MONTHYEAR1CAN109906, Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 11999-10-19019 October 1999 Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 ML20217J4971999-10-18018 October 1999 Requests Addl Info Re Results of Util Most Recent Steam Generator Insp at ANO-2 & Util Methodology Used to Predict Future Performance of SG Tubes ML20217J3871999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through SG, Rev 0 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109902, Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs1999-10-15015 October 1999 Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs ML20217J3601999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Integranular Attack in Tubesheets of Once-Through SG, Rev 1 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109903, Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp1999-10-14014 October 1999 Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp ML20217D1721999-10-0808 October 1999 Forwards RAI Re 990729 Request for Amend to TSs Allowing Special SG Insp for Plant,Unit 2.Questions Re Proposed Insp Scope for Axial Cracking Degradation in Eggcrate Support Region Submitted.Response Requested by 991015 1CAN109905, Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included1999-10-0404 October 1999 Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included ML20212L0621999-10-0101 October 1999 Forwards Safety Evaluation & Exemption from Certain Requirements of 10CFR50,App R,Section III.G.2, Fire Protection of Safe Shutdown Capability 1CAN099908, Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria1999-09-30030 September 1999 Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria 2CAN099902, Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,20001999-09-29029 September 1999 Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 1CAN099903, Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.31999-09-27027 September 1999 Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative1999-09-26026 September 1999 Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative 1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data1999-09-24024 September 1999 Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data 2CAN099901, Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 9908271999-09-24024 September 1999 Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 2CAN099904, Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR1999-09-23023 September 1999 Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR ML20212F5031999-09-22022 September 1999 Forwards SER Granting Relief Requests 1-98-001 & 1-98-002 Which Would Require Design Mods to Comply with Code Requirements,Which Would Impose Significant Burden Pursuant to 10CFR50.55a(g)(6)(i) 1CAN099905, Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments1999-09-17017 September 1999 Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments ML20212D9961999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Arkansas Nuclear One.Nrc Plan to Conduct Core Insps at Facility Over Next 7 Months.Details of Insp Plan Through March 2000 Encl 1CAN099902, Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld1999-09-15015 September 1999 Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld 2CAN099905, Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested1999-09-0909 September 1999 Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested 1CAN099901, Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments1999-09-0707 September 1999 Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) 0CAN099906, Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs1999-09-0101 September 1999 Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs ML20211L4901999-09-0101 September 1999 Forwards Insp Repts 50-313/99-12 & 50-368/99-12 on 990711- 0821.No Violations Noted ML20211J2351999-08-31031 August 1999 Forwards Request for Addl Info Re SG Outer Diameter Intergranular Attack Alternate Repair Criteria for Plant, Unit 1 ML20211E6161999-08-25025 August 1999 Forwards Amend 15 to ANO Unit 2,USAR,per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of 10CFR50.59 Evaluations Associated with Amend 15 of ANO Unit 2 SAR Will Be Provided Under Separate Cover Ltr with 30 Days 0CAN089905, Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 