Category:E-Mail
MONTHYEARML24213A2602024-07-31031 July 2024 Request for Additional Information LAR to Support Implementation of Framatome Gaia Fuel ML24116A0112024-04-25025 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-13 Regarding Steam Generator Channel Head Drain Modification ML24115A2622024-04-24024 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-14 Regarding Pressurizer and Steam Generator Pressure-Retaining Welds and Full-Penetration Welded Nozzles ML24114A3192024-04-23023 April 2024 Acceptance Review Determination LAR to Extend Inspection Interval for Reactor Coolant Pump Flywheels (TSTF-421) Using the CLIIP ML24113A2502024-04-22022 April 2024 Request for Additional Information (e-mail 4/22/2024) License Renewal Commitment for Aging Management Program of Alloy 600 Components ML24092A1082024-04-0101 April 2024 3R22 RFO ISI Owners Activity Report Extension - NRC Staff Acknowledgement Email (4/1/2024) ML24065A3112024-03-0505 March 2024 Request for Additional Information (Redacted) (03/05/2025 E-mail from R. Guzman to S. Sinha) Framatome Gaia Fuel LOCA LAR ML24058A2322024-02-27027 February 2024 2/27/2024 E-mail from S. Sinha to R. Guzman P-8 Instrument Uncertainty in Support of LAR Framatome Gaia Fuel ML24032A4702024-02-0101 February 2024 Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24024A2452024-01-24024 January 2024 1/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML24024A0202024-01-24024 January 2024 Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures ML23326A0132023-11-22022 November 2023 Acceptance Review Determination LAR to Support Implementation of Framatome Gaia Fuel ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23317A0732023-11-13013 November 2023 Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a ML23297A2312023-10-24024 October 2023 E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia Fuel ML23265A2302023-09-22022 September 2023 Acceptance Review Determination - License Amendment Request Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML23258A0552023-08-31031 August 2023 Setup of Online Reference Portal and Audit Plan for the NRC Staff'S Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail) ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23172A0752023-06-21021 June 2023 Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23145A0052023-05-25025 May 2023 Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding ML23145A0042023-05-25025 May 2023 Acceptance Review Determination LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies ML23115A3022023-04-24024 April 2023 4/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23038A0152023-02-0707 February 2023 Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23024A1522023-01-24024 January 2023 Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML22320A5752022-11-16016 November 2022 E-mail to File - Summary of October 18, 2022, Meeting with Dominion to Discuss Requested Actions for Implementing Framatome Gaia Fuel ML22298A2052022-10-25025 October 2022 Acceptance Review Determination for Alternative Request for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles ML22292A3212022-10-19019 October 2022 Acceptance Review Determination for Alternative Request for Containment RSS Pump Periodic Verification Testing Program ML22297A1802022-10-0707 October 2022 Email Acknowledgement to Dominion Energy Nuclear Decommissioning Trust Fund Disbursement 30 Day Notification for Millstone Power Station Unit 1: Docket No 50-245 ML22278A0932022-10-0505 October 2022 E-mail to File - Summary of September 7, 2022, Meeting with Dominion to Discuss Proposed Supplement to the Spent Fuel Pool Criticality Safety Analysis (EPID L-2022-LRM-0059 ML22272A0332022-09-29029 September 2022 Memo E-mail to File - Summary of August 29, 2022, Meeting with Dominion to Discuss Proposed Alternative Request Post-peening follow-up Volumetric Exam of RPV Head Penetration Nozzle ML22252A1772022-09-0909 September 2022 Memo E-mail to File - Summary of August 9, 2022, Meeting with Dominion to Discuss Proposed Alternative Reqeust Recirculation Spray Pump Flow Testing (EPID L:2022-LRM-0057) ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22123A0812022-05-0303 May 2022 Acceptance Review Determination for Proposed LAR for TS Change Applicable to TSTF-359, Increase Flexibility in Mode Restraints ML22069A7192022-03-10010 March 2022 E-mail from R. Guzman to S. Sinha - Millstone Unit 3 Steam Generator Outage Conference Call ML22020A4122022-01-11011 January 2022 1/11/2022 State Consultation E-mail, R. Guzman to J. Semancik Millstone Power Station, Unit 3 Planned Issuance of Amendment to Clarify Shutdown