MONTHYEARML20236N2571997-08-0707 August 1997 Forwards TIA-97-07,evaluation Re Reactor Trip & Engineered Safety Features Actuation Sys Instrumentation Setpoints for Plant,Units 1 & 2 Project stage: Other ML20199J2931997-09-16016 September 1997 Discusses Region II Request for NRR Position on Util Practice of Establishing Procedures for RTS & ESF Actuation Sys Instrument Setpoints to Be Nominal Values W/Tolerances Beyond TS Max & Min Allowed Values Project stage: Other ML20236N5341997-10-29029 October 1997 Forwards Task Interface Agreement (TIA-97-12) Evaluation of Monthly Surveillance Testing of Reactor Trip Bypass Breaker & ITS P-4 Interlock for Vogtle Units 1 & 2 in Response to 970505 Request from Region II Project stage: Other ML20236N5921997-12-22022 December 1997 Forwards Task Interface Agreement (TIA-97-12) Evaluation of TS Required Monthly & Refueling Interval Testing of P-4 Interlock for Vogtle Units 1 & 2 Project stage: Other 1997-12-22
[Table View] |
|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217F3351999-10-14014 October 1999 Notification of 991103-04 Southern Nuclear Operating Licensing Workshop in Birmingham,Alabama with Goal of Improving Licensing Interface Between Licensee & NRC ML20217M4281999-10-0808 October 1999 Requests That Attached Request for Addl Info Be Placed in Pdr.Informs That RAI Faxed to J Bailey on 991008 & Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC Staff & SNC Staff ML20207E2431999-05-11011 May 1999 Requests That Encl RAI Be Placed in Pdr.Rai Faxed on 990511 to J Bailey of Snoc to Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC & Snoc Staff ML20204B3651999-03-11011 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980721 ML20207L7111999-03-11011 March 1999 Informs That Attached Topics Faxed Today to J Bailey of Southern Nuclear Operating Co,Inc for Sole Purpose of Preparing Licensee Personnel for Upcoming Conference Call ML20204C4751999-03-11011 March 1999 Forwards Exam Repts 50-424/98-302 & 50-425/98-302 for Exams Administered on 980721 ML20207H9181999-02-0505 February 1999 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered on 980413-15 at Plant ML20207H9401999-02-0505 February 1999 Forwards Exam Repts 50-424/98-301 & 50-425/98-301 with as Given Written Exam for Tests Administered on 980413-15 IR 05000425/20010871998-09-22022 September 1998 Redirects Info Encl & Previously Considered as Proprietary, Per .W Ltr NSD-NRC-98-5757 Stated That Encl Rept Is No Longer Considered Proprietary.Encls Originally Submitted as Part of File Package 9504250187 ML20236N6301998-04-0101 April 1998 Submits Task Interface Agreement (TIA-97-12) Suppl Evaluation of TS Required Monthly & Refueling Interval Testing of P-4 Interlock for Vogtle Units 1 & 2 ML20198M9691998-01-13013 January 1998 Notification of 980128 Meeting W/Util in Rockville,Md to Discuss Plant TSs Re Reactor Trip Setpoints & Associated Application for License Amend, ML20236N5921997-12-22022 December 1997 Forwards Task Interface Agreement (TIA-97-12) Evaluation of TS Required Monthly & Refueling Interval Testing of P-4 Interlock for Vogtle Units 1 & 2 ML20199G7471997-11-19019 November 1997 Forwards Memo from Hn Berkow to Jr Johnson, Re Task Interface Agreement 97-07 on Instrument Setpoints,To Be Placed in PDR ML20236N5341997-10-29029 October 1997 Forwards Task Interface Agreement (TIA-97-12) Evaluation of Monthly Surveillance Testing of Reactor Trip Bypass Breaker & ITS P-4 Interlock for Vogtle Units 1 & 2 in Response to 970505 Request from Region II ML20199J2931997-09-16016 September 1997 Discusses Region II Request for NRR Position on Util Practice of Establishing