR73.21 ML17265A6461999-05-12012 May 1999 Forwards 1998 Annual Radioactive Effluent Release Rept & 1998 Annual Radiological Environ Operating Rept, for Re Ginna NPP ML17265A6411999-05-12012 May 1999 Forwards LER 99-004-00 IAW 10CFR50.73 & 10CFR21.Further Assessment Will Be Provided in Suppl to LER by 990630 ML20206E7221999-04-29029 April 1999 Forwards Four Copies of Rev Q to Re Ginna Nuclear Power Plant Security Plan,Per 10CFR50.54(p).Changes Do Not Degrade Physical Security Effectiveness.Encl Withheld,Per 10CFR73.21 ML20206H6911999-04-22022 April 1999 Forwards Info Requested During Informal Telcon on 980408 Concerning Upcoming Osre at Ginna Station.Info Requested Listed.Without Encls ML17265A6271999-04-19019 April 1999 Forwards Rev 0 & Rev 1 to Colr,Cycle 28 for Re Ginna NPP, Per TS 5.6.5 ML17309A6501999-04-14014 April 1999 Forwards Revised Ginna Station EOPs & Procedures Index ML17265A6121999-03-29029 March 1999 Forwards Rept on Status of Decommissioning Funding for Re Ginna Npp,For Which Rg&E Is Sole Owner,Per 10CFR50.75. Data Presented Herein,Current as of 981231 ML17265A6041999-03-24024 March 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(ii)(B) & 10CFR21.Addl Analyses Are Being Performed to Support Future Cycle Operation & Supplemental LER Is Scheduled to Be Submitted by 990618 ML17265A5671999-03-0101 March 1999 Forwards Application for Amend to License DPR-18,to Revise TSs Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6).Supporting Tss,Encl ML17265A5641999-03-0101 March 1999 Forwards Response to NRC 990217 RAI Concerning Changes to QA Program for Re Ginna Station Operation.Rg&E Is Modifying Changes Requested in 981221 Submittal.Modified QA Program,Encl ML17265A5551999-02-25025 February 1999 Informs That Util Is in Process of Revising fitness-for-duty Program,Developed in Accordance with 10CFR26.Util Will Continue to Use Dept of Health & Human Svcs Certified Test Facility for Majority of Tests During Yr ML17265A5561999-02-22022 February 1999 Forwards FFD Performance Data Rept for Six Months Ending 981231,per 10CFR26.71(d) ML17265A5451999-02-12012 February 1999 Forwards Simulator Four Year Certification Rept,Per 10CFR55.45(b)(5)(ii) ML17309A6491999-02-12012 February 1999 Forwards Ginna Station EOPs ML17265A5431999-02-0909 February 1999 Supplements 980806 Relief Request with Attached Table.Util Third 10-Yr ISI of Reactor Vessel Being Performed During 1999 Refueling Outage,Beginning on 990301 ML17265A5361999-02-0202 February 1999 Forwards Response to NRC 981203 RAI Re Resolution of Unresolved Safety Issue USI A-46.Util Does Not Agree with NRCs Interpretation.Detailed Bases,Encl ML17311A0691999-01-25025 January 1999 Forwards Revs to Ginna Station Emergency Plan Implementing Procedures (Epips).Previous Rev Had Incorrect Effective Date ML17311A0671999-01-14014 January 1999 Forwards Revised Emergency Operating Procedures for Re Ginna NPP ML17265A5131999-01-12012 January 1999 Forwards Revised Cover Page for Ginna Station Technical Requirements Manual (Trm), Rev 7,correcting Error in Effective Date 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17250B3041999-10-20020 October 1999 Forwards Changes to Tech Specs Bases for Re Ginna Nuclear Power Plant.Change Bars Indicate Those Revs Which Have Been Incorporated ML17265A7651999-10-0808 October 1999 Forwards Fifteen Relief Requests That Will Be Utilized for Ginna NPP Fourth Interval ISI Program That Will Start on Jan 1,2000.Attachment 1 Includes Summaries & Detailed Description of Each Relief Request ML17265A7631999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 43 to Address Volumetric Examination Limitations (Less than 90%) Associated with a & B RHR Heat Exchanger Outlet Nozzle to Shell Welds.Approval Is Requested by Dec 31,2000 ML17265A7641999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 42 to Address Volumetric Examinations Limitations (Less than 90%) Associated with Eight Class 1 Identified Welds or Areas of Reactor Pressure Vessel ML20212J3561999-09-30030 September 1999 Forwards Four Copies of Re Ginna NPP Training & Qualification Plan for Security Officers, Rev 7,dtd 990930. Synopsis of Changes,Encl.Encl Withheld Per 10CFR73.21 ML20212J3801999-09-30030 September 1999 Forwards Four Copies of Rev to Re Ginna NPP Security Plan.Rev Changes Contingency Weapons Available to Response Force to Those Most Effective in Current Defensive Strategy.Encl Withheld Per 10CFR73.21 IR 05000244/19990051999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs ML17265A7571999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs ML17265A7461999-08-31031 August 1999 Submits Response to NRC Administrative Ltr 95-03,rev 2, Availability of Reactor Vessel Integrity Database,Version, Dtd 990726 ML17265A7401999-08-26026 August 1999 Requests Approval for Use of Relief Request Number 35 Re Use of ASME Section XI Code,1995 Edition,1996 Addenda.Code Will Be Used to Develop Plant Fourth 10-year Interval ISI Program on Class 1,2 & 3 Components ML17265A7411999-08-26026 August 1999 Forwards LER 99-004-01 Re Plant Being Outside Design Basis Due to Containment Recirculation Fan Moisture Separator Vanes Being Incorrectly Installed.Part 21 Notification of 990512 Is Being Rescinded ML17250B3021999-08-23023 August 1999 Informs That Util & NRC Had Conference Call on 990816 to Review Approach in Responding to Questions,As Result of Questions Re Main Steam Check Valve Performance Included in Insp Rept 50-244/99-05,dtd 990806 ML17265A7451999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Rept for Six Months Ending 990630,per 10CFR26.71(d) ML17265A7271999-07-30030 July 1999 Forwards 10CFR21 Interim Rept Per Reporting of Defects & Noncompliance,Section 21 (a) (2).Interim Rept Prepared Because Evaluation Cannot Be Completed within 60 Days from Discovery of Deviation or Failure to Comply ML17265A7151999-07-23023 July 1999 Forwards LER 99-007-01 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Reactor Trip.Further Investigation of Event Identified Addl Corrective Actions ML17265A7061999-07-22022 July 1999 Forwards LER 98-003-02,re Actuations of CR Emergency Air Treatment Sys.All Creats Actuations,Including Those Originally Believed to Be Valid Actuations,Were,In Fact Invalid Actuations ML17265A7191999-07-21021 July 1999 Forwards Ginna Station ISI Rept for Refueling Outage Conducted in 1999 ML17265A7141999-07-21021 July 1999 Withdraws Relief Request 35 for Plant Inservice Insp Program Section XI Requirements,Submitted on 980806.Licensee Plans to Resubmit Relief Request,Which Includes Addl Level of Detail,In Near Future ML17265A7041999-07-16016 July 1999 Submits Info Re Specific Licensing Actions Which May Be Expected to Generate Complex Reviews,In Response to Administrative Ltr 99-02,dtd 990603 ML17265A6911999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Readiness Disclosure Attached ML17265A6871999-06-22022 June 1999 Forwards Response to RAI Made During 990225 Telcon Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Calculation Encl. Encl ML17265A6841999-06-21021 June 1999 Informs That Util Wishes to Amend Extend of Alternate Exams Provided for Relief Request Re ISI Program ASME Section XI Require Exams for First 10-Yr Interval for Containment ML17265A6741999-06-15015 June 1999 Submits Annual ECCS Rept IAW 10CFR50.46(a)(3)(ii) Requirements.No Changes Have Been Made to Large Break LOCA PCT & Small Break LOCA PCT ML17265A6751999-06-11011 June 1999 Responds to NRC RAI Re Licensee GL 96-05 Program.Encl Info Verifies That Util Is Implementing Provisions of JOG Program on MOV Periodic Verification ML17309A6551999-06-0707 June 1999 Responds to NRC 990310 RAI Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment ML17265A6671999-06-0101 June 1999 Requests Approval of Ginna QA Program for Radioactive Matl Packages,Form 311,approval Number 0019.Ginna QA Program for Station Operation, Was Most Recently Submitted to NRC by Ltr Dtd 981221 & Supplemented on 990301 ML17265A6641999-05-25025 May 1999 Forwards Addl Info on Use of GIP Method a for Re Ginna Nuclear Power Plant.Copy of Re Ginna Station USI A-46 Outlier Resolution Table as Requested ML17265A6611999-05-24024 May 1999 Forwards LER 99-007-00 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Rt.Util Is Planning to Submit Suppl to LER by 990730 ML20206U0921999-05-13013 May 1999 Forwards Four Copies of Rev R to Gnpp Security Plan,Per Provisions of 10CFR50.54(p).Rev Clarifies Armed Response Team Assignments & Does Not Degrade Physical Security Effectiveness.Rev Withheld,Per 10CFR73.21 ML17265A6461999-05-12012 May 1999 Forwards 1998 Annual Radioactive Effluent Release Rept & 1998 Annual Radiological Environ Operating Rept, for Re Ginna NPP ML17265A6411999-05-12012 May 1999 Forwards LER 99-004-00 IAW 10CFR50.73 & 10CFR21.Further Assessment Will Be Provided in Suppl to LER by 990630 ML20206E7221999-04-29029 April 1999 Forwards Four Copies of Rev Q to Re Ginna Nuclear Power Plant Security Plan,Per 10CFR50.54(p).Changes Do Not Degrade Physical Security Effectiveness.Encl Withheld,Per 10CFR73.21 ML20206H6911999-04-22022 April 1999 Forwards Info Requested During Informal Telcon on 980408 Concerning Upcoming Osre at Ginna Station.Info Requested Listed.Without Encls ML17265A6271999-04-19019 April 1999 Forwards Rev 0 & Rev 1 to Colr,Cycle 28 for Re Ginna NPP, Per TS 5.6.5 ML17309A6501999-04-14014 April 1999 Forwards Revised Ginna Station EOPs & Procedures Index ML17265A6121999-03-29029 March 1999 Forwards Rept on Status of Decommissioning Funding for Re Ginna Npp,For Which Rg&E Is Sole Owner,Per 10CFR50.75. Data Presented Herein,Current as of 981231 ML17265A6041999-03-24024 March 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(ii)(B) & 10CFR21.Addl Analyses Are Being Performed to Support Future Cycle Operation & Supplemental LER Is Scheduled to Be Submitted by 990618 ML17265A5641999-03-0101 March 1999 Forwards Response to NRC 990217 RAI Concerning Changes to QA Program for Re Ginna Station Operation.Rg&E Is Modifying Changes Requested in 981221 Submittal.Modified QA Program,Encl ML17265A5671999-03-0101 March 1999 Forwards Application for Amend to License DPR-18,to Revise TSs Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6).Supporting Tss,Encl ML17265A5551999-02-25025 February 1999 Informs That Util Is in Process of Revising fitness-for-duty Program,Developed in Accordance with 10CFR26.Util Will Continue to Use Dept of Health & Human Svcs Certified Test Facility for Majority of Tests During Yr ML17265A5561999-02-22022 February 1999 Forwards FFD Performance Data Rept for Six Months Ending 981231,per 10CFR26.71(d) ML17265A5451999-02-12012 February 1999 Forwards Simulator Four Year Certification Rept,Per 10CFR55.45(b)(5)(ii) ML17309A6491999-02-12012 February 1999 Forwards Ginna Station EOPs ML17265A5431999-02-0909 February 1999 Supplements 980806 Relief Request with Attached Table.Util Third 10-Yr ISI of Reactor Vessel