PNO-IV-87-009:on 870311,steam/water Hammer Event Occurred in Component Cooling Water Lines Servicing RHR HX Trains B & C. Caused by Operator Overlooking Step in Procedure.All Hot Functional Testing Put on Hold Pending Evaluation
ML20207S370
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 03/13/1987
From: Constable G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
References
PNO-IV-87-009, PNO-IV-87-9, NUDOCS 8703190322
Download: ML20207S370 (1)


( -

.> March 13, 1987 PRELIMINARY NOTIFICATION ~0F' EVENT OR UNUS'UAL OCCURRENCE -- PNO-IV-87-09 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The infonnation is as initially received without verification or evaluation, and is basically all that is known by the Region IV staff on this date.

FACILITY: South Texas Project, Unit 1 Licensee Emergency Classification:

Bay City. TX. Notification of Unusual Event Houston Power & Lighting Alert DN: 50-498 Site Area Emergency General Emergency

__X_ Not Applicable

SUBJECT:

WATER HAMER IN COMPONENT COOLING WATER SYSTEM At about 11:00 p.m. (CST) on 3/11/87, during Hot Functional Testing (HFT) with primary system temperature at 350 F, a steam / water hanner event occurred in the Component Cooling Water (CCW) lines servicing the RHR heat exchanger Trains B and C. RHR Trains B and C were being placed in service. An operator apparently overlooked a step in the procedure which led to introducing water to the primary side of the RHR heat exchangers without having CCW flow established. When CCW flow was established, extreme fluctuation of CCW surge tank level was experienced.

Loud banging associated with CCW trains B and C was heard in the Reactor Containment Building and Mechanical Auxiliary Building. The system was secured.

A quick evaluation indicated one box support, three hangers, and one section of CCW piping were badly damaged. Other minor damage was also apparent. All HFT activities have been put on hold pending an engineering and operations evaluation.

The licensee has issued a press release.

The state of Texas will be informed.

Region IV received notification of this occurrence by telecon from the SRI at 8:00 a.m. 3/12/87. Region IV has informed IE/NRR/SP/PA.

This information has been confirmed with a licensee representative.

CONTACT: G.L. Constable (FTS 728-8151)

DISTRIBUTION:

MAIL:

H. St. MNBB E/W Willste IURTDMB (Original)

Chairman Zech EDO IE NMSS DOT:(Transonly)

Conmi. Bernthal PA OIA RES Comm. Roberts ELD AE0D FAX:

Comm. Asselstine MPA VIB- TRP0 Conn. Carr NSAC ACRS SP (Air SECY Phillips Rights)

CA NRR RRI PDR DCS NRC OC LICENSE F Regional Offices (ReactorLicensee) h D:DR RA N

EHJo cs RDMa PNO-IV-87-oo9 PDR cansmitted via 5520 3/13/8 3/13/8 0 8:50 a.m. Op>d