ML24150A154

From kanterella
Jump to navigation Jump to search
5/16/2024, Annual Assessment Meeting for Millstone Power Station - Meeting Summary
ML24150A154
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 05/29/2024
From: Matt Young
NRC/RGN-I/DORS
To:
Dominion Energy Nuclear Connecticut
References
Download: ML24150A154 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD, STE 102 KING OF PRUSSIA, PENNSLYVANIA 19406-2713

May 29, 2024

MEETING

SUMMARY

LICENSEE: DOMINION ENERGY NUCLEAR CONNECTICUT, INC.

FACILITY: MILLSTONE POWER STATION, UNITS 2 AND 3

SUBJECT:

SUMMARY

OF PUBLIC MEETING

On May 16, 2024, at 7:00 p.m., the U.S. Nuclear Regulatory Commission (NRC) was part of a public meeting with the Connecticut Nuclear Energy Advisory Council (NEAC). During the first part of the meeting, the NRC staff presented the Agencys assessment of the safety performance at Millstone Power Station for the period of January 1, 2023 through December 31, 2023, as described in the annual assessment letter dated February 28, 2024.

A copy of the letter can be accessed through the NRCs Agencywide Documents Access and Management System (ADAMS), Accession Number ML24053A303. Following the presentation, an opportunity was provided to the members of the public and the Connecticut NEAC for questions. The following NRC staff provided presentations and answers to questions during the meeting: Matt Young (Branch Chief, Division of Operating Reactor Safety), Justin Fuller (Senior Resident Inspector, Millstone), Earl Bousquet (Resident Inspector, Millstone),

Dominic Antonangeli (Resident Inspector, Millstone), and Sarah Elkhiamy (Senior Project Engineer, Division of Operating Reactor Safety).

Copies of the slides used by the NRC staff during the meeting can be accessed through ADAMS, Accession Number ML24135A081. A notice of the NRC and NEAC meeting was issued on April 30, 2024, and was posted on the NRCs external (public) Web page (ADAMS Accession Number ML24113A183). ADAMS is accessible from the NRC Web page at:

http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of Millstone Power Station can be found on the NRC's website at:

https://www.nrc.gov/reactors/operating/oversight.html.

Matt R. Young, Chief Projects Branch 2 Division of Operating Reactor Safety