Being Performed During 1999 Refueling Outage,Beginning on 990301 ML17265A5361999-02-0202 February 1999 Forwards Response to NRC 981203 RAI Re Resolution of Unresolved Safety Issue USI A-46.Util Does Not Agree with NRCs Interpretation.Detailed Bases,Encl ML17311A0691999-01-25025 January 1999 Forwards Revs to Ginna Station Emergency Plan Implementing Procedures (Epips).Previous Rev Had Incorrect Effective Date ML17311A0671999-01-14014 January 1999 Forwards Revised Emergency Operating Procedures for Re Ginna NPP ML17265A5131999-01-12012 January 1999 Forwards Revised Cover Page for Ginna Station Technical Requirements Manual (Trm), Rev 7,correcting Error in Effective Date ML17265A5111999-01-11011 January 1999 Requests Relief Per 10CFR50.55a(a)(3)(ii) from Certain Requirements of Section XI of ASME Bp&V Code for ISI Program.Relief Requests 37,38 & 39 Encl ML17265A5101999-01-11011 January 1999 Requests Relief Per to 10CFR50.55a(a)(3)(ii) from Certain Requirements of Section XI of ASME B&PV Code for ISI Program.Relief Request 40 Encl 1999-09-30
[Table view] |
Text
CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
A'ACCESSION NBR:9903100116 DOC.DATE: 99/03/Ol NOTARIZED: NO DOCKET ¹ FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G; 05000244 AUTri'a3'J+. AUTHOR AFFILIATION MECREDY R.d. Rochester Gas & Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.
SUBJECT:
Forwards response to NRC 990217 RAI concerning changes to QA program for RE Ginna Station operation.RGScE is modifying changes requested in 981221 submittal. Modified QA Program, encl.
DISTRIBUTION CODE: Q004D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: QA Topical Report, Change, Amendment, or Correspondence ocket/Utile NOTES:License Exp date in. accordance with 10CFR2,2.109 (9/19/72) . 0500020$
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL VISSING,G. 1 1 INTERNAL: DRS/RGN.. 1 1 NTZ~h 1 1 Y NRR/DISP/PIMB 1 1 NRR DRCH/HQMB 1 1 NUDOCS-ABSTRACT 1 1 OC/LFDCB 1 1 RGN1 PILE 1 1 1
EXTERNAL: DMB/OSS 1 1 IHS NRC PDR 1 1 0
C Ina~eeklIIIB NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11
ANn ROCHESTER GAS AND ElECTRIC CORPORATION ~ 89 EASTAVENUE, ROCHESTER, N. Y Id649-0001 AREA CODE716 5'-2700 ROBERT C. MECREDY Vice President Nudeor Operotions March 1, 1999 U. S. Nuclear Regulatory Commission Document Control Desk ATTN: Mr. Guy S. Vissing.
Project Directorate I-1 Washington, DC 20555
SUBJECT:
Revised Submittal of Quality Assurance Program for Station Operation R. E. Ginna Nuclear Power Plant Docket Number 50-244
REFERENCES:
- a. Letter from R.C. Mecredy, RG&E, to G.S. Vissing, NRC,
Subject:
"Revised Submittal of Quality Assurance Program for Station Operation," dated December 21, 1998.
- b. Letter from G.S. Vissing, NRC, to R.C. Mecredy, RG&E,
Subject:
"Revised Submittal of Quality Assurance Program for Station Operation, Request for Additional Information - R.E. Ginna Nuclear Power Plant (TAC No. MA4455)," dated February 17, 1999.
Dear Mr. Vissing:
In Revision 26 of QA Program for Station Operations (Reference a), RG&E requested the following changes:
~ Change commitment to Regulatory Guide 1.58, Rev. l. An alternative to the use of SNT-TC-1A-1975 for the qualification and certification of nondestructive testing personnel is requested.
Change commitment to Regulatory Guide 1.144, Rev. 1. In lieu of the 30 day requirement of Section 4.5.1 of ANSI N45.2.12-1977, an alternative is proposed.
On February 17, 1999, the NRC requested additional information concerning these changes in Reference b. RG&E is modifying the changes requested in Reference a and is providing the additional information requested.
