PNO-IV-99-037, on 990822,Region IV Dispatched Inspector to STP to Relieve Resident Inspectors & to Provide Assistance to STP Nuclear Operating Co,In Anticipation of Hurricane Bret.Representative Was Also Dispatched to FEMA Region VI | 23 August 1999 | PNO-IV-99-037:on 990822,Region IV Dispatched Inspector to STP to Relieve Resident Inspectors & to Provide Assistance to STP Nuclear Operating Co,In Anticipation of Hurricane Bret.Representative Was Also Dispatched to FEMA Region VI | |
PNO-IV-97-054, on 971006,premature Lifting of Main Turbine Moisture Separator Reheater Relief Valve Occurred.Licensee Removed Main Turbine Generator from Svc to Repair Relief Valve.Individual Transported Offsite Via Site Ambulance | 6 October 1997 | PNO-IV-97-054:on 971006,premature Lifting of Main Turbine Moisture Separator Reheater Relief Valve Occurred.Licensee Removed Main Turbine Generator from Svc to Repair Relief Valve.Individual Transported Offsite Via Site Ambulance | |
PNO-IV-97-012, on 970222,licensee Transported Potentially Contaminated Individual to Matagorda General Hosp.Individual Received Laceration on Forehead & Another at Lips.State of Tx Will Be Informed | 24 February 1997 | PNO-IV-97-012:on 970222,licensee Transported Potentially Contaminated Individual to Matagorda General Hosp.Individual Received Laceration on Forehead & Another at Lips.State of Tx Will Be Informed | |
PNO-IV-93-033, on 931029,contractor Employee Suffered Heart Attack at Site Outside Protected Area.Employee Transported to Local Hosp Where He Later Died.State of Tx Informed | 1 November 1993 | PNO-IV-93-033:on 931029,contractor Employee Suffered Heart Attack at Site Outside Protected Area.Employee Transported to Local Hosp Where He Later Died.State of Tx Informed | |
PNO-IV-93-003, on 930203,Unit 2 Tripped from Full Power on low-low Steam Generator Level Resulting in turbine-driven Auxiliary Feedwater Pump 24 Trip on Mechanical Overspeed. Cause Not Determined.Reactor Stabilized in Mode 3 | 4 February 1993 | PNO-IV-93-003:on 930203,Unit 2 Tripped from Full Power on low-low Steam Generator Level Resulting in turbine-driven Auxiliary Feedwater Pump 24 Trip on Mechanical Overspeed. Cause Not Determined.Reactor Stabilized in Mode 3 | Boric Acid |
PNO-IV-93-001, on 930112,NOUE Declared as Result of Commencing Reactor Shutdown Due to TS 3.0.3 Requirements. Caused by Inoperable Compensated Low Steam Line Pressure. Licensee Issued Press Release.State of Tx Informed | 13 January 1993 | PNO-IV-93-001:on 930112,NOUE Declared as Result of Commencing Reactor Shutdown Due to TS 3.0.3 Requirements. Caused by Inoperable Compensated Low Steam Line Pressure. Licensee Issued Press Release.State of Tx Informed | |
PNO-IV-91-013, on 910502,secretary of Licensee Security Manager Inadvertently Admitted Loaded Derringer Into Protected Area as She Entered Site on 910502.Employee Later Remembered Weapon in Purse & Reported Event to Security | 2 May 1991 | PNO-IV-91-013:on 910502,secretary of Licensee Security Manager Inadvertently Admitted Loaded Derringer Into Protected Area as She Entered Site on 910502.Employee Later Remembered Weapon in Purse & Reported Event to Security | |
PNO-IV-90-034, on 900929,Unit 1 Manually Tripped & Will Remain Shutdown to Allow Repairs to Bellows in Low Pressure Turbine.Unit 2 Entered First Refueling Outage | 1 October 1990 | PNO-IV-90-034:on 900929,Unit 1 Manually Tripped & Will Remain Shutdown to Allow Repairs to Bellows in Low Pressure Turbine.Unit 2 Entered First Refueling Outage | |