Procedures for RTS & ESF Actuation Sys Instrument Setpoints to Be Nominal Values W/Tolerances Beyond TS Max & Min Allowed Values ML20211D8861997-09-16016 September 1997 Forwards SG Tube Insp Results.Results Were Faxed to J Bailey in Preparation for Conference Call ML20236N2571997-08-0707 August 1997 Forwards TIA-97-07,evaluation Re Reactor Trip & Engineered Safety Features Actuation Sys Instrumentation Setpoints for Plant,Units 1 & 2 ML20141E1781997-05-16016 May 1997 Notification of 970522 Meeting W/Util in Rockville,Md to Allow Licensee to Brief NRC Staff on Results of Analyses of Damage to Unit 1 SG That Was Caused by Parts of Failed Guide Tube Pin Assembly on or About 960529 ML20137R4421997-04-0707 April 1997 Requests That Audio Tapes Identified Be Returned in Order to Return to Region II Office.Licensing Proceeding Terminated & Staff Acted on 10CFR2.206 Petition Initially Filed ML20134P0721997-02-21021 February 1997 Notification of 970304-06 Meeting W/Gpc in Waynesboro,Ga to Review Selected Aspects of Licensee 960515 Submittal to NRC Requesting Approval of Amend to Physical Security & Contingency Plan ML20133G1711997-01-10010 January 1997 Notification of 970116 Meeting W/Util in Rockville,Md to Discuss Schedule for Licensee Submittal & Staff Review & Approval of Plans to Install Addl Fuel Racks in Plant Fuel Pools ML20135F5111996-11-29029 November 1996 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Decision of Board (LBP-96-16) Has Expired.Decision Became Final Agency Action on 961129. W/Certificate of Svc.Served on 961129 ML20205C2841995-09-15015 September 1995 Informs That Lou Will Not Be Able to Attend 950923 Meeting, Due to Attendance in Headquarters with Chairman Steering Committee.He Will Also Be Gone on 950924 to Work on Vogtle Case ML20128G2831995-03-10010 March 1995 Discusses Region II Review of Proposed Ack Ltr for Vogtle Civil Penalty (EA 93-304),informing That L Reyes,Deputy Regional Administrator,Concurred on Document on 950310 ML20128G2671995-03-0909 March 1995 Forwards Proposed Ack/Closeout Ltr After Receipt of Gpc Check for Listed Amount in Vogtle Edg/Inaccurate Info Enforcement Action.Requests Assistance W/Expedition of Region Comments & Concurrence Re Ack/Closeout on Vogtle ML20128F5261995-01-20020 January 1995 Partially Deleted Memo Notifying Commission of Results of Settlement Discussions Initiated by Counsel for Georgia Power Co & Staff Intent to Accept Licensee Proposal to Resolve Matter ML20128G2291994-12-20020 December 1994 Informs That Last Version of Memo to Commission on Proposed Resolution of Enforcement Action in Vogtle Included in Attached File.Hard Copy to Be Provided.W/O Encl ML20128Q0711994-11-15015 November 1994 Forwards Vogtle Coordinating Group Evaluation of Georgia Power Co Response to Notice of Violation & Demands for Info ML20128G1521994-10-28028 October 1994 Discusses Result of OI Analysis of Gpc Response to Enforcement Action Per Conclusions in OI Rept, Case 2-90-020R ML20128G1311994-08-16016 August 1994 Discusses 940816 Telcon W/E Blake Re Vogtle Licensing Proceeding.E Blake Expressed Concern Re Length of Time Projected for NRC Staff Review of Gpc Response to NOV & Proposed Imposition of Civil Penalty for Vogtle ML20128Q0461994-08-15015 August 1994 Responds to 940804 Memo & Informs That Plant Coordinating Group Being Reassembled to Expeditiously Review,Analyze & Formulate Position on Adequacy of Responses by Gpc ML20129F7351994-06-0909 June 1994 Recommends That Issue Concerning Failure to Take Appropriate Action for Calcon Switch Problems Identified Prior to 900320 Be Closed W/O Further Action ML20128F5421994-05-0909 