Bank TS and Add Alternate Control Rod Position Monitoring Requirements ML21348A7392021-12-14014 December 2021 E-mail - Acceptance Review Determination Alternative Request IR-4-09 for Use Alternative Brazed Joint Assessment Methodology for Class 3 Moderate Energy Piping ML21347A9412021-12-13013 December 2021 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Safety Evaluation for Amendment No. 280 Measurement Uncertainy Recapture Power Uprate ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21297A0072021-10-19019 October 2021 E-mail from R. Guzman to S. Sinha - Acknowledgemnt of Error in SE for Millstone Power Station, Unit 3, Amendment No. 279 Addition of Analytical Methodology to the COLR for LBLOCA ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21223A3042021-08-11011 August 2021 Request for Withholding Information from Public Disclosure Proposed LAR to Add an Analytical Methodology to the COLR for a Large Break LOCA ML21200A2562021-07-19019 July 2021 7/19/2021 E-mail Pressurizer Steam Space Line Classification ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code 2024-07-31
[Table view] Category:Meeting Summary
MONTHYEARML24222A6992024-08-16016 August 2024 August 6, 2024, Summary of Regarding Potential License Amendment Request Change to Surveillance Requirements for Moderator Temperature Coefficient for Millstone, Unit No. 3, North Anna, Unit Nos. 1 and 2, and Summer, Unit No. 1 - ML24150A1542024-05-29029 May 2024 5/16/2024, Annual Assessment Meeting for Millstone Power Station - Meeting Summary ML23297A2312023-10-24024 October 2023 E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia Fuel ML23080A1902023-03-21021 March 2023 Annual Assessment Meeting for Millstone Power Station - Meeting Summary ML22272A0332022-09-29029 September 2022 Memo E-mail to File - Summary of August 29, 2022, Meeting with Dominion to Discuss Proposed Alternative Request Post-peening follow-up Volumetric Exam of RPV Head Penetration Nozzle ML22252A1772022-09-0909 September 2022 Memo E-mail to File - Summary of August 9, 2022, Meeting with Dominion to Discuss Proposed Alternative Reqeust Recirculation Spray Pump Flow Testing (EPID L:2022-LRM-0057) ML22130A1702022-05-20020 May 2022 Summary of April 21, 2022, Public Meeting to Discuss Potential Emergency Preparedness License Amendment Request ML22131A0702022-05-12012 May 2022 Summary of Conference Call Regarding the Spring 2022 Steam Generator Tube Inspections ML22102A1642022-04-12012 April 2022 Annual Assessment Meeting for Millstone Power Station - Meeting Summary ML21091A0522021-04-0101 April 2021 3/18/21 - Annual Assessment Meeting for Millstone Power Station - Meeting Summary ML21027A0232021-01-28028 January 2021 Summary of January 26, 2021 Closed Meeting with Dominion Energy Regarding Performance of Force on Force Exercises in a Pandemic Environment ML20272A3112020-09-28028 September 2020 Memo E-mail to File - Summary of August 19, 2020, Meeting with Dominion to Discuss Proposed Exemption Request Biennial Emergency Preparedness Exercise Date Change ML20210M4232020-08-0505 August 2020 Summary of June 29, 2020, Pre-Submittal Teleconference with Dominion Energy Nuclear Connecticut, Inc. Proposed License Amendment Request for Measurement Uncertainty Recapture Power Uprate ML20176A5992020-06-29029 June 2020 Summary of May 26, 2020, Pre-Submittal Teleconference with Dominion Energy Nuclear Connecticut, Inc. Proposed Alternative Request for Steam Generator Weld Examinations ML20121A1082020-04-30030 April 2020 Annual Assessment Meeting for Millstone Power Station - Meeting Summary ML19194A0012019-07-12012 July 2019 Memo E-mail to File - Summary of June 3, 2019, Meeting with Dominion to Discuss Proposed License Amendment Request to Extend Integrated Leak Rate Test Interval ML19159A0012019-06-0707 June 2019 Memo E-mail to File - Summary of May 9, 2019, Meeting with Dominion to Discuss Proposed License Amendment Request Revised TS Limits for Coolant Activity ML19144A1292019-05-30030 May 2019 Summary of November 20, 2018, Pre Application Meeting with Dominion Energy Regarding the Planned License Amendment Request to Revise Emergency Action Levels ML19046A1502019-02-15015 February 2019 Memo E-mail to File - Summary of January 22, 2019, Meeting with Dominion to Discuss Proposed Alternative IR-3-39 Fillet Welds ML18341A0982018-12-0707 December 2018 Memo E-mail to File - Summary of November 8, 2018, Meeting with Dominion to Discuss Proposed LAR - 10 CFR 50.69 Risk-Informed Approach ML18113A2672018-04-25025 April 2018 Summary of Meeting with Dominion Energy Nuclear Connecticut, Inc. on Planned Relief Request Submittal Concerning the In-Service