ML14002A160 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 02/06/2014 |
From: | Bowen J S NRC/NRR/DPR/MSD/MSPB |
To: | Nazar M Nextera Energy |
Lent S M, NRR/DPR, 415-1365 | |
Shared Package | |
ML14002A151 | List: |
References | |
EA-12-049, Job Code J4672, NRC-HQ-13-C-03-0039, TAC MF0982, TAC MF0983 | |
Download: ML14002A160 (98) | |
Similar Documents at Turkey Point | |
---|---|
Category:Audit Report
MONTHYEARML24256A1132024-09-13013 September 2024
[Table view]Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan ML23249A2412023-09-25025 September 2023 Regulatory Audit Summary for the Review of License Amendment Request to Revise the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML19217A0032019-12-0202 December 2019 Audit Report Regarding Generic Letter 2004 02 Closure Methodology (EPID-2017-LRC-0000) ML19032A5362019-02-0101 February 2019 SLRA Audit Report - Irradiated Concrete 2-1-19 ML18341A0242019-01-25025 January 2019 Report for the Onsite Regulatory Audit Regarding the Subsequent License Renewal Application Review ML18230B4822018-10-15015 October 2018 Report for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review ML18183A4452018-07-23023 July 2018 Report for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review ML18178A2292018-07-20020 July 2018 Summary of the Site Environmental Audit Related to the Review of the Subsequent License Renewal Application for Turkey Point Nuclear Generating Units 3 and 4 ML15358A1822016-01-21021 January 2016 Audit of the Licensee'S Management of Regulatory Commitments ML15307A3142015-11-12012 November 2015 Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 ML14002A1602014-02-0606 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML13023A1962013-01-30030 January 2013 Audit of Licensee'S Management of Regulatory Commitments (TAC MF0436 and MF0437) ML0821101292008-08-0404 August 2008 Audit of the Licensee'S Management of Regulatory Commitments 2024-09-13 Category:Letter MONTHYEARML24276A2302024-10-16016 October 2024
[Table view]Westinghouse Topical Report – Request for Withholding Information from Public Disclosure ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report IR 05000250/20240112024-08-0606 August 2024 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000250/2024011 and 05000251/2024011 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-112, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report IR 05000250/20240102024-05-0101 May 2024 Design Basis Assurance Inspection Programs Inspection Report 05000250/2024010 and 05000251/2024010 and Notice of Violation L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 L-2024-057, 0 for Turkey Point, Unit 3 - Condition Prohibited by Technical Specifications2024-04-11011 April 2024 0 for Turkey Point, Unit 3 - Condition Prohibited by Technical Specifications ML24096A2152024-04-0505 April 2024 Ltr. to Lewis Johnson, Principal Chief, Seminole Nation of Oklahoma, Re., Section 106 Letters for Turkey Point ML24096A2162024-04-0505 April 2024 Ltr. to Marcellus Osceola, Chairman, Seminole Tribe of Florida, Re., Section 106 Letters for Turkey Point ML24087A1982024-04-0505 April 2024 Notice of Availability of the Final Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML24096A2182024-04-0505 April 2024 Ltr. to Stephanie Bryan, Tribal Chair, Poarch Band of Creek Indians, Re., Section 106 Letters for Turkey Point 2024-09-25 Category:Report MONTHYEARML24158A3702024-09-0404 September 2024
[Table view]Record of Decision - Docket Nos. 50-250 and 50-521 Subsequent License Date Restoration for Turkey Point Nuclear Generating, Units 3 and 4 L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision ML23333A0142023-11-27027 November 2023 Attachment F - Groundwater Tek Inc - Peer Review Study Final-1 ML23333A0172023-11-27027 November 2023 Attachment I - Chin - the Cooling Canal System at the FPL-Turkey-Point Power Station ML24012A0422023-11-16016 November 2023 FAQ 23-03 Turkey Point IE01 Proposed NRC Response ML24081A1612023-11-16016 November 2023 FAQ 23-03 Turkey Point IE01 Revision 1 ML23265A5512023-09-22022 September 2023 Enclosure 3: WCAP-18830-NP, Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report2023-03-30030 March 2023 Correction to U4R33 Steam Generator Tube Inspection Report L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis2023-02-10010 February 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2022-110, License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary)2022-08-26026 August 2022 License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0042022-08-19019 August 2022 Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 L-2022-038, Emergency Response Data System (Eros) Changes2022-05-17017 May 2022 Emergency Response Data System (Eros) Changes L-2022-073, Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0042022-05-0303 May 2022 Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 L-2022-022, Updated Conditions of