19991999-08-25025 August 1999 Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 1999 ML20211F4181999-08-25025 August 1999 Forwards SE Accepting Licensee 980603 & 990517 Requests for Approval of risk-informed Alternative to 1992 Edition of ASME BPV Code Section Xi,Insp Requirements for Class 1, Category B-J Piping Welds ML20211G0731999-08-19019 August 1999 Forwards Applications for Renewal of Operating License for Kw Canitz & Aj South.Without Encls 1CAN089904, Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl1999-08-19019 August 1999 Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl 0CAN089903, Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves1999-08-12012 August 1999 Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves IR 05000368/19990111999-08-12012 August 1999 Forwards Insp Repts 50-313//99-11 & 50-368/99-11 on 990719-23.No Violations Noted.Insp Focused on Review of Licensed Operator Requalification Program & Observation of Requalification Exam Activities at Unit 1 2CAN089901, Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 9907291999-08-0606 August 1999 Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 990729 1CAN089902, Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License1999-08-0505 August 1999 Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License 2CAN089902, Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested1999-08-0404 August 1999 Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams 0CAN089902, Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified1999-08-0202 August 1999 Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified 0CAN089901, Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 9906031999-08-0202 August 1999 Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 990603 ML20210L3581999-07-29029 July 1999 Ltr Contract,Task Order 43, Arkansas Nuclear One Safety System Engineering Insp (Ssei), Under Contract NRC-03-98-021 1CAN079903, Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks1999-07-29029 July 1999 Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks ML20216D8131999-07-28028 July 1999 Forwards Request for Addl Info Re SG Tube End Cracking Alternate Repair Criteria for Plant,Unit 1 ML20216D3561999-07-23023 July 1999 Discusses non-cited Violation Identified in Insp Rept 50-313/98-21,involving Failure to Have Acceptable Alternative Shutdown Capability for ANO-1 ML20210C2191999-07-21021 July 1999 Forwards Insp Repts 50-313/99-08 & 50-368/99-08 on 990530-0710 at Arkansas Nuclear One,Units 1 & 2,reactor Facility.No Violations Noted.Conduct of Activities at Plant Generally Characterized by safety-conscious Operations ML20209H5251999-07-15015 July 1999 Informs That as Result of NRC Review of Licensee 980701 & 990311 Responses to GL 92-01,rev 1 & Suppl 1 & Suppl 1 RAI, Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 1CAN079901, Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages1999-07-14014 July 1999 Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages 0CAN079902, Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl1999-07-14014 July 1999 Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl ML20209E5551999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1,staff Revised Info in Rv Integrity Database & Releasing Database as Rvid Version 2 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217J4971999-10-18018 October 1999 Requests Addl Info Re Results of Util Most Recent Steam Generator Insp at ANO-2 & Util Methodology Used to Predict Future Performance of SG Tubes ML20217J3871999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through SG, Rev 0 Marked as Proprietary Will Be Withheld from Public Disclosure ML20217J3601999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Integranular Attack in Tubesheets of Once-Through SG, Rev 1 Marked as Proprietary Will Be Withheld from Public Disclosure ML20217D1721999-10-0808 October 1999 Forwards RAI Re 990729 Request for Amend to TSs Allowing Special SG Insp for Plant,Unit 2.Questions Re Proposed Insp Scope for Axial Cracking Degradation in Eggcrate Support Region Submitted.Response Requested by 991015 ML20212L0621999-10-0101 October 1999 Forwards Safety Evaluation & Exemption from Certain Requirements of 10CFR50,App R,Section III.G.2, Fire Protection of Safe Shutdown