May 1994 Informs That J Lieberman States That All Vogtle Officials Notified & Press Release Scheduled for 940510 Approved.Task Force Recommended to Commission That Gpc Should Be Cited for Unacceptable Inaccuracies in Reporting to NRC Only ML20128F4891994-05-0909 May 1994 Discusses Factors Involved Re Possible Press Misinterpretation of Scheduled Press Release Concerning Vogtle Enforcement Action Against Gpc ML20128F4751994-05-0606 May 1994 Requests That Gpc & Southern Nuclear Operating Co Be Notified Re Attached Vogtle Press Release for 940509 ML20128G4311994-03-31031 March 1994 Partially Deleted Memo Informing That DPR Has Reviewed Regional Enforcement Recommendation,Draft Commission Paper & Demands for Info Re Vogtle Electric Generating Plant ML20129H1911994-03-0808 March 1994 Partially Deleted Memo Informing That on 940223,first Draft of Proposed Enforcement Action for Georgia Power Co Submission of Inaccurate & Incomplete Info on Plant DG Problem,Distributed ML20129H1361994-02-23023 February 1994 Partially Deleted Memo Forwarding Proposed Enforcement Action for Georgia Power Co Submission of Inaccurate & Incomplete Info on Plant DG Problem,For Review,Evaluation & Comment ML20059L3601994-01-31031 January 1994 Notification of 940202 Meeting W/Util in Rockville,Md to Discuss Review of Various Requested Licensing Activities ML20058K7791993-12-0606 December 1993 Forwards Ltr as Result of 931117 order,LBP-93-22 & Informs That Staff Will Answer Questions Recently Filed by Util ML20129F7291993-11-0505 November 1993 Informs How IIT Supporting Documents on Plant Accessed in Nudocs ML20057E2991993-10-0404 October 1993 Forwards Safety Evaluation Accepting Proposed Emergency Action Level Changes in Rev 15 of Plant Emergency Plan ML20129H0341993-09-16016 September 1993 Forwards for Implementation,Charter for Preparation of Enforcement Proposal Associated W/Oi Investigation Case 2-90-020 Re Reporting DG Reliability.Nominated Individuals to Review Info Collected by OI Listed ML20129H0121993-09-10010 September 1993 Summarizes 930908 NRC Meeting in Rockville,Md Re Plans for Reviewing Findings of Ongoing OI Investigation Concerning 930320 EDG Failures.Meeting Attendees Listed ML20056F7981993-08-24024 August 1993 Notification of 930908-09 Meeting W/Util in Rockville,Md to Discuss Status of Current Licensing Issues & Safety Initiatives for Plants ML20129F6481993-08-14014 August 1993 Documents Series of Meetings at Which Concerns Re Issues of Mgt Integrity & Attitude at Plant Presented & Discussed ML20056C1531993-03-17017 March 1993 Transmits Corrected Page Nine of NRC Brief in Response to Licensee Appeal of Licensing Board Order Granting Petition to Intervene, in Matter of Gap Re License Amend Dtd 930316. Encl Corrects Signature Page ML20128G8161993-02-0909 February 1993 Forwards Corrected Certificate of Svc Re License Amend, Changing Date of Svc from 930203 to 930205 ML20127K3851993-01-0606 January 1993 Notification of Significant Meeting on 930114 W/Util at Region II Re Emergency Plan Changes to Incorporate NUMARC Emergency Action Levels ML20126F4161992-12-18018 December 1992 Notification of 930107 Meeting W/Util in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in Highhead Pressure Safety Injection Sys 1999-05-11
