4/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints
ML23115A302
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 04/24/2023
From: Richard Guzman
NRC/NRR/DORL/LPL1
To: Sinha S
Dominion Energy Nuclear Connecticut
References
EPID L-2022-LLA-0052
Download: ML23115A302 (1)


Text

From: Richard Guzman To: Shayan.Sinha@dominionenergy.com

Subject:

RE: Millstone Power Station, Unit Nos. 2 and 3 - Issuance of Amendment Nos. 345 AND 285 Regarding Adoption of Technical Specification Task Force-359, "Increase Flexibility in Mode Restraints" (EPID L-2022-LLA-0052)

Date: Monday, April 24, 2023 2:30:00 PM

Shayan, Thank you for the quality check on the SE and noting the two discrepancies. The NRC staff acknowledges the identified errors as described in your message.

The errors do not change the safety evaluation basis and conclusion, and do not affect the issued technical specification pages; therefore, a written correction letter will not be warranted. Please consider this e-mail communication as the staffs confirmed acknowledgement and response to the identified errors.

Thank you, Rich Guzman Sr. PM, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Office: O-9C7 l Phone: (301) 415-1030 Richard.Guzman@nrc.gov From: Shayan.Sinha@dominionenergy.com <Shayan.Sinha@dominionenergy.com>

Sent: Monday, April 24, 2023 2:21 PM To: Richard Guzman <Richard.Guzman@nrc.gov>

Subject:

[External_Sender] FW: Millstone Power Station, Unit Nos. 2 and 3 - Issuance of Amendment Nos. 345 AND 285 Regarding Adoption of Technical Specification Task Force-359, "Increase Flexibility in Mode Restraints" (EPID L-2022-LLA-0052)

Rich, Dominion has reviewed the SE for the subject Amendment (MPS2/3 TSTF-359 LAR), and has noted two discrepancies below:
1. Page 6, Section 2.1.4, Variations from TSTF-359 proposed for MPS2 and MPS3, bullet # 3, it is noted in last complete sentence on the page that MPS2/3 LCO refer to RG 1.182 The highlighted should be RG 1.160.
2. Page 7, Section 2.2, Regulatory Review, it is noted in the second paragraph that LCOs for MPS2 and MPS 3 are contained in Sections 3/4.1 through 3/4.12.

However, the MPS2/3 TS only contain Sections 3/4.1 through 3/4.10.

If any of these comments require clarification, please let me know.

Thanks, Shayan

From: nrc_mail_1-1 Resource <nrc_mail_1-1.Resource@nrc.gov>

Sent: Thursday, March 16, 2023 6:07 PM To: Shayan Sinha (Services - 6) <shayan.sinha@dominionenergy.com>

Subject:

[EXTERNAL] Millstone Power Station, Unit Nos. 2 and 3 - Issuance of Amendment Nos. 345 AND 285 Regarding Adoption of Technical Specification Task Force-359, "Increase Flexibility in Mode Restraints" (EPID L-2022-LLA-0052)

Subject:

Millstone Power Station, Unit Nos. 2 and 3 - Issuance of Amendment Nos. 345 AND 285 Regarding Adoption of Technical Specification Task Force-359, "Increase Flexibility in Mode Restraints" (EPID L-2022-LLA-0052)

ADAMS Accession No.: ML23058A454 ADAMS Hyperlink:

https://adamswebsearch2.nrc.gov/webSearch2/main.jsp?

AccessionNumber=ML23058A454 Using Web-based ADAMS, select Advanced Search Under Property, select Accession Number Under Value, enter the Accession Number Click Search The attached document is being sent to you per your request to receive electronic mailings, if you wish to be removed follow the instructions below. The document is publicly available and will be accessible via the public web site Electronic Reading Room in the Agency Document Access and Management System (ADAMS),

http://www.nrc.gov/reading-rm/adams.html , generally within six days. To access this document use the ADAMS number provided in this email.

Documents containing proprietary or safeguards information are not publicly available and will not be sent using the electronic mailing system.

You are currently subscribed to millstone as: shayan.sinha@dominionenergy.com .

To unsubscribe: Please go to the NRC's public website http://www.nrc.gov/public-involve/listserver/plants-by-region.html Once at the site, type in your e-mail address in the space provided and check the box(es) that correspond to the list(s) you would like to unsubscribe from. Then click the Unsubscribe button.

or send an email to lyris@nrc.gov with the following information in the subject line unsubscribe millstone shayan.sinha@dominionenergy.com