PNO-IV-90-030, on 900910,licensee Declared Unusual Event W/ Reactor at 100% Thermal Power & Reactor Shut Down.Also on 900909,inverter Declared Out of Svc Following Unexpected Trip.No Cause Found.Troubleshooting Continuing | 10 September 1990 | PNO-IV-90-030:on 900910,licensee Declared Unusual Event W/ Reactor at 100% Thermal Power & Reactor Shut Down.Also on 900909,inverter Declared Out of Svc Following Unexpected Trip.No Cause Found.Troubleshooting Continuing | |
PNO-IV-90-025, on 900716,Unit 1 Tripped from 100% Power During Operational Test of Reactor Trip Breaker Trip Actuating Device Which Forced Outage to Exceed 72 H.State of Tx Informed.No Press Release Issued | 17 July 1990 | PNO-IV-90-025:on 900716,Unit 1 Tripped from 100% Power During Operational Test of Reactor Trip Breaker Trip Actuating Device Which Forced Outage to Exceed 72 H.State of Tx Informed.No Press Release Issued | |
PNO-IV-90-024, on 900628,Steam Generator D PORV Found to Have Congealed Electro Hydraulic Control Fluid.Caused by Heat & Moisture from body-to-bonnet Steam Leak on Porv.Reactor Shut Down | 6 July 1990 | PNO-IV-90-024:on 900628,Steam Generator D PORV Found to Have Congealed Electro Hydraulic Control Fluid.Caused by Heat & Moisture from body-to-bonnet Steam Leak on Porv.Reactor Shut Down | |
PNO-IV-89-051A, on 890814,radioactive Contamination Found Outside Radiation Controlled Area in Stairwell of Mechanical Auxiliary Bldg & on 890817,contamination Found in 11A Mab Chiller Open Cooling Sys Discharge Drain.Events Unrelated | 18 August 1989 | PNO-IV-89-051A:on 890814,radioactive Contamination Found Outside Radiation Controlled Area in Stairwell of Mechanical Auxiliary Bldg & on 890817,contamination Found in 11A Mab Chiller Open Cooling Sys Discharge Drain.Events Unrelated | |
PNO-IV-89-051, radioactive Contamination Outside Radiation Controlled Area Discovered.Apparent Cause Associated W/Operation of Radwaste Evaporator.No Contamination Found in Neutralization Basin & No Personnel Contaminated | 15 August 1989 | PNO-IV-89-051:radioactive Contamination Outside Radiation Controlled Area Discovered.Apparent Cause Associated W/Operation of Radwaste Evaporator.No Contamination Found in Neutralization Basin & No Personnel Contaminated | |
PNO-IV-89-048, on 890713,main Transformer 2A Locked Out Due to Transformer Bursting,Causing Mineral Oil to Spill Into Transformer Oil in Recovery Pit.Caused by Loss of Power to Auxiliary Bus.Unit Will Not Be Restarted for 2 to 3 Days | 14 July 1989 | PNO-IV-89-048:on 890713,main Transformer 2A Locked Out Due to Transformer Bursting,Causing Mineral Oil to Spill Into Transformer Oil in Recovery Pit.Caused by Loss of Power to Auxiliary Bus.Unit Will Not Be Restarted for 2 to 3 Days | |
PNO-IV-89-033, on 890512,unusual Event Declared When Two of Four Pressurizer Water Level Indication Channels Inoperable. Reactor Shutdown.Possibly Caused by Valve Disc Stuck on Valve Seat.Insulation Installed on Piping | 15 May 1989 | PNO-IV-89-033:on 890512,unusual Event Declared When Two of Four Pressurizer Water Level Indication Channels Inoperable. Reactor Shutdown.Possibly Caused by Valve Disc Stuck on Valve Seat.Insulation Installed on Piping | Temporary Modification |
PNO-IV-89-026, on 890405,unit Tripped from 11% Power Due to Lockout of Main & Auxiliary Transformers During Attempt to Synchronize Main Generator to Electrical Distribution Sys. Unit in Hot Standby & Startup Not Expected Until 890409 | 6 April 1989 | PNO-IV-89-026:on 890405,unit Tripped from 11% Power Due to Lockout of Main & Auxiliary Transformers During Attempt to Synchronize Main Generator to Electrical Distribution Sys. Unit in Hot Standby & Startup Not Expected Until 890409 | |