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217F3351999-10-14014 October 1999 Notification of 991103-04 Southern Nuclear Operating Licensing Workshop in Birmingham,Alabama with Goal of Improving Licensing Interface Between Licensee & NRC ML20217M4281999-10-0808 October 1999 Requests That Attached Request for Addl Info Be Placed in Pdr.Informs That RAI Faxed to J Bailey on 991008 & Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC Staff & SNC Staff ML20207E2431999-05-11011 May 1999 Requests That Encl RAI Be Placed in Pdr.Rai Faxed on 990511 to J Bailey of Snoc to Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC & Snoc Staff ML20207L7111999-03-11011 March 1999 Informs That Attached Topics Faxed Today to J Bailey of Southern Nuclear Operating Co,Inc for Sole Purpose of Preparing Licensee Personnel for Upcoming Conference Call ML20204C4751999-03-11011 March 1999 Forwards Exam Repts 50-424/98-302 & 50-425/98-302 for Exams Administered on 980721 ML20204B3651999-03-11011 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980721 ML20207H9181999-02-0505 February 1999 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered on 980413-15 at Plant ML20207H9401999-02-0505 February 1999 Forwards Exam Repts 50-424/98-301 & 50-425/98-301 with as Given Written Exam for Tests Administered on 980413-15 IR 05000425/20010871998-09-22022 September 1998 Redirects Info Encl & Previously Considered as Proprietary, Per .W Ltr NSD-NRC-98-5757 Stated That Encl Rept Is No Longer Considered Proprietary.Encls Originally Submitted as Part of File Package 9504250187 ML20236N6301998-04-0101 April 1998 Submits Task Interface Agreement (TIA-97-12) Suppl Evaluation of TS Required Monthly & Refueling Interval Testing of P-4 Interlock for Vogtle Units 1 & 2 ML20198M9691998-01-13013 January 1998 Notification of 980128 Meeting W/Util in Rockville,Md to Discuss Plant TSs Re Reactor Trip Setpoints & Associated Application for License Amend, ML20236N5921997-12-22022 December 1997 Forwards Task Interface Agreement (TIA-97-12) Evaluation of TS Required Monthly & Refueling Interval Testing of P-4 Interlock for Vogtle Units 1 & 2 ML20199G7471997-11-19019 November 1997 Forwards Memo from Hn Berkow to Jr Johnson, Re Task Interface Agreement 97-07 on Instrument Setpoints,To Be Placed in PDR ML20236N5341997-10-29029 October 1997 Forwards Task Interface Agreement (TIA-97-12) Evaluation of Monthly Surveillance Testing of Reactor Trip Bypass Breaker & ITS P-4 Interlock for Vogtle Units 1 & 2 in Response to 970505 Request from Region II ML20211D8861997-09-16016 September 1997 Forwards SG Tube Insp Results.Results Were Faxed to J Bailey in Preparation for Conference Call ML20199J2931997-09-16016 September 1997 Discusses Region II Request for NRR Position on Util Practice of Establishing Procedures for RTS & ESF Actuation Sys Instrument Setpoints to Be Nominal Values W/Tolerances Beyond TS Max & Min Allowed Values ML20236N2571997-08-0707 August 1997 Forwards TIA-97-07,evaluation Re Reactor Trip & Engineered Safety Features Actuation Sys Instrumentation Setpoints for Plant,Units 1 & 2 ML20141E1781997-05-16016 May 1997 Notification of 970522 Meeting W/Util in Rockville,Md to Allow Licensee to Brief NRC Staff on Results of Analyses of Damage to Unit 1 SG That Was Caused by Parts of Failed Guide Tube Pin Assembly on or About 960529 ML20137R4421997-04-0707 April 1997 Requests That Audio Tapes Identified Be Returned in Order to Return to Region II Office.Licensing Proceeding Terminated & Staff Acted on 10CFR2.206 Petition Initially Filed ML20134P0721997-02-21021 February 1997 Notification of 970304-06 Meeting W/Gpc in Waynesboro,Ga to Review Selected Aspects of Licensee 960515 Submittal to NRC Requesting Approval of Amend to Physical Security & Contingency Plan ML20133G1711997-01-10010 January 1997 Notification of 970116 Meeting W/Util in Rockville,Md to Discuss Schedule for Licensee Submittal & Staff Review & Approval of Plans to Install Addl Fuel Racks in Plant Fuel Pools