Testing of the C Charging Pump ML18101A0422018-04-10010 April 2018 Summary of Annual Assessment Meeting for Millstone Power Station Held on 4/4/18 ML17274A0002017-09-29029 September 2017 Memo E-mail to File - Summary of August 31, 2017, Meeting with Dominion to Discuss Proposed License Amendment, Revised Spent Fuel Pool Criticality Safety Analysis ML17227A0052017-08-15015 August 2017 Memo E-mail to File - Summary of July 18, 2017, Meeting with Dominion to Discuss Proposed License Amendment Request, TS 3.8.1.1, AC Sources Operating ML17096A4512017-04-0505 April 2017 3/22/2017 - Summary of Annual Assessment Meeting for Millstone Power Station ML16160A0282016-06-0808 June 2016 Teleconference Memo to File - Millstone Power Station, Unit 2, Summary of May 3, 2016 Pre-submittal Teleconference with Dominion Nuclear Connecticut ML16102A0732016-04-0808 April 2016 3/29/2016 Summary of Public Annual Assessment Meeting for Millstone Power Station ML16035A4802016-02-12012 February 2016 Jsc Meeting Summary Attachment ML16004A4732016-01-0404 January 2016 Teleconference Memo to File: Summary of December 17, 2015 - Pre-submittal Call with the NRC Related to Confirmatory Item IV.5 ML16004A4722016-01-0404 January 2016 Teleconference Memo to File: Summary of December 10, 2015 - Pre-submittal Call with the NRC Related to Confirmatory Item IV.2 ML15316A2522015-11-19019 November 2015 October 20, 2015, Millstone, Units 2 and 3, Surry, Units 1 and 2, North Anna, Units 1 and 2 - Summary of Pre-submittal Conference Call Regarding Emergency Action Level Scheme Changes ML15173A0002015-06-23023 June 2015 Summary of Conference Call Regarding the Fall 2014 Steam Generator Tube Inspections ML15162A8662015-06-16016 June 2015 Summary of May 21, 2015 Meeting with Dominion Nuclear Connecticut, Inc. to Discuss Pre-Submittal of License Amendment Request for Removal of Severe Line Outage Detection at Millstone Power Station ML15128A3872015-05-0808 May 2015 4/14/2015 Summary of Annual Assessment Meeting for Millstone Power Station ML14210A0212014-08-0808 August 2014 June 25, 2014, Summary of Category 1 Public Meeting with Dominion Nuclear to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14093A7182014-04-0303 April 2014 Summary of Annual Assessment Meeting for Millstone Power Station on 3/31/2014 ML14029A6532014-01-29029 January 2014 2013 Annual Summary of the Green Mountain Power Special Nuclear Committee ML13207A2592013-07-30030 July 2013 7/17/2013 - Summary of Meeting with Dominion Nuclear Connecticut, Inc. and Areva to Discuss Upgrade to Areva Standard CE14 Htp Fuel Assembly.7/17/2013 - Summary of Meeting with Dominion Nuclear Connecticut, Inc. and Areva to Discuss Upgrade ML13127A0832013-05-0707 May 2013 4/9/13 - Summary of Annual Assessment Meeting with Millstone Power Station ML12115A1072012-04-23023 April 2012 Summary of Public Meeting to Discuss Annual Assessment of Safety Performance at Milstone for 2011 ML12115A1162012-04-23023 April 2012 4/19/2012 - Millstone Power Station/Neac 2011 Annual Assessment Meeting Summary ML1205803622012-03-12012 March 2012 2/15/2012 - Summary of Pre-Application Meeting with Dominion Nuclear Connecticut, Inc., to Discuss a Proposed Millstone Power Station, Unit No. 2, License Amendment Request Concerning Spent Fuel Pool Criticality Re-Analysis ML11292A1612011-10-20020 October 2011 Summary of Meeting with Beyond Nuclear Regarding Their 10 CFR 2.206 Petition to Suspend Operating Licenses of General Electric Mark I Boiling Water Reactors ML1118806442011-07-0707 July 2011 Summary of the Millstone 2011 Annual Assessment Meeting with the Connecticut Nuclear Energy Advisory Council (Neac) ML1118805312011-07-0707 July 2011 Annual Assessment Meeting Summary ML11166A1342011-06-22022 June 2011 Meeting Summary with the Beyond Nuclear Petitioners Regarding Their 2.206 Petition to Suspend Operating Licenses (Ols) of General Electric (GE) Boiling Water Reactors (Bwrs) Mark I (Bwrs) ML1106907942011-05-10010 May 2011 Summary of Meeting with Dominion Nuclear Connecticut, Inc. Discussing Millstone Power Station, Units 2 and 3 Licensing Activities ML1034807622011-01-12012 January 2011 November 8, 2010 Summary of Teleconference W/ DNC to Discuss Generic Letter 2004-02 Supplemental Response Request for Additional Information ML1022201102010-09-14014 September 2010 July 28, 2010, Summary of Teleconference with DNC to Discuss Generic Letter 2004-02 Supplemental Response Request for Additional Information ML1020102612010-07-29029 July 2010 Summary of July 13, 2010, Meeting with DNC to Discuss Generic Letter 2004-02 Supplemental Response Request for Additional Information 2024-08-16
[Table view] |