DCL-84-136, Forwards Corrections to Responding to Issues Discussed in 840328 & 0402 Meetings W/Nrc Re Board Notification 84-071.Related Correspondence

From kanterella
Revision as of 01:07, 26 September 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Corrections to Responding to Issues Discussed in 840328 & 0402 Meetings W/Nrc Re Board Notification 84-071.Related Correspondence
ML20084J812
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 04/05/1984
From: Schuyler J
PACIFIC GAS & ELECTRIC CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
DCL-84-136, NUDOCS 8405100077
Download: ML20084J812 (2)


Text

o s obb /-

f+Q @LATEDconREs?Oxozner f / $

PACIFIC CrA S A N D E LE C T RI C CCMPANY F f BOWS '

e 77 EEALZ STREET
  • SAN FRANCISCO. CALIFORNI A 94106 = (4I8) 74hE EIEEEX 910 372 6587 J.O.SCMUYLER

..u ,.ccm

. a u . . u . """*' 84 tiAY -9 P3 :26 April 5, 1984 PGandE Letter No.. 6C b Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. ,20555 Re: Docket No. 50-275, OL-DPR-76 Diablo Canyon Unit 1 P,esponse to Board Notification 84-071, Errata Sheet

Dear Mr. Denton:

This submittal provides corrections to PGandE's April 4, 1984 letter (DCL-84-131) which responded to issues discussed in meetings on March 28 and April 2, 1984 between PGandE and the NRC Staff.

This is also being supplied to the Advisory Committee on Reactor Safeguards as part of PGandE's presentation to that Committee, scheduled for April 6,1984.

Kindly acknowledge receipt of this material on the enclosed copy of this letter'and return it in the enclosed addressed envelope.

Sincerely, d.U. OGTluyter Enclosure cc: G. W. Knighton J. B. Martin J. C. McKinley (ACRS)

H. E. Schierling Service List

~

$ fo$$ PDR Q

[C]

l PGandE Letter No.: DCL-84-136 ENCLOSURE e

Errata Sheet

p. 2 line 1 - change " impacted" to " impact" and "have" to "has" ,
p. 2 lines 2 delete sentence "This assessment..... final design."

l

p. 3 line 3 - insert " Program" after "PGandE QA"
p. 4 line 4 - insert " Project" after "all PGandE"
p. 5 next to last line on page - put a period after " area" and delete remainder of sentence
p. 17 last sentence - delete 4
p. 25 insert the following sentence before the quoted language "Also as discu.ssed in PGandE's February 7, 1984 letter to the NRC:"
p. 26 insert the following sentence immediately before the last sentence

" Piping Procedure P-1, was recently revised to require periodic supervisory review of controlled manuals since the monthly review previously required may not always be frequent enough."

p. 29 last sentence of the " Summary Response" paragraph - delete second set of repeated words "no effect"
p. 30 insert at the end of the fourth sentence of the " Summary Response" paragraph the following "(only 17 instances have been identified)"
p. 42 in the first sentence of the second paragraph change "have used used" to read "have been used"
p. 46 in the fourth sentence of the " Summary Response" paragraph add the words " computer analyzed" between the words "the" and "small" to read "the computer analyzed small bore..."
p. 47 middle of the page - the heading " Support 57-60" should read " Support 99-20"
p. 97 delete the last word on the page 0841d/0009K l

. _ . - . . -