Capability ML20212F5031999-09-22022 September 1999 Forwards SER Granting Relief Requests 1-98-001 & 1-98-002 Which Would Require Design Mods to Comply with Code Requirements,Which Would Impose Significant Burden Pursuant to 10CFR50.55a(g)(6)(i) ML20212D9961999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Arkansas Nuclear One.Nrc Plan to Conduct Core Insps at Facility Over Next 7 Months.Details of Insp Plan Through March 2000 Encl ML20211L4901999-09-0101 September 1999 Forwards Insp Repts 50-313/99-12 & 50-368/99-12 on 990711- 0821.No Violations Noted ML20211J2351999-08-31031 August 1999 Forwards Request for Addl Info Re SG Outer Diameter Intergranular Attack Alternate Repair Criteria for Plant, Unit 1 ML20211F4181999-08-25025 August 1999 Forwards SE Accepting Licensee 980603 & 990517 Requests for Approval of risk-informed Alternative to 1992 Edition of ASME BPV Code Section Xi,Insp Requirements for Class 1, Category B-J Piping Welds IR 05000368/19990111999-08-12012 August 1999 Forwards Insp Repts 50-313//99-11 & 50-368/99-11 on 990719-23.No Violations Noted.Insp Focused on Review of Licensed Operator Requalification Program & Observation of Requalification Exam Activities at Unit 1 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210L3581999-07-29029 July 1999 Ltr Contract,Task Order 43, Arkansas Nuclear One Safety System Engineering Insp (Ssei), Under Contract NRC-03-98-021 ML20216D8131999-07-28028 July 1999 Forwards Request for Addl Info Re SG Tube End Cracking Alternate Repair Criteria for Plant,Unit 1 ML20210C2191999-07-21021 July 1999 Forwards Insp Repts 50-313/99-08 & 50-368/99-08 on 990530-0710 at Arkansas Nuclear One,Units 1 & 2,reactor Facility.No Violations Noted.Conduct of Activities at Plant Generally Characterized by safety-conscious Operations ML20209H5251999-07-15015 July 1999 Informs That as Result of NRC Review of Licensee 980701 & 990311 Responses to GL 92-01,rev 1 & Suppl 1 & Suppl 1 RAI, Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20209E5551999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1,staff Revised Info in Rv Integrity Database & Releasing Database as Rvid Version 2 ML20209D8521999-07-0707 July 1999 Responds to Util 990706 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required by TS 3.7.2, Auxiliary Electrical Sys. NOED Warranted & Approval Granted for Extension of Allowed Outage Time to 14 Days ML20209A8561999-06-25025 June 1999 Refers to Investigation Rept A4-1998-042 Re Potential Falsification of Training Record by Senior Licensed Operator at Arkansas Nuclear One Facility.Nrc Concluded That Training Attendance Record Falsified IR 05000313/19990071999-06-21021 June 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-313/99-07 & 50-368/99-07 Issued on 990514.Adequacy of Min Staffing Levels May Be Reviewed During Future Insps ML20196D4241999-06-21021 June 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp of License SOP-43716 Issued on 990325.Believes That NRC Concerns Have Been Adequately Addressed at Present ML20207H3551999-06-10010 June 1999 Forwards Insp Repts 50-313/99-05 & 50-368/99-05 on 990411-0529.No Violations Noted ML20195G3481999-06-0909 June 1999 Ack Receipt of ,Transmitting Changes to Facility Emergency Plan,Rev 25,under Provisions of 10CFR50,App E, Section V IR 05000313/19993011999-06-0909 June 1999 Discusses Arrangements for Administration of Licensing Exam During Wk of 991213,per Telcon of 990602.As Agreed,Exams Repts 50-313/99-301 & 50-368/99-301 Will Be Prepared Based on Guidelines in Rev 8 of NUREG-1021 ML20195F1631999-06-0808 June 1999 Forwards Insp Repts 50-313/99-06 & 50-368/99-06 on 990524-28.Violation Identified & Being Treated as Noncited Violation ML20207G3111999-06-0707 June 1999 Ack Receipt of Changes to ANO EP Implementing Prcoedure 1903.010,Emergency Action Level Classification,Rev 34 PC-2, Received on 981218,under 10CFR50,App E,Section V Provisions. No Violations Identified ML20207G7951999-06-0707 June 1999 Forwards Notice of Violation Re Investigation Rept A4-1998-042 Re Apparent Violation Involving Initialing Record to Indicate Attendance at Required Reactor Simulator Training Session Not Attended ML20207E7131999-06-0202 June 1999 Discusses EOI 990401 Request for Alternative to Requirements of Iwl for Arkansas Nuclear One,Pursuant to 