Letter Sequence Withholding Request Acceptance |
---|
EPID:L-2020-LLA-0242, Proposed License Amendment Request, Addition of Analytical Methodology to the Core Opera Ting Limits Report for a Full Spectrum Loss of Coolant Accident (Fsloca) Gamma Energy Redistribution Information (Approved, Closed) |
|
MONTHYEARRS-20-010, Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2020-02-28028 February 2020 Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) Project stage: Request ML20063L2822020-02-28028 February 2020 Application of Westinghouse Full Spectrum LOCA Evaluation Model Project stage: Other ML20244A3362020-08-31031 August 2020 Proposed License Amendment Request, Addition of Analytical Methodology to the Core Opera Ting Limits Report for a Full Spectrum Loss of Coolant Accident (Fsloca) Gamma Energy Redistribution Information Project stage: Request ML20310A3242020-11-0505 November 2020 Proposed License Amendment Request, Addition of Analytical Methodology to the Core Operating Limits Report for a Large Break Loss of Coolant Accident (LBLOCA) Project stage: Request ML20337A2692020-12-0202 December 2020 12/2/20 E-mail, Acceptance Review Determination, LAR Addition of Analytical Methodology to the Core Operating Limits Report for a Large Break Loss of Coolant Accident (LBLOCA) Project stage: Acceptance Review ML21105A1152021-04-15015 April 2021 Request for Additional Information (e-mail Dated 4/15/2021) Proposed LAR for Addition of Analytical Methodology to the Core Operating Limits Report for a LBLOCA Project stage: RAI ML21140A2992021-05-20020 May 2021 Response to Request for Additional Information for Proposed License Amendment Request to Add an Analytical Methodology to the Core Operating Limits Report for a Large Break Loss of Coolant Accident Project stage: Response to RAI ML21201A1712021-06-24024 June 2021 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses Project stage: Request ML21223A3042021-08-11011 August 2021 Request for Withholding Information from Public Disclosure Proposed LAR to Add an Analytical Methodology to the COLR for a Large Break LOCA Project stage: Withholding Request Acceptance ML21227A0002021-10-0505 October 2021 Issuance of Amendment No. 279 Regarding Addition of Analytical Methodology to the Core Operating Limits Report for a Large Break Loss-of-Coolant Accident Project stage: Approval ML21297A0072021-10-19019 October 2021 E-mail from R. Guzman to S. Sinha - Acknowledgemnt of Error in SE for Millstone Power Station, Unit 3, Amendment No. 279 Addition of Analytical Methodology to the COLR for LBLOCA Project stage: Other 2021-10-19
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24213A2602024-07-31031 July 2024 Request for Additional Information LAR to Support Implementation of Framatome Gaia Fuel ML24116A0112024-04-25025 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-13 Regarding Steam Generator Channel Head Drain Modification ML24115A2622024-04-24024 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-14 Regarding Pressurizer and Steam Generator Pressure-Retaining Welds and Full-Penetration Welded Nozzles ML24114A3192024-04-23023 April 2024 Acceptance Review Determination LAR to Extend Inspection Interval for Reactor Coolant Pump Flywheels (TSTF-421) Using the CLIIP ML24113A2502024-04-22022 April 2024 Request for Additional Information (e-mail 4/22/2024) License Renewal Commitment for Aging Management Program of Alloy 600 Components ML24092A1082024-04-0101 April 2024 3R22 RFO ISI Owners Activity Report Extension - NRC Staff Acknowledgement Email (4/1/2024) ML24065A3112024-03-0505 March 2024 Request for Additional Information (Redacted) (03/05/2025 E-mail from R. Guzman to S. Sinha) Framatome Gaia Fuel LOCA LAR ML24058A2322024-02-27027 February 2024 2/27/2024 E-mail from S. Sinha to R. Guzman P-8 Instrument Uncertainty in Support of LAR Framatome Gaia Fuel ML24032A4702024-02-0101 February 2024 Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24024A2452024-01-24024 January 2024 1/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML24024A0202024-01-24024 January 2024 Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures ML23326A0132023-11-22022 November 2023 Acceptance Review Determination LAR to Support Implementation of Framatome Gaia Fuel ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23317A0732023-11-13013 November 2023 Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a ML23297A2312023-10-24024 October 2023 E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia Fuel ML23265A2302023-09-22022 September 2023 Acceptance Review Determination - License Amendment Request Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML23258A0552023-08-31031 August 2023 Setup of Online Reference Portal and Audit Plan for the NRC Staff'S Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail) ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23172A0752023-06-21021 June 2023 Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23145A0052023-05-25025 May 2023 Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding ML23145A0042023-05-25025 May 2023 Acceptance Review Determination LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies ML23115A3022023-04-24024 April 2023 4/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23038A0152023-02-0707 February 2023 Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23024A1522023-01-24024 January 2023 Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML22320A5752022-11-16016 November 2022 E-mail to File - Summary of October 18, 2022, Meeting with Dominion to Discuss Requested Actions for Implementing Framatome Gaia Fuel ML22298A2052022-10-25025 October 2022 Acceptance Review Determination for Alternative Request for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles ML22292A3212022-10-19019 October 2022 Acceptance Review Determination for Alternative Request for Containment RSS Pump Periodic Verification Testing Program ML22297A1802022-10-0707 October 2022 Email Acknowledgement to Dominion Energy Nuclear Decommissioning Trust Fund Disbursement 30 Day Notification for Millstone Power Station Unit 1: Docket No 50-245 ML22278A0932022-10-0505 October 2022 E-mail to File - Summary of September 7, 2022, Meeting with Dominion to Discuss Proposed Supplement to the Spent Fuel Pool Criticality Safety Analysis (EPID L-2022-LRM-0059 ML22272A0332022-09-29029 September 2022 Memo E-mail to File - Summary of August 29, 2022, Meeting with Dominion to Discuss Proposed Alternative Request Post-peening follow-up Volumetric Exam of RPV Head Penetration Nozzle ML22252A1772022-09-0909 September 2022 Memo E-mail to File - Summary of August 9, 2022, Meeting with Dominion to Discuss Proposed Alternative Reqeust Recirculation Spray Pump Flow Testing (EPID L:2022-LRM-0057) ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22123A0812022-05-0303 May 2022 Acceptance Review Determination for Proposed LAR for TS Change Applicable to TSTF-359, Increase Flexibility in Mode Restraints ML22069A7192022-03-10010 March 2022 E-mail from R. Guzman to S. Sinha - Millstone Unit 3 Steam Generator Outage Conference Call ML22020A4122022-01-11011 January 2022 1/11/2022 State Consultation E-mail, R. Guzman to J. Semancik Millstone Power Station, Unit 3 Planned Issuance of Amendment to Clarify Shutdown Bank TS and Add Alternate Control Rod Position Monitoring Requirements ML21348A7392021-12-14014 December 2021 E-mail - Acceptance Review Determination Alternative Request IR-4-09 for Use Alternative Brazed Joint Assessment Methodology for Class 3 Moderate Energy Piping ML21347A9412021-12-13013 December 2021 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Safety Evaluation for Amendment No. 280 Measurement Uncertainy Recapture Power Uprate ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21297A0072021-10-19019 October 2021 E-mail from R. Guzman to S. Sinha - Acknowledgemnt of Error in SE for Millstone Power Station, Unit 3, Amendment No. 279 Addition of Analytical Methodology to the COLR for LBLOCA ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21223A3042021-08-11011 August 2021 Request for Withholding Information from Public Disclosure Proposed LAR to Add an Analytical Methodology to the COLR for a Large Break LOCA ML21200A2562021-07-19019 July 2021 7/19/2021 E-mail Pressurizer Steam Space Line Classification ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code 2024-07-31