Certification Report2022-02-14014 February 2022 Updated Conditions of Certification Report L-2021-182, Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment Revisions2021-09-16016 September 2021 Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment Revisions L-2021-069, Commitment Revision Summary Report for Reactor Vessel Head Leakage Detection System (Rvhlds)2021-06-24024 June 2021 Commitment Revision Summary Report for Reactor Vessel Head Leakage Detection System (Rvhlds) IR 05000250/20200112020-07-23023 July 2020 NRC Inspection Report 05000250-2020011 and 05000251-2020011 and Investigation Report 2-2019-011; and Apparent Violation Final L-2020-073, Fifth Ten-Year Inservice Inspection Interval Revised Relief Request No. 6 and Supplemental Information for Train B CCW Return Piping2020-04-13013 April 2020 Fifth Ten-Year Inservice Inspection Interval Revised Relief Request No. 6 and Supplemental Information for Train B CCW Return Piping ML20098F3412020-04-0707 April 2020 Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information L-2019-204, Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - Notification2019-11-25025 November 2019 Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - Notification L-2019-151, 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2019-08-0606 August 2019 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds2019-03-19019 March 2019 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds L-2019-054, Baffle-Former Bolts Predictive Evaluations2019-03-13013 March 2019 Baffle-Former Bolts Predictive Evaluations ML19072A1622019-03-0505 March 2019 National Park Service, Southeast Regional Office, Comments Dated March 5, 2019, on Turkey Point Nuclear Generating Units 3 and 4 Preliminary Draft SEIS Regarding Subsequent License Renewal ML18353A8352018-12-31031 December 2018 Biological Assessment for the Turkey Point Units 3 and 4 Proposed Subsequent License Renewal ML18299A1162018-10-15015 October 2018 Structural Integrity Associates Engineering Report No. 1700109.401P, Revision 7 - Redacted, Evaluation of Environmentally-Assisted Fatigue for Turkey Point Units 3 and 4 for Subsequent License Renewal L-2018-174, Structural Integrity Associates Engineering Report No. 0901350.401, Revision 4, Leak-Before-Break Evaluation - Accumulator, Pressurizer Surge, and Residual Heat Removal Lines2018-10-12012 October 2018 Structural Integrity Associates Engineering Report No. 0901350.401, Revision 4, Leak-Before-Break Evaluation - Accumulator, Pressurizer Surge, and Residual Heat Removal Lines ML18299A1182018-10-12012 October 2018 Structural Integrity Associates Engineering Report No. 0901350.304, Revision 3, Fatigue Crack Growth Evaluation, October 12, 2018 L-2018-169, Responses to Requests for Additional Information for Subsequent License Renewal Application No. HC-7-a L-2018-169 Environmental Review2018-10-0505 October 2018 Responses to Requests for Additional Information for Subsequent License Renewal Application No. HC-7-a L-2018-169 Environmental Review L-2018-187, Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation2018-10-0505 October 2018 Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation L-2018-173, Notification of Request for Use and Approval of Polyacrylic Acid Pilot Program2018-09-21021 September 2018 Notification of Request for Use and Approval of Polyacrylic Acid Pilot Program ML18254A3412018-09-11011 September 2018 Fish and Wildlife Service'S List of Migratory Birds Near Turkey Point ML18227B5212018-08-15015 August 2018 Submit Attachment a, Annual Hourly Percent Frequency of Vertical and Horizontal Stability Categories by Wind Direction and Wind Speed ML18227A2902018-08-15015 August 2018 Submit Report Contains Official Summary of Startup Physics Tests, Unit 4 Cycle Iii. the Tests Were Conducted in Accordance with Operating Procedure 0204.5, Startup Sequence After Refueling L-2018-098, Annual Report for the AP1000 Standard Plant Design, 2017 Model Year 10 CFR 50.462018-04-18018 April 2018 Annual Report for the AP1000 Standard Plant Design, 2017 Model Year 10 CFR 50.46 L-2018-054, Attachment B: Process Control Program, 0-HPA-045, Revision 0A, Issued 2/16/172018-02-16016 February 2018 Attachment B: Process Control Program, 0-HPA-045, Revision 0A, Issued 2/16/17 L-2017-148, Special Report - Accident Monitoring Instrumentation2017-08-11011 August 2017 Special Report - Accident Monitoring Instrumentation L-2017-124, Flooding Focused Evaluation Summary2017-06-29029 June 2017 Flooding Focused Evaluation Summary L-2017-123, Special Report - Standby Steam Generator Feedwater Pumps Inoperable2017-06-29029 June 2017 Special Report - Standby Steam Generator Feedwater Pumps Inoperable L-2017-014, Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 20162017-04-17017 April 2017 Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 2016 L-2016-226, NEI 12-06, Revision 2, Appendix G, G.4.2 Mitigating Strategies Assessment Flex Strategies