10CFR50.55a(g)(6)(ii)(B) & ASME BPV Code Section XI & Forwards Safety Evaluation Accepting Proposed Alternative ML20207B9521999-05-26026 May 1999 Discusses GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. Staff Will Conduct Limited Survey in to Identify Sampling ML20207B4171999-05-24024 May 1999 Forwards Corrected Cover Ltr to Insp Repts 50-313/99-07 & 50-368/99-07 Issued 990514 with Incorrect Insp Closing Date ML20207A7771999-05-24024 May 1999 Forwards Insp Repts 50-313/98-21 & 50-368/98-21 on 981116-990406.One Violation of NRC Requirements Occurred & Being Treated as Noncited Violation,Consistent with App C of Enforcement Policy ML20206U4541999-05-17017 May 1999 Discusses Util & Suppl Re Changes to License NPF-06,App a TSs Bases Section.Staff Offers No Objection to These Bases Changes.Affected Bases Pages,B 202, B 2-4,B 2-7,B 3/4 2-1,B 3/4 2-3 & B 3/4 6-4,encl ML20206S4721999-05-14014 May 1999 Forwards Insp Repts 50-313/99-07 & 50-368/99-07 on 990426- 30.No Violations Noted.However,Nrc Requests That Util Provide Evaluation of Licensee Provisions to Maintain Adequate Level of Response Force Personnel on-site ML20207B4271999-05-14014 May 1999 Corrected Ltr Forwarding Insp Repts 50-313/99-07 & 50-368/99-07 on 990426-30.No Violations Noted.Areas Examined During Insp Included Portions of Physical Security Program ML20206R4741999-05-13013 May 1999 Informs That Staff Reviewed Draft Operation Insp Rept for Farley Nuclear Station Cooling Water Pond Dam & Concurs with FERC Findings.Any Significant Changes Made Prior to Issuance of Final Rept Should Be Discussed with NRC ML20206N7011999-05-12012 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Management Created ML20206M7581999-05-11011 May 1999 Forwards SE Accepting Relief Request from ASME Code Section XI Requirements for Plant,Units 1 & 2 ML20206S1761999-05-11011 May 1999 Responds to Informing of Changes in Medical Condition & Recommending License Restriction for Senior Reactor Operator.No Change Was Determined in Current License Conditions for Individual ML20206N4161999-05-11011 May 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-related Logic Circuits, for Plant,Units 1 & 2 ML20206S4211999-05-10010 May 1999 Forwards Insp Repts 50-313/99-04 & 50-368/99-04 on 990228- 0410.Four Violations of NRC Requirements Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20206H1031999-05-0606 May 1999 Forwards Results of Gfes of Written Operator Licensing Exam, Administered on 990407,to Nominated Employees of Facility. Requests That Training Dept Forward Individual Answer Sheet & Results to Appropriate Individuals.Without Encl ML20206F0611999-04-29029 April 1999 Forwards SE Accepting Licensee Re ISI Plan for Third 10-year Interval & Associated Requests for Alternatives for Plant,Unit 1 ML20205R6331999-04-20020 April 1999 Ack Receipt of Which Transmitted Rev 39 to ANO Industrial Security Plan,Submitted Under Provisions of 10CFR50.54(p).No NRC Approval Is Required,Since Util Determined Changes Do Not Decrease Effectiveness of Plan ML20205P4641999-04-15015 April 1999 Forwards for Review & Comment Draft Info Notice That Describes Unanticipated Reactor Water Draindown at Quad Cities Nuclear Power Station Unit 2,Arkansas Nuclear One Unit 2 & Ja Fitzpatrick NPP ML20205N7251999-04-13013 April 1999 Forwards Summary of 990408 Meeting with EOI in Jackson, Mississippi Re EOI Annual Performance Assessment of Facilities & Other Issues of Mutual Interest.List of Meeting Attendees & Licensee Presentation Slides Encl ML20205M6881999-04-12012 April 1999 Forwards Safety Evaluation on Second 10-year Interval Inservice Insp Request Relief 96-005 ML20205L7711999-04-0909 April 1999 Forwards Insp Repts 50-313/99-03 & 50-368/99-03 on 990202- 17.No Violations Noted ML20205K7681999-04-0606 April 1999 Forwards RAI Re risk-informed Alternative to Certain Requirements of ASME Code 11,table IWB-2500-1 ML20205G8871999-04-0202 April 1999 Forwards RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, for Plant, Units 1 & 2.Response Requested within 60 Days of Date of Ltr 1999-09-22
[Table view] |
Text
- - - - -
\ [pm%jo UNITED STATES
[
>o'g p, NUCLE AR REGULATORY COMMISSION w AsmHGTON, D. C. 20555
-l l January 22, 1993
\ . . . . . #'
Dra -t No. 50-368 Mr. Jerry W. Yelverton Vice President, Operations ANO Entergy Operations, Inc.
