|
---|
Category:Inspection Plan
MONTHYEARIR 05000250/20230062024-02-28028 February 2024 Annual Assessment Letter for Turkey Point Units 3 & 4 - Report 05000250/2023006 and 05000251/2023006 IR 05000250/20240112024-02-15015 February 2024 Notification of Turkey Point Nuclear Generating Station - Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 05000250/2024011 and 05000251/2024011 ML23265A2692023-09-15015 September 2023 Turkey Point,_Rp Document Request 2023-004 IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) ML23159A0852023-06-0909 June 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000250/20220062023-03-0101 March 2023 Annual Assessment Letter for Turkey Point, Units 3 & 4 (Report 05000250/2022006 and 05000251/2022006) ML23038A1892023-02-0303 February 2023 RP RFI April 2023 IR 05000250/20220052022-08-26026 August 2022 Updated Inspection Plan for Turkey Point Units 3 & 4 Report 05000250 2022005 and 05000251 2022005-Final ML22196A0722022-07-19019 July 2022 Notification of an NRC Fire Protection Team Inspection and Request for Information IR 05000250/20210062022-03-0202 March 2022 Annual Assessment Letter for Turkey Point, Units 3 and 4 (Report No. 05000250/2021006 and 05000251/2021006) ML22018A0292022-01-18018 January 2022 Region 2 RFI - 2022 Program Inspections IR 05000250/20210052021-08-25025 August 2021 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2021005 and 05000251/2021005) ML21196A1042021-07-15015 July 2021 Notification of Supplemental Inspection (95001) and Request for Information ML21182A1912021-07-0101 July 2021 Requalification Program Inspection - Turkey Point Nuclear Plant, Units 3 and 4 ML20315A0182020-11-10010 November 2020 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML19346G7212019-12-12012 December 2019 Radiation Safety Baseline Inspection RFI 2020-001 ML20028C7372019-12-0202 December 2019 Notification of Inspection and Request for Information IR 05000250/20190052019-08-27027 August 2019 Updated Inspection Plan for Turkey Point Nuclear Generating Station, Unit 3 and Unit 4 - (Report 05000250/2019005 and 05000251/2019005) ML19137A0452019-05-17017 May 2019 Heat Sink RFI 2019003 IR 05000250/20180062019-03-0404 March 2019 Annual Assessment Letter for Turkey Point Nuclear Generating Station, Unit 3 and 4 - Report 05000250/2018006 and 05000251/2018006, Report 05000250/2018402 and 05000251/2018402, Report 05000250/2018501 and 05000251/2018501 ML19057A0932019-02-26026 February 2019 RP RFI Notification ML19030A7652019-01-23023 January 2019 Tp U4 ISI RFI ML18219A6562018-08-0707 August 2018 Baseline Inservice Inspection Initial Information Request ML18059A0282018-02-28028 February 2018 EOC Assessment Letter Final ML17111A7482017-04-18018 April 2017 Requalification Program Inspection - Turkey Points 3 and 4 IR 05000250/20160062017-03-0101 March 2017 Annual Assessment Letter for Turkey Point Nuclear Generating Station, Units 3 and 4 (Report 05000250/2016006 and 05000251/2016006) IR 05000250/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Turkey Point Nuclear Generating Station Unit 3 and Unit 4 - NRC Inspection Report 05000250/2016005 and 05000251/2016005 ML16064A0632016-03-0303 March 2016 Turkey Point Nuclear Generating Station - Notification of Inspection and Request for Information ML16041A1282016-02-10010 February 2016 U-4 ISI 2016002 RFI as IR 05000250/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Turkey Point Nuclear Generating Units 3 & 4 (Report 05000250/2015005 and 05000251/2015005) IR 05000051/20140012015-03-0404 March 2015 Annual Assessment Letter for Turkey Point Nuclear Generating Unit 3 and Unit 4, (Report 05000250/2014001 and 0500051/2014001) ML14245A1862014-09-0202 September 2014 Mid-Cycle Ltr 2014 L-2014-073, Inservice Inspection Plan Relief Request No. 142014-03-14014 March 2014 Inservice Inspection Plan Relief Request No. 14 IR 05000250/20130012014-03-0404 