9903i001ih 99030i PDR ADQCK 05000244,,]
( P PDR
The modified changes are described in Attachment 1. Changes made to Revision 25 of the Quality Assurance Program for Station Operation are denoted by a single revision bar in the left margin in the Enclosure. Attachment 2 is a copy of the enclosure with changes highlighted or struck out.
Very truly yours, Robert C. Mecred RCM~cjkgqapsorai.R26 Attachments 1 and 2
Enclosure:
QA Program for Station Operation Revision 26 xc: U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)
Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector
ATTACHMENT 1 17.1 MANAGEMENT Table 17.1.7-1 Conformance of Ginna Station Pro ram to ualit Assurance Standards Re uirements and Guides Regulatory Guide 1.58 RGRE Current Commitments RG&E commits to Reg. Guide 1.58, Rev. 1, which references SNT-TC-1A-1975 for the qualification and certification of nondestructive testing personnel
~ RGEE's ISI Plan currently endorses ASME Code Section XI-1986 Edition. This edition of'the ASME code references SNT-TC-1A-1980.
RG&E Re uested Chan e In Reference a, RGSE requested the following exception to the Reg. Guide 1. 58, Rev. 1 commitment to eliminate the current conflicts in our commitments:
~ RGGE's ISI Plan endorses ASME Code Section XI. The version of the ASME code endorsed is updated periodically. ASME Code Section XI references standards for the qualification and certification of nondestructive testing personnel. The standard referenced in the ASME code is used in lieu of SNT-TC-1A-1975, which is referenced by Reg. Guide 1.58, Rev.
1.
NRC= Res onse In Reference b, the NRC staff recommended a modification to RGIt'E's proposed text, as follows:
"RG8E's ISI Plan endorses ASME Code Section XI. The version of the ASME code endorsed is updated periodically. ASME Code Section XI references standards for the qualification and certification of nondestructive testing personnel.Section XI of the ASME Code contains specific requirements for nondestructive examination and also references the use of other supplementary standards for the qualification and certification of personnel performing nondestructive examinations. The applicable versions of the standards referenced in Section XI of the ASME code, as permitted for use by 10 CFR Part SO.S5a, may
I ATTACHMENT 1 I
be used for the qualification and certification of personnel performing nondestructive examinations required by Section III and Section XI of the ASME Code in lieu of the standard identified in Reg. Guide 1.58, Rev. 1, (SNT-TC-1A-1975) provided that other applicable rules contained in Section XI of the ASME Code are met RG&E Res onse RG&E agrees with the NRC's modified text of our proposal.
RG&E is incorporating this wording into Revision 26 of the QA Program for Station Operations.
Regulatory Guide 1.144 RG&E Current Commitment RG&E is currently committed to Reg. Guide 1.144, Rev. 1, which endorses ANSI N45.2.12-1977. Section 4.5.1 of ANSI N45.2.12-1977 requires "In the event that corrective action cannot, be completed within thirty days, the audited organization's response shall include a scheduled date for corrective action."
RG&E Re uested Chan e In Reference a, RG&E requested that in lieu of the 30 day requirement of Section 4.5.1 of ANSl N45.2.12-1977 that the following be applied:
"The audited organization shall respond to audit findings prior to the requested date. In the event that corrective action can not be completed prior to the response due date, the audited organization's response shall include a scheduled date for completion of the corrective action."
NRC Res onse In reference b, the NRC staff expressed concerns relative to the processing and prioritization of significant audit findings.
ATTACHMENT 1 RGGE Res onse RG&E is modifying the requested change to address the concerns of the NRC staff. Audit findings that are determined to be significant conditions adverse to quality will be required to be responded to by the audited organization within 30 days. The modified change is as follows:
"Corrective action response due dates and priority shall be based on safety significance. For audit findings that are determined to be significant conditions adverse to quality, the audited organization's response shall be provided within 30 days. ln the event that the corrective action for an audit finding cannot be completed by the response due date, the audited organization's response shall include a scheduled date for corrective action."