Route 3 Box 137G Russellville, Arkansas 72801
Dear Mr. Yelverton:
SUBJECT:
SAFETY EVALUATION RELATED TO THE INSERVICE TESTING (IST) PROGRAM REllEF REQUESTS FOR PUMPS AND VALVES, ARKANSAS NUCLEAR ONE, UNIT 2 (AND-2) (TAC N05. M76103 AND M82849)
By letter dated August 9,1991 Entergy Operations (the licensee) submitted Revision 1 of the ANO-2 second 10-year pump and valve inservice testing (IST) program. Revision 1 superseded Revision 0 that was submitted on' January 12, 1990. Additional information concerning the IST program was sent by letter dated February 13, 1992. The enclosed Safety Evaluation (SE), which includes the table in Attachment 1, was prepared by the NRC staff to provide the results of the staff review of the information relating to relief requests contained in these submittals.
Title 10 of the Code of Federal Regulations,10 CFR 50.55a, requires that inservice testing of certain ASME Code Class 1, 2, and 3 pumps and valves be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable addenda, except where alternatives are authorized or relief is granted by the Commission pursuant to 10 CFR50.55a(a)(3)(i),
(a)(3)(ii), or (f)(6)(i). In order to obtain authorization or relief, the licensee must demonstrate that (1) the proposed alternatives-provide an acceptable level of quality and safety, (2) compliance would result in-hardship or unusual difficulty without a compensating increase in the level of quality and safety, or (3) conformance is impractical for its facility.
Guidance on acceptable alternatives to Section XI requirements was provided by the NRC in Generic letter (GL) 89-04 for certain aspects of IST.
The NRC staff, with technical assistance from EG&G Idaho, Inc. (EG&G), has reviewed the information concerning the IST program relief requests submitted for ANO-2. The staff adopts the evaluations and conclusions coMained in the Technical Evaluation Report (TER) (Attachment 2) prepared by EG1G except for a wording change: the term " relief granted" in the conclusions should be replaced by " alternative authorized" for those requests approved pursuant to 10 CFR 50.55a(a)(3)(i) and (a)(3)(ii). This wording change also applies to the table in Attachment 1 of the SE, which presents a summary of the relief request determinations for the August 9, 1991, cubmittal. In addition, the staff notes that the TER references an incorrect second 10-year inspection interval and references a July 31, 1991, letter that is not relevant to the enclosed SE. Relief request PR-6, contained in a letter dated February 13, 1992, was evaluated separately by the staff and is addressed in Section 2.1 of q the SE. fi 9302040196 930122 ~ -
b ;
PDR ADOCK 05000368 f~
P PDR-
Mr. Jerry W. Yelverton I The staff is granting relief from certain testing requirements that are impractical to perform and authorizing proposed alternatives where compliance would result in a hardship without a compensating increase in safety or where the alternative testing provides an acceptable level of quality- and safety.
The IST program relief requests for ANO-2 in the August 9,1991, and February 13, 1992, submittals are acceptable for implementation provided (1) the anomalies identified in Appendix A of the TER and SE Section 2.1.2 are addressed within one year of the date of this SE and (2) the procedural or program changes covered in the anomalies are completed within one year of the date of this SE, or by the end of the next refueling outage, whichever is later. The granting of relief or authorization of alternatives is baced upon the fulfillment of any commitments made by the licensee in the basis for each relief request and the alternatives proposed.
We have determined that the granting of relief is authorized by law, will not endanger life or property or the common defense and security, and is otherwise in the public interest. In making this determination, we have given due consideration to the burden that could result if the applicable ASME Code requirements were imposed on your facility. This letter grants the relief identified above.