Report for the New Flood Hazard Information2016-12-20020 December 2016 NEI 12-06, Revision 2, Appendix G, G.4.2 Mitigating Strategies Assessment Flex Strategies Report for the New Flood Hazard Information L-2016-058, Licensee Qualification for Performing Dynamic Rod Worth Measurement Analysis2016-03-23023 March 2016 Licensee Qualification for Performing Dynamic Rod Worth Measurement Analysis ML16013A4722016-01-22022 January 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task L-2015-313, Special Report - Accident Monitoring Instrumentation2015-12-18018 December 2015 Special Report - Accident Monitoring Instrumentation L-2015-137, Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments2015-04-22022 April 2015 Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments ML15054A0372015-02-23023 February 2015 U.S. Nuclear Regulatory Commission, Record of Review Dispositions to Fire PRA Facts and Observations for Turkey Point Nuclear Generating Stations, Units 3 and 4 2024-09-04 Category:Technical MONTHYEARL-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024
[Table view]Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision ML23333A0172023-11-27027 November 2023 Attachment I - Chin - the Cooling Canal System at the FPL-Turkey-Point Power Station ML23333A0142023-11-27027 November 2023 Attachment F - Groundwater Tek Inc - Peer Review Study Final-1 ML23265A5512023-09-22022 September 2023 Enclosure 3: WCAP-18830-NP, Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report2023-03-30030 March 2023 Correction to U4R33 Steam Generator Tube Inspection Report L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis2023-02-10010 February 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2022-110, License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary)2022-08-26026 August 2022 License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0042022-08-19019 August 2022 Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 L-2022-073, Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0042022-05-0303 May 2022 Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 L-2022-022, Updated Conditions of Certification Report2022-02-14014 February 2022 Updated Conditions of Certification Report L-2021-069, Commitment Revision Summary Report for Reactor Vessel Head Leakage Detection System (Rvhlds)2021-06-24024 June 2021 Commitment Revision Summary Report for Reactor Vessel Head Leakage Detection System (Rvhlds) L-2020-073, Fifth Ten-Year Inservice Inspection Interval Revised Relief Request No. 6 and Supplemental Information for Train B CCW Return Piping2020-04-13013 April 2020 Fifth Ten-Year Inservice Inspection Interval Revised Relief Request No. 6 and Supplemental Information for Train B CCW Return Piping ML20098F3412020-04-0707 April 2020 Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds2019-03-19019 March 2019 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds L-2019-054, Baffle-Former Bolts Predictive Evaluations2019-03-13013 March 2019 Baffle-Former Bolts Predictive Evaluations ML19072A1622019-03-0505 March 2019 National Park Service, Southeast Regional Office, Comments Dated March 5, 2019, on Turkey Point Nuclear Generating Units 3 and 4 Preliminary Draft SEIS Regarding Subsequent License Renewal ML18353A8352018-12-31031 December 2018 Biological Assessment for the Turkey Point Units 3 and 4 Proposed Subsequent License Renewal ML18299A1162018-10-15015 October 2018 Structural Integrity Associates Engineering Report No. 1700109.401P, Revision 7 - Redacted, Evaluation of Environmentally-Assisted Fatigue for Turkey Point Units 3 and 4 for Subsequent License Renewal L-2018-174, Structural Integrity Associates Engineering Report No. 0901350.401, Revision 4, Leak-Before-Break Evaluation - Accumulator, Pressurizer Surge, and Residual Heat Removal Lines2018-10-12012 October 2018 Structural Integrity Associates Engineering Report No. 0901350.401, Revision 4, Leak-Before-Break Evaluation - Accumulator, Pressurizer Surge, and Residual Heat Removal Lines ML18299A1182018-10-12012 October 2018 Structural Integrity Associates Engineering Report No. 0901350.304, Revision 3, Fatigue Crack Growth Evaluation, October 12, 2018 L-2018-169, Responses to Requests for Additional Information for Subsequent License Renewal Application No. HC-7-a L-2018-169 Environmental Review2018-10-0505 October 2018 Responses to Requests for Additional Information for Subsequent License Renewal Application No. HC-7-a L-2018-169 Environmental Review L-2018-187, Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation2018-10-0505 October 2018 Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation ML18227B5212018-08-15015 August 2018 Submit Attachment a, Annual Hourly Percent Frequency of Vertical and Horizontal Stability Categories by Wind Direction and Wind Speed ML18227A2902018-08-15015 August 2018 Submit Report Contains Official Summary of Startup Physics Tests, Unit 4 Cycle Iii. the Tests