March 2014 Annual Assessment Letter for Turkey Point Nuclear Generating Unit 3 and Unit 4 (Report 05000250/2013001 and 05000251/2013001) ML13246A1002013-09-0303 September 2013 Mid-Cycle Assessment Letter IR 05000250/20120012013-03-0404 March 2013 Annual Assessment Letter for Turkey Point Nuclear Plant, Units 3 & 4 (IR 05000250-12-001 and 05000251-12-001) ML13022A5712013-01-22022 January 2013 Notification of Inspection and Request for Information ML12248A2022012-09-0404 September 2012 Mid Cycle Assessment Letter Turkey Point 2012 ML1206502742012-03-0505 March 2012 EOC Report 22 ML1124403682011-09-0101 September 2011 Report 22 - Turkey Point ML1106302102011-03-0404 March 2011 Inspection/Activity Plan, Report 22, 03/01/2011 - 06/30/2012 ML1024408162010-09-0101 September 2010 Report 22 - 2010 Mid-Cycle, Inspection/Activity Plan 09/01/2010 - 12/31/2011 ML1006206272010-03-0303 March 2010 Report 22 - 201001, Inspection/Activity Plan ML0924404362009-09-0101 September 2009 Report 22, Inspection/Activity Plan, 09/01/2009 - 12/31/2010 ML0906306152009-03-0404 March 2009 Report 22 - Inspection/Activity Plan 03/01/2009 - 06/30/2010 ML0824610222008-09-0202 September 2008 Inspection/Activity Plan, 09/01/2008 - 12/31/2009, Report 22 ML0724305032007-08-31031 August 2007 Inspection/Activity Plan 09/01/2007-03/31/2009 ML0706000422007-03-0101 March 2007 Inspection / Activity Plan 03/01/2007 - 09/30/2008 ML0624302952006-08-30030 August 2006 Mid-Cycle Performance Review and Inspection Plan, 08/01/06 - 07/31/07 IR 05000250/20060012006-03-0202 March 2006 Inspection/Activity Plan - Turkey Point Nuclear Plant (NRC Inspection Report 05000250-06-001 and 05000251-06-001) 2024-02-28
[Table view] Category:Letter
MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000250/LER-2024-002-01, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 2024-09-25
[Table view] |
Text
August 21, 2023
SUBJECT:
UPDATED INSPECTION PLAN FOR TURKEY POINT UNITS 3 & 4 (REPORT 05000250/2023005 AND 05000251/2023005)
Dear Bob Coffey:
The enclosed inspection plan lists the inspections scheduled through June 30, 2025, for Turkey Point Units 3 & 4. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4628 with any questions you have regarding this letter.
Sincerely, Signed by Dumbacher, David on 08/21/23 David E. Dumbacher, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 05000250, 05000251, 07200062 License No. DPR 31 and DPR 41 Enclosure:
Turkey Point Inspection/Activity Plan (09/01/2023- 06/30/2025)
cc w/ encl: Distribution via LISTSERV
ML23233A093 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available OFFICE RII: DRP RII: DRP NAME N. Childs D. Dumbacher DATE 08/21/23 08/21/23
Site Inspection Activity Plan 07200062 - Turkey Point (ISFSI)
09/01/2023 - 06/30/2025 Unit Start End Activity CAC Title Staff Count SECURITY BASELINE ISFSI 1 5/20/2024 5/24/2024 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations CONSTRUCTION OF AN ISFSI 2 6/10/2024 6/14/2024 IP 60853 000999 On-Site Fabrication Of Components And Construction Of An ISFSI OPERATION OF AN ISFSI 2 6/2/2025 6/6/2025 IP 60855 001001 Operation Of An ISFSI Enclosure
Site Inspection Activity Plan Turkey Point 09/01/2023 - 06/30/2025 Unit Start End Activity CAC Title Staff Count TURKEY POINT REQUAL INSPECTION 2 3,4 9/11/2023 9/15/2023 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance UNIT 4 IN-SERVICE INSPECTION 1 4 10/2/2023 10/6/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP PUBLIC RAD SAFETY BASELINE INSPECTION 2 3,4 10/30/2023 11/3/2023 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 3,4 10/30/2023 11/3/2023 IP 71124.07 000731 Radiological Environmental Monitoring Program 3,4 10/30/2023 11/3/2023 IP 71151 000746 Performance Indicator Verification MATERIAL CONTROL AND ACCOUNTING 1 3,4 11/13/2023 11/17/2023 IP 71130.11 000742 Material Control and Accounting (MC&A)
EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2 3,4 1/22/2024 1/26/2024 IP 71114.02 000717 Alert and Notification System Testing 3,4 1/22/2024 1/26/2024 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 3,4 1/22/2024 1/26/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 3,4 1/22/2024 1/26/2024 IP 71114.05 000720 Maintenance of Emergency Preparedness 3,4 1/22/2024 1/26/2024 IP 71151 001397 Performance Indicator Verification FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - TPN 5 3,4 2/5/2024 2/9/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 3,4 2/26/2024 3/1/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing FOCUSED ENGINEERING INSPECTION (AGE-RELATED) 3 3,4 3/4/2024 3/8/2024 IP 71111.21N.04 001832 Age-Related Degradation 3,4 3/18/2024 3/22/2024 IP 71111.21N.04 001832 Age-Related Degradation FPL CORPORATE SECURITY INSPECTION AA/FFD 2 3,4 4/15/2024 4/19/2024 IP 71130.01 000733 Access Authorization 3,4 4/15/2024 4/19/2024 IP 71130.08 000740 Fitness For Duty Program SECURITY BASELINE INSPECTION 3 3,4 5/20/2024 5/24/2024 IP 71130.01 000733 Access Authorization 3,4 5/20/2024 5/24/2024 IP 71130.02 000734 Access Control 3,4 5/20/2024 5/24/2024 IP 71130.08 000740 Fitness For Duty Program 3,4 5/20/2024 5/24/2024 IP 71130.09 001656 Security Plan Changes 3,4 5/20/2024 5/24/2024 IP 71151 001338 Performance Indicator Verification CONSTRUCTION OF AN ISFSI 2 3,4 6/10/2024 6/14/2024 IP 60853 000999 On-Site Fabrication Of Components And Construction Of An ISFSI
Site Inspection Activity Plan COMPREHENSIVE ENGINEERING TEAM INSPECTION (CETI) 7 3,4 6/10/2024 6/14/2024 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 3,4 6/24/2024 6/28/2024 IP 71111.21M 000713 Comprehensive Engineering Team Inspection TURKEY POINT INITIAL EXAM 5 3,4 6/2/2024 6/8/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
3,4 7/7/2024 7/20/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
UNIT 3 IN-SERVICE INSPECTION +SG 2 3 10/21/2024 11/1/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP OCCUPATIONAL RAD SAFETY AND TRANSPORTATION BASELINE INSPECTION 2 3,4 10/21/2024 10/25/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3,4 10/21/2024 10/25/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 3,4 10/21/2024 10/25/2024 IP 71151 000746 Performance Indicator Verification EMERGENCY PREPAREDNESS EXERCISE INSPECTION 5 3,4 2/10/2025 2/14/2025 IP 71114.01 000716 Exercise Evaluation 3,4 2/10/2025 2/14/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 3,4 2/10/2025 2/14/2025 IP 71151 001397 Performance Indicator Verification TURKEY POINT INITIAL EXAM 4 3,4 1/26/2025 2/1/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
3,4 3/2/2025 3/15/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
UNIT 4 IN-SERVICE INSPECTION +SG 2 4 3/17/2025 3/28/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP OCCUPATIONAL RADIATION SAFETY BASELINE INSPECTION 3 3,4 3/3/2025 3/7/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3,4 3/3/2025 3/7/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 3,4 3/3/2025 3/7/2025 IP 71124.04 000728 Occupational Dose Assessment 3,4 3/3/2025 3/7/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 3,4 3/3/2025 3/7/2025 IP 71151 000746 Performance Indicator Verification 3,4 3/31/2025 4/4/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3,4 3/31/2025 4/4/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 3,4 3/31/2025 4/4/2025 IP 71124.04 000728 Occupational Dose Assessment 3,4 3/31/2025 4/4/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 3,4 3/31/2025 4/4/2025 IP 71151 000746 Performance Indicator Verification OPERATION OF AN ISFSI 2 3,4 6/2/2025 6/6/2025 IP 60855 001001 Operation Of An ISFSI FOCUSED ENGINEERING INSPECTION (FPTI) 4 3,4 6/2/2025 6/6/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
Site Inspection Activity Plan 3,4 6/16/2025 6/20/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
4