ML20135F5111996-11-29029 November 1996 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Decision of Board (LBP-96-16) Has Expired.Decision Became Final Agency Action on 961129. W/Certificate of Svc.Served on 961129 ML20134B7891996-06-25025 June 1996 Board Notification 96-005:discussing Issues Which Involve Challenge Whether Southern Nuclear Operating Co,Inc Possesses Requisite Character,Competence & Integrity & Willingness to Abide by Regulatory Requirements ML20134B7501996-06-0505 June 1996 Board Notification 96-003:discussing Secretary of Labor Decision & Remand Order Which Found That Gap Managers Discriminated Against One of Their Employees,M Hobby ML20134B6771995-11-13013 November 1995 Board Notification 95-017:notifies of Contention Challenging Application of Gpc for Amends to Authorize Southern Nuclear to Operate Plant ML20205C2841995-09-15015 September 1995 Informs That Lou Will Not Be Able to Attend 950923 Meeting, Due to Attendance in Headquarters with Chairman Steering Committee.He Will Also Be Gone on 950924 to Work on Vogtle Case ML20128G2831995-03-10010 March 1995 Discusses Region II Review of Proposed Ack Ltr for Vogtle Civil Penalty (EA 93-304),informing That L Reyes,Deputy Regional Administrator,Concurred on Document on 950310 ML20128G2671995-03-0909 March 1995 Forwards Proposed Ack/Closeout Ltr After Receipt of Gpc Check for Listed Amount in Vogtle Edg/Inaccurate Info Enforcement Action.Requests Assistance W/Expedition of Region Comments & Concurrence Re Ack/Closeout on Vogtle ML20128F5261995-01-20020 January 1995 Partially Deleted Memo Notifying Commission of Results of Settlement Discussions Initiated by Counsel for Georgia Power Co & Staff Intent to Accept Licensee Proposal to Resolve Matter ML20128G2291994-12-20020 December 1994 Informs That Last Version of Memo to Commission on Proposed Resolution of Enforcement Action in Vogtle Included in Attached File.Hard Copy to Be Provided.W/O Encl ML20128Q0711994-11-15015 November 1994 Forwards Vogtle Coordinating Group Evaluation of Georgia Power Co Response to Notice of Violation & Demands for Info ML20128G1521994-10-28028 October 1994 Discusses Result of OI Analysis of Gpc Response to Enforcement Action Per Conclusions in OI Rept, Case 2-90-020R ML20128G1311994-08-16016 August 1994 Discusses 940816 Telcon W/E Blake Re Vogtle Licensing Proceeding.E Blake Expressed Concern Re Length of Time Projected for NRC Staff Review of Gpc Response to NOV & Proposed Imposition of Civil Penalty for Vogtle ML20128Q0461994-08-15015 August 1994 Responds to 940804 Memo & Informs That Plant Coordinating Group Being Reassembled to Expeditiously Review,Analyze & Formulate Position on Adequacy of Responses by Gpc ML20129F7351994-06-0909 June 1994 Recommends That Issue Concerning Failure to Take Appropriate Action for Calcon Switch Problems Identified Prior to 900320 Be Closed W/O Further Action ML20128F5421994-05-0909 May 1994 Informs That J Lieberman States That All Vogtle Officials Notified & Press Release Scheduled for 940510 Approved.Task Force Recommended to Commission That Gpc Should Be Cited for Unacceptable Inaccuracies in Reporting to NRC Only ML20128F4891994-05-0909 May 1994 Discusses Factors Involved Re Possible Press Misinterpretation of Scheduled Press Release Concerning Vogtle Enforcement Action Against Gpc ML20128F4751994-05-0606 May 1994 Requests That Gpc & Southern Nuclear Operating Co Be Notified Re Attached Vogtle Press Release for 940509 ML20128G4311994-03-31031 March 1994 Partially Deleted Memo Informing That DPR Has Reviewed Regional Enforcement Recommendation,Draft Commission Paper & Demands for Info Re