PNO-IV-89-025, on 890406,util Declared Notification of Unusual Event at Facility Due to One Inoperable Diesel Generator.Util Declared Diesel Generator 12 Operable After Replacing Defective Resistor in Governor Control Circuit | 6 April 1989 | PNO-IV-89-025:on 890406,util Declared Notification of Unusual Event at Facility Due to One Inoperable Diesel Generator.Util Declared Diesel Generator 12 Operable After Replacing Defective Resistor in Governor Control Circuit | |
PNO-IV-89-024, on 890405,reactor Trip Occurred During Attempt to Synchronize Main Generator to Electrical Distribution Sys.Some Nonsafety Equipment Did Not Function as Expected. Resident Inspectors Will Continue to Monitor Activities | 5 April 1989 | PNO-IV-89-024:on 890405,reactor Trip Occurred During Attempt to Synchronize Main Generator to Electrical Distribution Sys.Some Nonsafety Equipment Did Not Function as Expected. Resident Inspectors Will Continue to Monitor Activities | |
PNO-IV-89-022, on 890328,reactor Power Increased Above 5% for First Time.License Issued Earlier Authorizing Full Power Operation.Power to Be Increased in Increments for Few Wks W/Performance of Equipment & Sys Tests at Various Levels | 30 March 1989 | PNO-IV-89-022:on 890328,reactor Power Increased Above 5% for First Time.License Issued Earlier Authorizing Full Power Operation.Power to Be Increased in Increments for Few Wks W/Performance of Equipment & Sys Tests at Various Levels | |
PNO-IV-89-020, Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants | 23 March 1989 | PNO-IV-89-020:Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants | |
PNO-IV-89-019, on 890315,util Received Allegations Re Util Incompetence & Mismanagement Re Const Costs & Plant Operation.Region IV Formed Multidisciplined Team to Identify Safety Issues.Util Also Conducting Investigation | 16 March 1989 | PNO-IV-89-019:on 890315,util Received Allegations Re Util Incompetence & Mismanagement Re Const Costs & Plant Operation.Region IV Formed Multidisciplined Team to Identify Safety Issues.Util Also Conducting Investigation | |
PNO-IV-89-016, on 890312,initial Criticality Achieved.Region IV Operational Readiness Review Insp Team on Site for First Days of Low Power Operation.Commission Meeting on Full Power License Scheduled for 890328 | 13 March 1989 | PNO-IV-89-016:on 890312,initial Criticality Achieved.Region IV Operational Readiness Review Insp Team on Site for First Days of Low Power Operation.Commission Meeting on Full Power License Scheduled for 890328 | |
PNO-IV-89-013, on 890120,manual Turbine/Generator Trip Initiated When Hydrogen Fueled Fire Occurred in Main Generator.Testing Revealed That Wall Thickness of Bottom Mounted Instrumentation Thimble Tubes Below Requirement | 2 March 1989 | PNO-IV-89-013:on 890120,manual Turbine/Generator Trip Initiated When Hydrogen Fueled Fire Occurred in Main Generator.Testing Revealed That Wall Thickness of Bottom Mounted Instrumentation Thimble Tubes Below Requirement | |
PNO-IV-88-078, on 880923,util Plans to Begin Scheduled Outage to Inspect Bottom Mounted Instrument (Bmi) Tubes.On 880506, Util Reported That Review of Eddy Current Test Data on 58 Bmi Thimble Tubes Revealed Wear on 19 Thimble Tubes | 23 September 1988 | PNO-IV-88-078:on 880923,util Plans to Begin Scheduled Outage to Inspect Bottom Mounted Instrument (Bmi) Tubes.On 880506, Util Reported That Review of Eddy Current Test Data on 58 Bmi Thimble Tubes Revealed Wear on 19 Thimble Tubes | |
