Inspection / Activity Plan Page 1 of 2 03/03/2010 07:19:04 Report 22 03/01/2010 - 06/30/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Surry OL EXAM
- INITIAL EXAM PREP 4
1 SURRY/JULY 2010 EXAM AT POWER FACILITIES V23336 06/28/2010 07/02/2010 PSB1EP
- EMERGENCY PREPAREDNESS INSPECTION 1
1, 2 IP Alert and Notification System Evaluation 7111402 07/12/2010 07/16/2010 1, 2 IP Emergency Response Organization Augmentation Testing 7111403 07/12/2010 07/16/2010 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 07/12/2010 07/16/2010 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 07/12/2010 07/16/2010 1, 2 IP Performance Indicator Verification 71151 07/12/2010 07/16/2010 OL EXAM
- INITIAL EXAM - WEEK 1 4
1 SURRY/JULY 2010 EXAM AT POWER FACILITIES V23336 07/26/2010 07/30/2010 OL EXAM
- INITIAL EXAM - WEEK 2 4
1 SURRY/JULY 2010 EXAM AT POWER FACILITIES V23336 08/02/2010 08/06/2010 EB3ISI
- UNIT 1 INSERVICE INSPECTION 1
1 IP Inservice Inspection Activities - PWR 7111108P 11/01/2010 11/05/2010 PSB1-RP
- RP OCCUPATIONAL WEEK 1 3
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/01/2010 11/05/2010 1, 2 IP Occupational ALARA Planning and Controls 71124.02 11/01/2010 11/05/2010 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/01/2010 11/05/2010 1, 2 IP Occupational Dose Assessment 71124.04 11/01/2010 11/05/2010 1, 2 IP Radiation Monitoring Instrumentation 71124.05 11/01/2010 11/05/2010 1, 2 IP Performance Indicator Verification 71151 11/01/2010 11/05/2010 PSB1-RP
- RP OCCUPATIONAL WEEK2 2
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/15/2010 11/19/2010 1, 2 IP Occupational ALARA Planning and Controls 71124.02 11/15/2010 11/19/2010 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/15/2010 11/19/2010 1, 2 IP Occupational Dose Assessment 71124.04 11/15/2010 11/19/2010 1, 2 IP Radiation Monitoring Instrumentation 71124.05 11/15/2010 11/19/2010 1, 2 IP Performance Indicator Verification 71151 11/15/2010 11/19/2010 CDBI
- COMPONENT DESIGN BASIS INSPECTION 5
1, 2 IP Component Design Bases Inspection 7111121 01/10/2011 01/14/2011 1, 2 IP Component Design Bases Inspection 7111121 01/31/2011 02/04/2011 1, 2 IP Component Design Bases Inspection 7111121 02/14/2011 02/18/2011 1, 2 IP Component Design Bases Inspection 7111121 02/28/2011 03/04/2011 TI-177
- TI-177 GASEOUS INTRUSION 3
1, 2 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 03/21/2011 03/25/2011 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Inspection / Activity Plan Page 2 of 2 03/03/2010 07:19:04 Report 22 03/01/2010 - 06/30/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Surry EB3ISI
- UNIT 2 INSERVICE INSPECTION 1
2 IP Inservice Inspection Activities - PWR 7111108P 04/25/2011 04/29/2011 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION 4
1, 2 IP Identification and Resolution of Problems 71152B 06/06/2011 06/10/2011 1, 2 IP Identification and Resolution of Problems 71152B 06/20/2011 06/24/2011 EB3HS
- HEAT SINK 1
1, 2 IP Heat Sink Performance 7111107T 06/13/2011 06/17/2011 PSB1-RP
- RP PUBLIC RADIATION PROTECTION INSPT 4
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 06/13/2011 06/17/2011 1, 2 IP Occupational Dose Assessment 71124.04 06/13/2011 06/17/2011 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/13/2011 06/17/2011 1, 2 IP Public Radiation Safety 71124.07 06/13/2011 06/17/2011 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 06/13/2011 06/17/2011 1, 2 IP Performance Indicator Verification 71151 06/13/2011 06/17/2011 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure