Annual Assessment Letter for Surry Power Station, Units 1 and 2 (Reports No. 05000280/2021006 and 05000281/2021006)
ML22053A353
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/02/2022
From: Mark Miller
Division Reactor Projects II
To: Stoddard D
Virginia Electric & Power Co (VEPCO)
Stew Bailey
References
IR 2021006
Download: ML22053A353 (6)


Text

March 2, 2022

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 (REPORTS 05000280/2021006 AND 05000281/2021006)

Dear Mr. Stoddard:

The NRC has completed its end-of-cycle performance assessment of Surry Power Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2021, through December 31, 2021. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC concluded that overall performance at your facility preserved public health and safety.

The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.

The NRC determined the performance at Surry Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e.,

Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

In the first quarter of 2021 Surry Power Station Unit 2 was in the Regulatory Response Column (column 2) of the ROP Action Matrix due to a single inspection finding having low-to-moderate safety significance (i.e., White) in the Mitigating Systems Cornerstone, originating in the second quarter of 2020 (ADAMS Accession No. ML20212L517). On December 30, 2020, the NRC issued supplemental inspection report 05000281/2020040 (ADAMS Accession No.

ML20365A007), which stated that your actions to address the performance issue were acceptable and the finding was closed. The NRC informed you that the finding would remain in the NRCs assessment program until March 31, 2021. Plant performance was determined to be in the Licensee Response Column (column 1) of the ROP Action Matrix as of April 1, 2021.

The enclosed inspection plan lists the inspections scheduled through December 31, 2023.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In response to the COVID-19 public health emergency (PHE), the NRC adjusted inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. While the PHE continues, overall conditions throughout the country support performance of our inspection and oversight activities to return to normal onsite presence by our resident and region-based inspectors and completion of nominal baseline inspection samples. We continue to monitor site-specific conditions and as discussed in our November 2, 2021 memo, Implementation of Inspection Programs Following Re-Entry from the Public Health Emergency for the Reactor Safety Program (ML21295A302), it may be necessary to alter how and when we perform our inspection and oversight activities as we balance the importance of protecting the health and safety of our staff with the need to conduct effective oversight that supports the NRCs critical safety mission. For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Stewart Bailey at 301-415-1321 with any questions you have regarding this letter.

Sincerely, Mark S. Digitally signed by Mark S. Miller Miller Date: 2022.03.02 11:41:42 -05'00'

Mark S. Miller, Director Division of Reactor Projects Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37 Enclosure:

Surry Inspection/Activity Plan (03/01/2022- 12/31/2023)

cc Distribution via ListServ SUBJECT: ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 (REPORTS 05000280/2021006 AND 05000281/2021006)

DATED March 2, 2022 DISTRIBUTION:

M. Kowal, RII S. Price, RII N. Doiley, RII OE Mail RIDSNRRDRO RidsNrrPMSurry Resource ROPassessment Resource ROPreports Resource PUBLIC ADAMS Accession No. ML22053A353 OFFICE RII:DRP RII:DRP RII:DRP NAME A Wilson S Bailey M Miller DATE 2/18/2022 02/24/2022 03/02/2022 OFFICIAL AGENCY RECORD

Site Inspection Activity Plan Surry 03/01/2022 - 12/31/2023 Unit Start End Activity CAC Title Staff Count SECURITY BASELINE INSPECTION 1 1, 2 3/7/2022 3/11/2022 IP 71130.02 000734 Access Control 1, 2 3/7/2022 3/11/2022 IP 71151 001338 Performance Indicator Verification PROBLEM IDENTIFICATION & RESOLUTION INSPECTION 4 1, 2 5/9/2022 5/13/2022 IP 71152B 000747 Problem Identification and Resolution 1, 2 5/23/2022 5/27/2022 IP 71152B 000747 Problem Identification and Resolution TARGET SET INSPECTION 2 1, 2 8/8/2022 8/12/2022 IP 71130.14 000743 Review of Power Reactor Target Sets CYBER SECURITY INSPECTION 2 1, 2 8/29/2022 9/2/2022 IP 71130.10 000741 Cybersecurity EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2 1, 2 9/26/2022 9/30/2022 IP 71114.02 000717 Alert and Notification System Testing 1, 2 9/26/2022 9/30/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 9/26/2022 9/30/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 9/26/2022 9/30/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 9/26/2022 9/30/2022 IP 71151 001397 Performance Indicator Verification SECURITY BASELINE INSPECTION 3 1, 2 9/26/2022 9/30/2022 IP 71130.05 000737 Protective Strategy Evaluation 1, 2 9/26/2022 9/30/2022 IP 71130.09 001656 Security Plan Changes RP OCCUPATIONAL RAD SAFETY INSPECTION 3 1, 2 10/17/2022 10/21/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 10/17/2022 10/21/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/17/2022 10/21/2022 IP 71124.04 000728 Occupational Dose Assessment 1, 2 10/17/2022 10/21/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation 1, 2 11/14/2022 11/18/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 11/14/2022 11/18/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 11/14/2022 11/18/2022 IP 71124.04 000728 Occupational Dose Assessment 1, 2 11/14/2022 11/18/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation UNIT 1 IN-SERVICE INSPECTION +SG 1 1 10/24/2022 11/4/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

SURRY REQUAL INSPECTION 2 1, 2 1/8/2023 1/22/2023 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance SECURITY BASELINE INSPECTION 3 Prepared on 2/16/2022 7:20:25 AM 1 of 2

Site Inspection Activity Plan 1, 2 4/3/2023 4/7/2023 IP 71130.02 000734 Access Control 1, 2 4/3/2023 4/7/2023 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 4/3/2023 4/7/2023 IP 71130.07 000739 Security Training 1, 2 4/3/2023 4/7/2023 IP 71130.09 001656 Security Plan Changes 1, 2 4/3/2023 4/7/2023 IP 71151 001338 Performance Indicator Verification UNIT 2 IN-SERVICE INSPECTION +SG 2 2 5/1/2023 5/5/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP OCCUPATIONAL RADIATION SAFETY AND TRANSPORTATION BASELINE 2 1, 2 5/1/2023 5/5/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 5/1/2023 5/5/2023 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 7/17/2023 7/21/2023 IP 71111.07SIX 000700 Heat Sink Performance 1, 2 7/17/2023 7/21/2023 IP 71111.07T 000700 Heat Sink Performance EMERGENCY PREPAREDNESS EXERCISE INSPECTION 5 1, 2 7/17/2023 7/21/2023 IP 71114.01 000716 Exercise Evaluation 1, 2 7/17/2023 7/21/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 7/17/2023 7/21/2023 IP 71151 001397 Performance Indicator Verification SURRY INITIAL LICENSE EXAM 4 1, 2 7/17/2023 7/21/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1, 2 8/21/2023 9/1/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

Prepared on 2/16/2022 7:20:25 AM 2 of 2

Site Inspection Activity Plan 07200055 - Surry (ISFSI)

03/01/2022 - 12/31/2023 Unit Start End Activity CAC Title Staff Count OPERATION OF AN ISFSI 2 1 5/15/2022 5/20/2022 IP 60855 001001 Operation Of An ISFSI Prepared on 2/16/2022 7:20:57 AM 1 of 1