PNO-IV-88-072, on 880830,shutdown Began from Approx 45% Power to Repair Main Steam Vent Line Leak Coming from a Sock Weld. Licensee Will Insp Similar Socket Welds on Main Steam & Main Feed Lines Inside Containment During Shutdown | 30 August 1988 | PNO-IV-88-072:on 880830,shutdown Began from Approx 45% Power to Repair Main Steam Vent Line Leak Coming from a Sock Weld. Licensee Will Insp Similar Socket Welds on Main Steam & Main Feed Lines Inside Containment During Shutdown | |
PNO-IV-88-069, on 880824,util 100 H NSSS Acceptance Test Completed.Upon Completion of Review of Startup Test Results by Plant Operations Review Committee,Util Will Be in Position to Begin Commercial Operation.State of Tx Informed | 24 August 1988 | PNO-IV-88-069:on 880824,util 100 H NSSS Acceptance Test Completed.Upon Completion of Review of Startup Test Results by Plant Operations Review Committee,Util Will Be in Position to Begin Commercial Operation.State of Tx Informed | |
PNO-IV-88-066, on 880812,Region IV Notified of Truck Accident on Interstate 10,approx 30 Miles West of Baton Rouge.Truck Carrying Eight New Fuel Assemblies to Facility.Shipping Packages Undamaged.Packages Returned to State of Sc | 12 August 1988 | PNO-IV-88-066:on 880812,Region IV Notified of Truck Accident on Interstate 10,approx 30 Miles West of Baton Rouge.Truck Carrying Eight New Fuel Assemblies to Facility.Shipping Packages Undamaged.Packages Returned to State of Sc | |
PNO-IV-88-060, on 880728,licensee Tripped Reactor from 100% Power as Part of Planned 100% Power Plateau Initial Startup Test Program.Preliminary Results Satisfactory.Unit Will Remain in Hot Shutdown for Repairs | 28 July 1988 | PNO-IV-88-060:on 880728,licensee Tripped Reactor from 100% Power as Part of Planned 100% Power Plateau Initial Startup Test Program.Preliminary Results Satisfactory.Unit Will Remain in Hot Shutdown for Repairs | |
PNO-IV-88-051, failure of Westinghouse DS-416 Electrical Breakers.Failures Could Be Generic Problem.Westinghouse Representatives on Site Observing Testing,Insp & Installation of Subj Breakers | 16 June 1988 | PNO-IV-88-051:failure of Westinghouse DS-416 Electrical Breakers.Failures Could Be Generic Problem.Westinghouse Representatives on Site Observing Testing,Insp & Installation of Subj Breakers | |
PNO-IV-88-050, on 880613,Unit 1 Startup Following 880525 Shutdown Initiated.Subj Notification Issued as Plant Status Update.Maint Activities Performed During Outage.Completion of Testing at 30% Plateau Scheduled for 880619 | 14 June 1988 | PNO-IV-88-050:on 880613,Unit 1 Startup Following 880525 Shutdown Initiated.Subj Notification Issued as Plant Status Update.Maint Activities Performed During Outage.Completion of Testing at 30% Plateau Scheduled for 880619 | |
PNO-IV-88-046, on 880525,steam-driven Main Feedwater Pump Failed.Licensee Preparing to Inspect Main Condenser for Damage.Repairs Should Take Several Days.No One Injured from Flying Debris.Facility Will Remain Shutdown | 26 May 1988 | PNO-IV-88-046:on 880525,steam-driven Main Feedwater Pump Failed.Licensee Preparing to Inspect Main Condenser for Damage.Repairs Should Take Several Days.No One Injured from Flying Debris.Facility Will Remain Shutdown | |
PNO-IV-88-045, on 880521,plant Startup Followed Extended Outage for Performance of Maint Work.Completion of Testing at 30% Plateau Scheduled for 880526.Upon Satisfactory testing,50% Plateau Will Commence on 880527 | 23 May 1988 | PNO-IV-88-045:on 880521,plant Startup Followed Extended Outage for Performance of Maint Work.Completion of Testing at 30% Plateau Scheduled for 880526.Upon Satisfactory testing,50% Plateau Will Commence on 880527 | |