Vogtle Electric Generating Plant ML20129H1911994-03-0808 March 1994 Partially Deleted Memo Informing That on 940223,first Draft of Proposed Enforcement Action for Georgia Power Co Submission of Inaccurate & Incomplete Info on Plant DG Problem,Distributed ML20129H1361994-02-23023 February 1994 Partially Deleted Memo Forwarding Proposed Enforcement Action for Georgia Power Co Submission of Inaccurate & Incomplete Info on Plant DG Problem,For Review,Evaluation & Comment ML20059L3601994-01-31031 January 1994 Notification of 940202 Meeting W/Util in Rockville,Md to Discuss Review of Various Requested Licensing Activities ML20058K7791993-12-0606 December 1993 Forwards Ltr as Result of 931117 order,LBP-93-22 & Informs That Staff Will Answer Questions Recently Filed by Util ML20059M9191993-11-19019 November 1993 Board Notification 93-023:forwards Region II Allegation Review Summary Rept Re Alleger Concern on Plant Diesel Generators ML20129F7291993-11-0505 November 1993 Informs How IIT Supporting Documents on Plant Accessed in Nudocs ML20057E2991993-10-0404 October 1993 Forwards Safety Evaluation Accepting Proposed Emergency Action Level Changes in Rev 15 of Plant Emergency Plan ML20129H0341993-09-16016 September 1993 Forwards for Implementation,Charter for Preparation of Enforcement Proposal Associated W/Oi Investigation Case 2-90-020 Re Reporting DG Reliability.Nominated Individuals to Review Info Collected by OI Listed ML20129H0121993-09-10010 September 1993 Summarizes 930908 NRC Meeting in Rockville,Md Re Plans for Reviewing Findings of Ongoing OI Investigation Concerning 930320 EDG Failures.Meeting Attendees Listed ML20056F7981993-08-24024 August 1993 Notification of 930908-09 Meeting W/Util in Rockville,Md to Discuss Status of Current Licensing Issues & Safety Initiatives for Plants ML20129F6481993-08-14014 August 1993 Documents Series of Meetings at Which Concerns Re Issues of Mgt Integrity & Attitude at Plant Presented & Discussed 1999-05-11
[Table view] |
Text
, . -
(/ . . 1
, 1 '.$ 12 , 4 . f h t 5 -
g NUCLEAR RECULATORY ION 'l ~ # ~
3 woe-.mee o. - t, - % l December' 22, 1997 4 t, . v.a.
MEMORANDUM TO: adessBudohnsonoDkedoor 88NWE' l PROM: Hertiert N. Dettour, Director , !
Project DrectorateIb2 / "
DMeion of RoederPrefects WI 05cs of NucteerReacter Reg (deti 'I I SUSJECT: TASK INTERFACE AGREEMENT (TW g7-12) EVALUATION OF
- TECHNICAL SPECIFICATION REQUIRED MONTHLY AND l REFUELING INTERVAL TESTING OF P4 INTERLOCK FOR !
VOGTLE UNf731 AND 2 (TAC NOS. M98528 AND MOS$29) l Your memorandum dated May 5,1997, identilles a potental concem with the mothed used try l the Econoes to test the P4 interlock at Voglie Unge 1 and 2. Specmoelly, e portion of this interiock associated with the reactor trip bypees brestore le not being tested. The Vogue reaktert inspector provided edeilonelirdermeson regensne the P 4 insertook tesens precedure.
The etsff docussed this ' rWormation, contained in circuit disgrams of the loansee's test l preesdures, in e Naomber 18,1937, telesen ettended by the kanees the resident inspector, l end the project manager. Our sonalusione regarding the Bosness's P4 interlock assens are se tetews:
i
' 1. Vogtie Technical Spec #ication (TS) Survolliance Requirement (SR) 3.3.1.4 requirse
{
monthly operstdllty verEcotion of reestor trip trasher (RTS) and bypese brusher suidhery l end coR switch cardede, used me P4 interlock, to provkle inibeton elgnel to Solid State Protection System (SSPS) and Electro HydrouEc Control (EHC) system. The licensee's mornhir toot, however, vermee operstmy of onty half er es toisi numter of conteste used h P4 Interlock M violanon of the TB.
