ML110630310

From kanterella
Jump to navigation Jump to search
Inspection / Activity Plan 03/01/2011 - 06/30/2012, EOC Report 22
ML110630310
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/04/2011
From:
NRC/RGN-II
To:
Shared Package
ML110630293 List:
References
Download: ML110630310 (2)


Text

Inspection / Activity Plan Page 1 of 2 03/04/2011 06:59:17 Report 22 03/01/2011 - 06/30/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Surry TI-177

- TI-177 GASEOUS INTRUSION 3

1, 2 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 03/21/2011 03/25/2011 EB3 ISI

- UNIT 2 INSERVICE INSPECTION 2

2 IP Inservice Inspection Activities - PWR 7111108P 04/25/2011 04/29/2011 EB3-LR

- POST-APPROVAL SITE INSPECTION - PHASE 1 2

2 IP Post-Approval Site Inspection for License Renewal 71003 04/25/2011 04/29/2011 EB3SGISI

- UNIT 2 SG INSERVICE INSPECTION 1

2 IP Inservice Inspection Activities - PWR 7111108P 04/25/2011 04/29/2011 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION 4

1, 2 IP Identification and Resolution of Problems 71152B 06/06/2011 06/10/2011 1, 2 IP Identification and Resolution of Problems 71152B 06/20/2011 06/24/2011 EB3HS

- HEAT SINK 1

1, 2 IP Heat Sink Performance 7111107T 06/13/2011 06/17/2011 EB3 LR

- POST-APPROVAL INSPECTION FOR LR 6

1, 2 IP Post-Approval Site Inspection for License Renewal 71003 07/11/2011 07/15/2011 1, 2 IP Post-Approval Site Inspection for License Renewal 71003 07/25/2011 07/29/2011 PSB1EP

- EMERGENCY PREPAREDNESS EXERCISE 2

1, 2 IP Exercise Evaluation 7111401 07/18/2011 07/22/2011 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 07/18/2011 07/22/2011 1, 2 IP Performance Indicator Verification 71151 07/18/2011 07/22/2011 PSB1-RP

- PUBLIC RADIATION PROTECTION BASELINE 5

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/03/2011 10/07/2011 1, 2 IP Occupational Dose Assessment 71124.04 10/03/2011 10/07/2011 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 10/03/2011 10/07/2011 1, 2 IP Radiological Environmental Monitoring Program 71124.07 10/03/2011 10/07/2011 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 10/03/2011 10/07/2011 1, 2 IP Performance Indicator Verification 71151 10/03/2011 10/07/2011 CDBI

- COMPONENT DESIGN BASES INSPECTION 7

1, 2 IP Component Design Bases Inspection 7111121 10/31/2011 11/04/2011 1, 2 IP Component Design Bases Inspection 7111121 11/14/2011 11/18/2011 1, 2 IP Component Design Bases Inspection 7111121 11/28/2011 12/02/2011 1, 2 IP Component Design Bases Inspection 7111121 12/12/2011 12/16/2011 PSB1-RP

- OCCUPATIONAL RP BASELINE WK1 3

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/23/2012 04/27/2012 1, 2 IP Occupational ALARA Planning and Controls 71124.02 04/23/2012 04/27/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Inspection / Activity Plan Page 2 of 2 03/04/2011 06:59:17 Report 22 03/01/2011 - 06/30/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Surry PSB1-RP

- OCCUPATIONAL RP BASELINE WK1 3

1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/23/2012 04/27/2012 1, 2 IP Radiation Monitoring Instrumentation 71124.05 04/23/2012 04/27/2012 1, 2 IP Performance Indicator Verification 71151 04/23/2012 04/27/2012 EB3-LR

- UNIT 1 POST APPROVAL LR - PHASE 1 1

1 IP Post-Approval Site Inspection for License Renewal 71003 04/30/2012 04/30/2012 EB3 ISI

- UNIT 1 INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - PWR 7111108P 04/30/2012 05/04/2012 EB3SGISI

- UNIT 1 SG INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - PWR 7111108P 04/30/2012 05/04/2012 PSB1-RP

- OCCUPATIONAL RP BASELINE WK2 3

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/14/2012 05/18/2012 1, 2 IP Occupational ALARA Planning and Controls 71124.02 05/14/2012 05/18/2012 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/14/2012 05/18/2012 1, 2 IP Radiation Monitoring Instrumentation 71124.05 05/14/2012 05/18/2012 1, 2 IP Performance Indicator Verification 71151 05/14/2012 05/18/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.