[Table view] Category:Proprietary Information Review
MONTHYEARML24212A0742024-08-0505 August 2024 Request for Withholding Information from Public Disclosure - Millstone Power Station, Unit No. 3, Proposed Alternative Request IR-4-13 to Support Steam Generator Channel Head Drain Modification ML24043A0062024-02-15015 February 2024 Request for Withholding Information from Public Disclosure for License Amendment Request to Support Implementation of Framatome Gaia Fuel ML23223A0482023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Use Framatome Small Break and Realistic Large Break LOCA Evaluation Methodologies for Establishing COLR Limits ML23223A0552023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23101A0422023-05-0303 May 2023 Request for Withholding Information from Public Disclosure for North Anna Power Station Units 1 & 2, Surry Units 1 & 2 and Millstone Units 2 & 3, Request for Withholding, Appendix F of Fleet Report DOM-NAF-2-P ML22355A1832023-03-0101 March 2023 Request for Withholding Information from Public Disclosure for North Anna Station, Units 1 & 2, Surry Station, Units 1 & 2, and Millstone Station, Units 2 & 3 - Request for Withholding Appendix F of Fleet Report DOM-NAF-2 ML22335A4142022-12-21021 December 2022 Request for Withholding Information from Public Disclosure for Dominion Fleet Response to Request for Additional Information Regarding NRC Generic Letter 2004-02 ML21223A3042021-08-11011 August 2021 Request for Withholding Information from Public Disclosure Proposed LAR to Add an Analytical Methodology to the COLR for a Large Break LOCA ML21148A1502021-06-0808 June 2021 Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 & 2, Surry Power Station, Units 1 & 2, and Millstone Power Station, Units 2 & 3, Request for Withholding Response to NRC Request for Additional ML21075A2592021-03-18018 March 2021 Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Request for Withholding, Appendix E of Fleet Report Dom- ML21060B5992021-03-11011 March 2021 Request for Withholding Information from Public Disclosure ML18173A1582018-06-29029 June 2018 Request for Withholding Information from Public Disclosure for Millstone Power Station Unit 3 (Holtec) ML16320A2622016-12-0101 December 2016 Request for Withholding Information from Public Disclosure ML16320A2672016-12-0101 December 2016 Request for Withholding Information from Public Disclosure - June 15, 2016 Letter ML16320A2462016-11-16016 November 2016 Request for Withholding Information from Public Disclosure ML16129A0012016-06-0707 June 2016 Request for Withholding Information from Public Disclosure ML16040A2152016-02-24024 February 2016 Request for Withholding Information from Public Disclosure ML13080A3762013-03-28028 March 2013 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit 2 ML13080A3702013-03-28028 March 2013 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit 2 ML13080A3062013-03-28028 March 2013 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 2 ML13071A1022013-03-13013 March 2013 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 2 ML13053A3612013-03-0707 March 2013 Request for Withholding Information from Public Disclosure for DNC, DEK, Virginia Kewaunee Unit 1, Millstone Power Station, Units 1, 2 & 3, North Anna Units 1 & 2, Surry Units 1 & 2 Information Pertaining to Foreign Interests ML12258A1502012-09-19019 September 2012 Request for Withholding Information from Public Disclosure for Millstone Powers Station, Unit No. 3 ML1208304582012-04-10010 April 2012 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 2 ML1129303472011-10-25025 October 2011 Requesting for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 2 (TAC Nos. ME5998 - ME6007) ML1116719932011-06-29029 June 2011 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit 3 (TAC No. 5389) ML1103906642011-02-28028 February 2011 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 3 ML1025601852010-09-28028 September 2010 ME4600 (Dominion Fleet) Proprietary Determination