1
- 2. voede Technice! Spaceconon SR 3.3.2.s regures an 1s month TADOT (interlook siens! ;
vereceten) of the P4 interlock for both the SSPS and the EHC syrtems. The llenness's )
test, however, vertflee the P4 signol to SSP 8 only. The pient design hee,an instated test '
airadt to test the P4 signet for only the SSPS. The P4 'aignet to the EHC"fyotem is not 4 bein0 tested, which is e violation of the M.
g 1hs atteshed evolustion completos sur effort in response to your TM. t$
3 Dochet Nee. 50424 and 50425 @
Ansehment: Tm 87-12 Evoluellon FAX TR A,NSMITTAL_ eve ==e L. i ;
oc evett: C. Hohl, RI
'; $ " E 'T3 rI wry' %-p590 Emmen mma e
9807150188 980624 f.?
PDR FOIA y UNNERST98-155 PDR
- ~
,. TASK INTERFACF AQREEMENT fTIA.e712) EVALUATION l
BY THE OFFICE OF NUCLEAR REACTOR REGIAATION.
VDQTLE UNITS 3 AND1 DOCKET NOS. 80424 AND 80425
'1.0 INTRODUqT]ON By memorendum dated May 5,1997 Region 11 requested NRR's technleet sealstence to evolusts the Vogtis resident inspector's conesmo regenang monthly toedng of the Vogtle Reedor Trip System (RTS) bypsee circuit tonalere and lie N inlertook. The memorendum specsficeny requested the sesfr to address the fWowmo two conmems:
1, to the licensee's process or ordy emoting the sum shunt trip foeture or the reecaer trip trypese broeiere prior to piecing them in servios, noneistent wth the Trip Assuotion Devios operational Test (TADoi) requirement of the plant Technhwl Spanuicaticm l (TS) Surveillance Requirement (BR) 3.3.1.47
- 2. le the lleensee% praction of not toedng the P4 signal generated by the trypese tweaker and supplied to the turtine Electrp+fydraulic Contml (EHC) system canalstent wth the TADOT requirement of TS BR 3.3.2.97 2.0 EVALVATION The etsff evolunden of the Voglie boensee's practice of testing the bypers broders and lie N interiocks won based on the design foetures of the roedor trip broeiere (NT9e), reactor trip bypees treekere end their P 4 interloche, and the plart TS requirements.
In addition, the Vogtle resident inspector provided additionslinformation regen $ne the P 4 i interlock testing procedure et the Vogtle Unite 1 and 2. The staff discuened this Information -
! contained in circuit disgreme af the iloonese's test precedures in e November 18,1987, teincon l l stended try the Boonees, the reeldent inspostor, and the proJoct manager.
- 1. RandarYng Svnsen armakerTest In Westinghouse plant designs, e trypese broeier le provided in perelief with each of the two RTBe, only to facibtste et power testing of the RTBe. Westin0 house Topical Report WCAP 7872, " Solid State (.egic Protection System Description,' indicated that when en RTS is bypossed for test, the sesociated 89 tid otsie pnytechon system (SSPS) train is eenesclerod inoperable.
The RTBe end the trypees brookere are provided with en undervoltage and a shunt trip testure. The SSPS providse e signal for automatic trip (deenergine) of the undervoltage coll. Nowever, operating the mein control board menuel switch almutteneously actuates the diverse foeture (undervoltage evid shunt trip) of the reactor trip tweelers. In addition as these features, the trypese breeter een slao be tripped try a local manuel swllch. i ATTACHMENT 9
2-This local shunt trip flecture le provided to facihtete at power verification d the bypees breeler trip espebBty, which is pleoed in oorvios only during the mentNy TADOT Wthe nosociated RTB.