Were Conducted in Accordance with Operating Procedure 0204.5, Startup Sequence After Refueling L-2018-098, Annual Report for the AP1000 Standard Plant Design, 2017 Model Year 10 CFR 50.462018-04-18018 April 2018 Annual Report for the AP1000 Standard Plant Design, 2017 Model Year 10 CFR 50.46 L-2018-054, Attachment B: Process Control Program, 0-HPA-045, Revision 0A, Issued 2/16/172018-02-16016 February 2018 Attachment B: Process Control Program, 0-HPA-045, Revision 0A, Issued 2/16/17 L-2014-085, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2014-03-27027 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident ML14002A1602014-02-0606 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14029A2522014-01-29029 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Turkey Point Nuclear Plant, Units 3 and 4, TAC Nos.: MF0982 and MF0983 ML13213A1902013-07-0909 July 2013 Rev. 2 to Seismic Walkdown Report, in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Turkey Point Unit 3. L-2013-198, Rev. 2 to Seismic Walkdown Report, in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Turkey Point Unit 4.2013-07-0909 July 2013 Rev. 2 to Seismic Walkdown Report, in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Turkey Point Unit 4. L-2013-087, Flood Hazard Reevaluation Report in Response to 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.1. Part 2 of 22013-03-11011 March 2013 Flood Hazard Reevaluation Report in Response to 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.1. Part 2 of 2 ML13095A1962013-03-11011 March 2013 Flood Hazard Reevaluation Report in Response to 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.1. Part 1 of 2 L-2012-417, Flooding Walkdown Report FPL061-PR-001, Rev 0, in Response to the 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.3: Flooding2012-11-20020 November 2012 Flooding Walkdown Report FPL061-PR-001, Rev 0, in Response to the 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.3: Flooding L-2011-190, WCAP-17070-NP, Revision 1, Westinghouse Setpoint Methodology for Protection Systems, Turkey Point, Units 3 & 4 (Power Uprate to 2644 Mwt - Core Power), Attachment 2 to L-2011-1902011-06-30030 June 2011 WCAP-17070-NP, Revision 1, Westinghouse Setpoint Methodology for Protection Systems, Turkey Point, Units 3 & 4 (Power Uprate to 2644 Mwt - Core Power), Attachment 2 to L-2011-190 L-2011-032, WCAP-17094-NP, Rev 3, Turkey Point, Units 3 and 4 New Fuel Storage Rack and Spent Fuel Pool Criticality Analysis, Attachment 2 to L-2011-0322011-02-28028 February 2011 WCAP-17094-NP, Rev 3, Turkey Point, Units 3 and 4 New Fuel Storage Rack and Spent Fuel Pool Criticality Analysis, Attachment 2 to L-2011-032 L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 2; Renewed Facility Operating License and Technical Specification Proposed Change Markups2010-12-14014 December 2010 Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 2; Renewed Facility Operating License and Technical Specification Proposed Change Markups ML1035601802010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 04; Appendix C, List of Key Acronyms ML1035601832010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 07; Supplemental Environmental Report L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 08; Cameron/Caldon Ultrasonics Engineering Reports2010-12-14014 December 2010 Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 08; Cameron/Caldon Ultrasonics Engineering Reports ML1035601842010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 08; Cameron/Caldon Ultrasonics Engineering Reports L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 07; Supplemental Environmental Report2010-12-14014 December 2010 Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 07; Supplemental Environmental Report L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 06; Summary of Regulatory Commitments2010-12-14014 December 2010 Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 06; Summary of Regulatory Commitments ML1035601822010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 06; Summary of Regulatory Commitments L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix C, List of Key Acronyms2010-12-14014 December 2010 Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix C, List of Key Acronyms L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix B, Additional Codes and Methods2010-12-14014 December 2010 Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix B, Additional Codes and Methods ML1035601792010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 04; Appendix B, Additional Codes and Methods L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix a, Safety Evaluation Report Compliance2010-12-14014 December 2010 Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix a, Safety Evaluation Report Compliance ML1035601782010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 04; Appendix a, Safety Evaluation Report Compliance 2024-04-30 |