PNO-IV-88-039, on 880506,review of Eddy Current Test Data Revealed Wear on 19 Thimble Tubes.Caused by Flow Induced Vibrations.Util Expecting Recommendation for Corrective Action from Westinghouse | 9 May 1988 | PNO-IV-88-039:on 880506,review of Eddy Current Test Data Revealed Wear on 19 Thimble Tubes.Caused by Flow Induced Vibrations.Util Expecting Recommendation for Corrective Action from Westinghouse | Flow Induced Vibration |
PNO-IV-88-036, util Begun 2 to 3-wk Maint Outage.Startup Testing Completed on 30% Power Testing Plateau.Licensee Also Plans to Replace Corroded Aluminum Bronze Fittings & Valves in Essential Cooling Water Sys.State of Tx Informed | 4 May 1988 | PNO-IV-88-036:util Begun 2 to 3-wk Maint Outage.Startup Testing Completed on 30% Power Testing Plateau.Licensee Also Plans to Replace Corroded Aluminum Bronze Fittings & Valves in Essential Cooling Water Sys.State of Tx Informed | Through Wall Leak Flow Induced Vibration |
PNO-IV-88-030, on 880418,Train a Control Room Ventilation Makeup Supply Damper Failed to Close During Surveillance. Licensee Repaired Failed Damper & Plant Returned to Power Escalation from 13% Power | 18 April 1988 | PNO-IV-88-030:on 880418,Train a Control Room Ventilation Makeup Supply Damper Failed to Close During Surveillance. Licensee Repaired Failed Damper & Plant Returned to Power Escalation from 13% Power | |
PNO-IV-88-024, on 880330,reactor Trip & Safety Injection Occurred Due to Loss of Offsite Power.Caused by Troubleshooting Work on Main Generator Control Circuits to Determine Cause of Main Generator Output Breaker Trip | 31 March 1988 | PNO-IV-88-024:on 880330,reactor Trip & Safety Injection Occurred Due to Loss of Offsite Power.Caused by Troubleshooting Work on Main Generator Control Circuits to Determine Cause of Main Generator Output Breaker Trip | |
ML20148G171 | 17 March 1988 | PNS-IV-88-001:on 880316,telephone Threat Against Util & Plant Received at Corporate Ofc in Houston,Tx.Caller Stated That Two Power Poles Had Been Cut Down.Util Confirmed That Two Poles Had Been Cut Down.Contingency Plans Implemented | |
PNO-IV-88-018, on 880301,local Business Agents for Const Electricians & Pipefitters Stopped Supervision of Field Work.Work Supervised by Nonmanual & Supervisory Personnel. Law Enforcement Authorities Notified Due to Fights | 2 March 1988 | PNO-IV-88-018:on 880301,local Business Agents for Const Electricians & Pipefitters Stopped Supervision of Field Work.Work Supervised by Nonmanual & Supervisory Personnel. Law Enforcement Authorities Notified Due to Fights | |
PNO-IV-88-016, on 880228,reactor Trip Occurred W/Control Rods Positioned for Initial Criticality & Boron Dilution Was in Progress.Caused by Spurious Signal from Loop 3 lo-lo Temp Cold.Test Procedures Modified to Restart Testing | 29 February 1988 | PNO-IV-88-016:on 880228,reactor Trip Occurred W/Control Rods Positioned for Initial Criticality & Boron Dilution Was in Progress.Caused by Spurious Signal from Loop 3 lo-lo Temp Cold.Test Procedures Modified to Restart Testing | |
PNO-IV-87-060, on 871122,auxiliary Feed Sys Vibration Resulting in Pipe Failure Occurred.Occurrence Will Impact Startup Schedule.Licensee Investigating Failure & NRC Monitoring Activities | 23 November 1987 | PNO-IV-87-060:on 871122,auxiliary Feed Sys Vibration Resulting in Pipe Failure Occurred.Occurrence Will Impact Startup Schedule.Licensee Investigating Failure & NRC Monitoring Activities | |
PNO-IV-87-045, on 870913,two of Six Seismic Monitors Recorded Deflation of About 0.01 G & Alarmed.Licensee Contacted Regional & Natl Seismic Monitoring Stations.Insp Shows No Evidence of Damage | 14 September 1987 | PNO-IV-87-045:on 870913,two of Six Seismic Monitors Recorded Deflation of About 0.01 G & Alarmed.Licensee Contacted Regional & Natl Seismic Monitoring Stations.Insp Shows No Evidence of Damage | |