The Vogtle plartt TS defines TADOT as operating the trip ectuating devios and vertfyin8 the operability of required eierm, interlock, and trip funcione. TADOT of en RTB is required on a 31. day staggered test basis and TADOT for the associated bypese trosher is required prior to placing it in servlos. The plant 78 also limite plent operation to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> when a trypses broeler le ancke64n for testing the assocuted RTB. The T5 Bones for
- f. ;;r TADOT of the bypses brealer indkstos that the bypees tweekers are tested only fbr the shunt trip by operedng the local manuel switch boosues the design does not have the capability for esperate and independent verificabon of both shunt and undervotste trip functione et power. For the bypass treakere, an independent verification W the shunt and undervoltage trip functions opersbelty le performed on on iknonth survomenos test intervel TADOT during the scheduled shutdown of the power plant. As defined, TADOT requires operating the trip ectuohng devlas (RTB ond bypese tweaker) whhout specifying the means to trip thans treekere. Additionally, #m sesoaisted SSPS train le conaldered inoporelde during an RTB morthly test, whkh etwistes tusene the operability of the undervoltage trip func6en inibsted by en inoperable SSPS train.
The etsff review of the Vogue plant design foetures and TS surveillance respanemonte found the licensee's monthly TADOT of the reactor trip bypass tweelere to be se,sistent
' wkh T8 SR 3.3.1.4. However, the monthly operebfilty of RTB and trypese trooker susillery and cell switch contacte providing P 4 Interlock signal to SSPS and EHC systems are not fully verffied. The Boonese4 monthly test vertfies operabtitty of only half of the total numter of cornects used in P d ledertook in violation of the Ts.
- 2. T. ::,a P= Trio a.=- ;i. % P.d E:=f te TuO MC * ~ -
P 4 la en Engineered Safety Feature Actuston System (ESFAB) interlock onshied when !
! en RTB and its associated trypees treeter is open. Normally closed contacts of the coR owltch (treaker rock-infoul position switch) and thet of the auxilary owltch (treaker open/ class owltch) provide the P 4 eignal to trip the mein turtrino end initiate other E8FAS functions. The Voglie design includes two separate P-4 irWtisting ciraute; one providing trip signal to the turbine ENC system anti the other providing a trip signal to the SSPS for l
initiating other ESFAS funceana. Each circuit le e parallel combination of one closed l contact of the RTB esti owitch and one closed contact of the R1D audiary owheh in series with a simEar contact combination of the sesociated bypees treekst. As such,the P4 signol le only generated when either the nell or the audiary switch contacts of both the RT5 and the sesociated trypees breaker are cloeod. It le. therefore, not poselbie to esperately test the P4 eignal contribution by the RTE and the associated bypese breakers.
., 3 ;
Vogue Technical Speemaeuen SR 3.3.3.8 requirse en 18 month TADOT (iresNock elgnol verMconon) of the N ireerteck for both the 88PS and the EHC systems. The lioenese's test, however, vermee the N signal to SSPS ordy The piant design has en insteBod test ,
circuit to toot the N elgriet for only the sSPs. The N signal to the EHC system le not i teing tootod,in vlotonen of the TB. ;
. 1
. 3.o C O N C W RIO N Sesed on as review of the irdbrmetion provided in the TIA and the Novemter it 1997, telecon !
with the teensee, the stoR concludes met the Vogtle liaenese's testing of ordy the shunt trip !
lesture of the reactor Mp typese tweakers le consistent with the TS requiremers of SR 3.3.1.4 !
- wh5e not verWying the status of et ooraeste h P4 interteck to inconsistent with me TS survomanes requirement. in addhion, the stoff has concluded met twt teoung #w N interlock signal se the EHC system is insensistent whh the TADOT requirement of TS BR 3.3.2.0.
l l
l l '
l Tomt. p.14
.