Ltr 2010-09-13 ML1021607492010-09-22022 September 2010 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 3 ML1015405582010-06-11011 June 2010 Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit 3 ML0934504082009-12-23023 December 2009 Millstone Power Station, Units 2 & 3, North Anna Power Station, Units 1 &2, Surry Power Station Units 1 & 2 - Withholding of Information Determined to Be Proprietary ML0921608802009-08-21021 August 2009 Request for Withholding Information from Public Disclosure for Millstone Power Station Unit 3 ML0921200942009-08-0404 August 2009 Request for Withholding Information from Public Disclosure for Millstone Power Station Unit 2 ML0913104282009-06-0505 June 2009 Request for Withholding Information from Public Disclosure ML0900705162009-02-0303 February 2009 Request for Withholding Information from Pubic Disclosure Regarding Millstone Power Station, Unit No. 3 ML0823106632008-08-22022 August 2008 Letter Request for Withholding Information from Public Disclosure Regarding Millstone Power Station, Unit 3 ML0803501322008-03-13013 March 2008 Request for Withholding Information from Public Disclosure Regarding Millstone Power Station, Unit 3 ML0732500812007-12-14014 December 2007 Westinghouse Electric Company LLC Request for Withholding Information from Public Disclosure Regarding Letter (CAW-07-2252), Subject: WCAP-16271-P, Millstone Unit 3 Spent Fuel Pool Criticality Safety Analysis, March 2007 (Proprietary), Date ML0732400982007-11-29029 November 2007 Request for Withholding Information from Public for Surry Power Station, Units 1 and 2, North Anna Power Station, Units 1 and 2, and Millstone Power Station and Kewaunee Power Station (TAC Nos. MD6144, MD6145, MD6146, MD6147, MD6148, MD6149 ML0727005452007-10-18018 October 2007 Westinghouse Electric Company LLC Request for Withholding Information from Public Disclosure Regarding Letter (CAW-07-2296), Subject: NEU-07-128 P-Attachment, Millstone Nuclear Power Station Unit 2 Stretch Power Uprate Program Supplemental ML0720004022007-06-25025 June 2007 Attachment 6, Millstone Power Station Unit 3, License Amendment Request, Stretch Power Uprate, Application for Withholding Proprietary Information from Public Disclosure ML0622802932006-08-22022 August 2006 Framatome Anp, Inc. Request for Withholding Information from Public Disclosure ML0621903542006-08-0707 August 2006 Withholding Information from Public Disclosure. ML0620005092006-07-25025 July 2006 Request for Withholding Information from Public Disclosure for Stone and Webster ML0618004712006-07-18018 July 2006 Units 2 & 3, Withholding from Public Disclosure, CD-ROM Containing Electronic Gothic Input & Output Files from Benchmark Cases in Sections 4.3, 4.4, 4.5, & 4.6 of TR DOM-NAF-3, Gothic Methodology for Analyzing. ML0534000902006-03-0606 March 2006 Withholding from Public Disclosure, AW-05-2060, Pressurizer Spray Line Weld Repair ML0332304732003-12-15015 December 2003 Withholding Proprietary Information Letter, Request for Withholding Information from Public Disclosure ML0329304432003-11-12012 November 2003 Request for Withholding Information from Public Disclosure ML0319000172003-08-20020 August 2003 Request for Withholding Information from Public Disclosure ML0208706492002-04-11011 April 2002 Request for Withholding Proprietary Information from Public Disclosure (Tac No. MB4655) 2024-08-05
[Table view] |
Text
From: Guzman, Richard To: Shayan.Sinha@dominionenergy.com Cc: timothy.f.olsowy@dominionenergy.com
Subject:
RE: Millstone Unit 3 - Response to RAI re: Proposed LAR to add an Analytical Methodology to the COLR for a LBLOCA - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE Date: Wednesday, August 11, 2021 1:44:00 PM
- Shayan, Thank you for the clarification and confirming that the cited LTR-LIS-21-115 letter in the Westinghouse affidavit refers to the subject May 20, 2021 RAI Response. Ive updated my prior communication to reflect the appropriate proprietary document title accordingly.
Please consider the below update as my formal e-mail communication on this matter; it will be added to ADAMS as the official agency record.
- Thanks, Rich Rich Guzman Sr. PM, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Office: O-9C7 l Phone: (301) 415-1030 Richard.Guzman@nrc.gov
=========================================================
=======================
By letter dated May 20, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21140A299), Dominion Energy Nuclear Connecticut, Inc.
submitted an affidavit dated May 4, 2021, executed by Camille T. Zozula, on behalf of Westinghouse Electric Company, LLC (Westinghouse), requesting that the information contained in the following document be withheld from public disclosure pursuant to Section 2.390 of Title 10 of the Code of Federal Regulations (10 CFR):
LTR-LIS-21-115, Attachment 1 (DENCs response to RAI in Attachment 3, May 20, 2021, Serial No.21-154 (Proprietary portions))
A nonproprietary copy of these documents has been placed in the U.S. Nuclear Regulatory Commissions (NRCs) Public Document Room and added to the NRC Library in ADAMS under Accession No. ML21140A299.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouses competitors without license from Westinghouse constitutes a competitive economic advantage over
other companies.
(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, and assurance of quality, or licensing a similar product.
We have reviewed your application and the material accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted document marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1030 or Richard.Guzman@nrc.gov.
cc: Camille T. Zozula Manager, Regulatory Compliance
& Corporate Licensing Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066 Richard V. Guzman Senior Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Office: O-9C7 l Phone: (301) 415-1030 Richard.Guzman@nrc.gov
From: Shayan.Sinha@dominionenergy.com <Shayan.Sinha@dominionenergy.com>
Sent: Monday, August 09, 2021 4:06 PM To: Guzman, Richard <Richard.Guzman@nrc.gov>; timothy.f.olsowy@dominionenergy.com
Subject:
[External_Sender] RE: Millstone Unit 3 - Response to RAI re: Proposed LAR to add an Analytical Methodology to the COLR for a LBLOCA - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE
- Rich, To clarify, LTR-LIS-21-115 is the letter number that Westinghouse used for their technical input to RAI #1 and #2 responses (Dominion developed the RAI #3 response). We took the content from LTR-LIS-21-115 and formatted it into our Dominion RAI response template for Serial No 21-154.
Therefore, the proprietary portions of Westinghouse letter LTR-LIS-21-115, Attachment 1 are the same as the proprietary portions of DENCs response to RAI in Attachment 3, May 20, 2021, Serial No.21-154, and your proposed suggestion below is acceptable to us.
- Thanks, Shayan From: Guzman, Richard <Richard.Guzman@nrc.gov>
Sent: Thursday, August 5, 2021 12:47 PM To: Timothy F Olsowy (Dom En Nuclear CT, Inc. - 4) <timothy.f.olsowy@dominionenergy.com>
Cc: Shayan Sinha (Services - 6) <Shayan.Sinha@dominionenergy.com>
Subject:
[EXTERNAL] Millstone Unit 3 - Response to RAI re: Proposed LAR to add an Analytical Methodology to the COLR for a LBLOCA - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE
- This is an EXTERNAL email that was NOT sent from Dominion Energy. Are you expecting this message? Are you expecting a link or attachment? DO NOT click links or open attachments until you verify them***
- Tim, Below is a standard communication that I send back to the licensee acknowledging the receipt of documentation in which information is being requested to be withheld from public disclosure under 10 CFR 2.390. I noted that for the subject letter dated May 20, 2021 (attached), the affidavit executed by Camille T. Zozula specifies a document that I dont readily identify within the letter:
(2) I am requesting the proprietary portions LTR-LIS-21-115, Attachment 1 be withheld from public disclosure under 10 CFR 2.390 Can you verify the intended document w/proprietary portions being requested to be withheld? If the stated LTR-LIS-21-115, is indeed in error, please confirm that the affidavit as corrected should refer to the proprietary portions of DENCs May 20, 2021, RAI
response in Attachment 3; as a suggestion, I propose the document title as shown in red italics below.
- Thanks, Rich Guzman 301-415-1030 CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.