Program changes involving new or revised requests for relief or authorization of alternatives should not be implemented prior to appreval by the NRC, unless they meet the positions b GL 89-04, Attachment 1. New or revised requests that meet the positions in GL 89-04, Attachment 1, should be submitted to the NRC but can be implemented provided the guidance in GL 89-04, Section D, is followed. Program changes that add or delete components from the IST program should also be provided to the NRC.
This action closes out TAC Nos. M76103 and M82849.
Sincerely, ORIGINAL SIGNED BY:
George T. Hubbard, Acting Director Project Directorate IV-1 Division of Reactor Projects - lil/IV/V Office of Nuclear Reactor Regulation
Enclosure:
Safety Evaluation cc w/ enclosure:
See next page DISTRIBUTION:
Docket File NRC & Local PDRs PD4-1 r/f J. Roe T. Murley F. Miraglia J. Partlow B. Grimes M.Virgilio J. Larkins P. Noonan PD4-1 p/f T. Alexion ACRS (10) A. B. Beach J. Lieberman E. Jordan G. Hill (4) OPA OC /LFDCB J. Mitchell 0GC KDempsey NJ_._
0FC LA:PD4-I N PM:PDk(d OGC JfE D:PD4-1
\
NAME PNoonan' TAlexioMn 7/hi GHubbard DATE / f /93 I/ I/93 / // 3/93 f / /7 2/93 0FFICIAL RECORD COPY Document Name: AR1747 6.ltr
<k /p cv
q Mr. Jerry y, yelverton ' ~
lhe staff is granting relief from certain testing requirements that are impractical to perform and authorizing proposed alternatives where compliance would result in a hardship without a compensating increase in safety or where the alternative testing provides an acceptable level of quality and safety.
The IST program relief requests for ANO-2 in the August 9, 1991, and February 13, 1992, submittals are acceptable for implementation provided (1) the anomalies identified in Appendix A of the TER and SE Section 2.1.2 are addressed within one year of the date of this SE and (2) the procedural or program changes covered in the anomalies are completed within one year of the date of this SE, or by the end of the next refueling outage, whichever is later. The granting of relief or authorization of alternatives is based upon the fulfillment of any commitments made by the licensee in the basis for each relief request and the alternatives oroposed.
We have determined that the granting of relief is authorized by law, will not endanger life or property or the common defense and security, and is otherwise in the public interest. In making this determination, we have given due consideration to the burden that could result if the applicable ASME Code requirements were imposed on your facility. This letter grants the relief identified above.
Program changes involving new or revised requests for relief or authori7ation of alternatives should not be implemented prior to approval by the NRC, unless they meet the positions in GL 89-04, Attachment 1. New or revised requests that meet the positions in GL 89-04, Attachment 1, should be submitted to the NRC but can be implemented provided the guidance in GL 89-04, Section D, is followed. Program changes that add or delete components from the IST program should also be provided to the NRC.
This action closes out TAC Nos. M76103 and M82849.
Sincerely, ORIGINAL SIGNED BY:
George T. Hubbard, Acting Director Project Directorate IV-1 Division of Reactor Projects - Ill/IV/V Office of Nuclear Reactor Regulation
Enclosure:
Safety Evaluation cc w/ enclosure: 290069 See next page DISTRIBUTION:
-Docket File NRC & Local PDRs PD4-1 r/f J. Roe T. Murley F. Miraglia J. Partlow B. Grimes M.Virgilio J. Larkins P. Noonan PD4-1 p/f T. Alexion ACRS (10) A. B. Beach J. Lieberman E. Jordan G. Hill (4) OPA OC/LFDCB J. Mitchell OGC KDempsey A/L
- 0FC LA:PD4-IJht PM:PDk h OGC Jfd- 0:PD4-1 7 // .h/
NAME PNoonan TAlexichk GHubbard DATE / /5 /93 // I /93 / //J/93 f / /K'/93 0FFICIAL RECORD COPY Document Name: AR1747 6.ltr s dy/y
T ._
tyn j 4-f Mr. Jerry W --Yelverto'n 4- -;2 - l w
The staff is granting relief:from certain testing-requirements that.are: - >
impractical to perform and authorizing proposed alternatives where compliance- ,
would result-in a hardship lwithout a compensating increase:in safety;or where! _ i the alternative testing provides an acceptable level of quality and safety.
The IST program relief requests for ANO-21in'the. August' 9, -1991', Land February 13,1992, submittals are acceptable for . implementation provided; f (I) the anomalies identified in Appendix A of the TER and SE Section' 2.1.2 are :i addressed within one year of the date of this SE- and:(2)-the procedural; or program changes covered in the anomalies are completed within one year. of;the...- A m' date of this SE, or by the end._of the next refueling outage, whichever is later. The granting of relief or authorization of alternatives is based upon1 the fulfillment of any commitments made by the licensee _ in the basis _for each ,
relief request and the alternatives proposed.. ,
We have determined that the granting _ of relief _ is authorized by law,'willinotL .
endanger life or property or the common defense and security, and is: otherwise
~
in the public interest. In making this determination; we have given due >
consideration to the burden that could result if the app 1_icable. ASME: Code -
requirements were imposed on-your facility, This letter grants the relief. e identified above.
Program changes involving new or revised requests for relief or authorization- ,
of alternatives should not be implemented prior toiapproval by the NRC, unlessi-
- they meet the positions in GL 89-04, Attachmentfl.- New or revised requests that meet the positions in GL 89-04, Attachment' 1,:should be submitted to the.
NRC but can be implemented provided the guidance in GL 89-04 Section D, is ;
followed. Program changes that add-or delete components-fromithe-IST program-should also be provided to the NRC.
~
This action closes out' TAC Nos. M76103 and M82849.
Sincerely,- .
f .i George T. Hubbard,:: Acting-Director.
Project Directorate IV Division of_ Reactor Projects --III/IV/V Office of Nuclear Reactor: Regulation
Enclosure:
Safety Evaluation cc w/ enclosure:
See next page 1
E, % -._r ., ,+._
e .4 -,
6
. Mr. Jerry W. Yelverton _
Entergy Operations, Inc. _ Arkansas Nuclear One, Unit 2-CC:
Mr. Donald C. Mintz, President Mr. John R. McGaha and Chief Executive Officer Vice President, Operations Support Entergy Operations, Inc. Entergy Operations,-'Inc.
P. O. Box 31995 P. 0.. Box 31995 Jackson, Mississippi 39286 Jackson, Mississippi 39286-Mr. Robert B. McGehee Mr. James. J. Fisicaro Wise, Carter, Child & Caraway Director, Licensing P. O. Box 651 Entergy Operations, Inc. Jackson, Mississippi 39205 Route 3 Box 137G Russellville, Arkansas 72801 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations-Mr. Nicholas S. Reynolds ABB Combustion Engineering Nuclear Power Winston & Strawn 12300 Twinbrook Parkway, Suite 330-1400 L Street, N.W, Rockville, Maryland 20852 Washington, D.C. 20005-3502 Admiral Kinnaird R. McKee, USN (Ret)
Mr. Robert B. Borsum 214 South Morris Street Licensing Representative Oxford, Maryland 21654 B&W Nuclear Technologies 1700 Rockville Pike, Suite 525 Rockville, Maryland 20852 Senior Resident Inspector U.S. Nuclear Regulatory Commission 1 Nuclear Plant Road Russellville, Arkansas 72801 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Honorable Joe W. Phillips County Judge of Pope County Pope County Courthouse .
Russellville, Arkansas 72801 Ms. Greta Dicus, Director Division of Radiation Control #
.and Emergency Management Arkansas Department of Health 4815 West Markham Street a Little Rock, Arkansas 72205-3867