PNO-IV-87-043, on 870903,fire Occurred in Auxiliary Transformer & Switchgear Room 13.8 Kv Busing.Investigation Underway to Determine Cause of Electrical Fault & Resulting Fire | 4 September 1987 | PNO-IV-87-043:on 870903,fire Occurred in Auxiliary Transformer & Switchgear Room 13.8 Kv Busing.Investigation Underway to Determine Cause of Electrical Fault & Resulting Fire | |
PNO-IV-87-040, on 870828,painter Working in Unit 1 Turbine Bldg Injured from Fall of Approx 25 Ft.Painter Transported to Matagorda General Hosp & Then to St Lukes Hosp in Houston | 28 August 1987 | PNO-IV-87-040:on 870828,painter Working in Unit 1 Turbine Bldg Injured from Fall of Approx 25 Ft.Painter Transported to Matagorda General Hosp & Then to St Lukes Hosp in Houston | |
PNO-IV-87-023, on 870430,const Craftsman Fell 30 Ft from Ladder & Suffered Broken Elbow & Concussion.Another Man Onsite Found Dead of Heart Attack | 30 April 1987 | PNO-IV-87-023:on 870430,const Craftsman Fell 30 Ft from Ladder & Suffered Broken Elbow & Concussion.Another Man Onsite Found Dead of Heart Attack | Fatality |
PNO-IV-87-010, on 870317,plant Experienced Failure of Circulating Water Pump Pedestal Casing.Piece of Pedestal Casing Blown Out by Water Pressure Rendering Pump Inoperable.Licensee Assessing Damage & Cause of Event | 18 March 1987 | PNO-IV-87-010:on 870317,plant Experienced Failure of Circulating Water Pump Pedestal Casing.Piece of Pedestal Casing Blown Out by Water Pressure Rendering Pump Inoperable.Licensee Assessing Damage & Cause of Event | |
PNO-IV-87-009A, on 870311,steam/water Hammer Event Occurred in Component Cooling Water Lines Servicing RHR HX Trains B & C.Caused by Operational Errors.After Cooldown from Hot Functional Testing,Sys Damage Will Be Repaired | 13 March 1987 | PNO-IV-87-009A:on 870311,steam/water Hammer Event Occurred in Component Cooling Water Lines Servicing RHR HX Trains B & C.Caused by Operational Errors.After Cooldown from Hot Functional Testing,Sys Damage Will Be Repaired | |
PNO-IV-87-009, on 870311,steam/water Hammer Event Occurred in Component Cooling Water Lines Servicing RHR HX Trains B & C. Caused by Operator Overlooking Step in Procedure.All Hot Functional Testing Put on Hold Pending Evaluation | 13 March 1987 | PNO-IV-87-009:on 870311,steam/water Hammer Event Occurred in Component Cooling Water Lines Servicing RHR HX Trains B & C. Caused by Operator Overlooking Step in Procedure.All Hot Functional Testing Put on Hold Pending Evaluation | |
ML20207P839 | 15 January 1987 | PNS-IV-87-001:during pre-hot Functional Test Insp of Reactor Coolant Pumps,Licensee Discovered 14-inch Metal Spike Inserted Between Rotor & Stator of Loop C.Formal Access Control Established.Insp for Addl Tamperings in Progress | |
PNO-IV-87-004, on 870114,licensee Discovered Problem W/One Diesel Generator While Performing 24 H Preoperational Test. Caused by Stuck Intake Valve Push Rod.Diesel Generator Shutdown & Repaired by Licensee | 14 January 1987 | PNO-IV-87-004:on 870114,licensee Discovered Problem W/One Diesel Generator While Performing 24 H Preoperational Test. Caused by Stuck Intake Valve Push Rod.Diesel Generator Shutdown & Repaired by Licensee | |
PNO-IV-86-034, on 861031,foam Suppression Sys for Emergency Diesel Generator 13 Fuel Oil Storage Tank Room Manually Activated & on 861111,nitrogen Sys for 365-kV - 13.8-kV Standby Transformer Found Overpressurized | 12 November 1986 | PNO-IV-86-034:on 861031,foam Suppression Sys for Emergency Diesel Generator 13 Fuel Oil Storage Tank Room Manually Activated & on 861111,nitrogen Sys for 365-kV - 13.8-kV Standby Transformer Found Overpressurized |