Responds to from Consolidated Edison Requesting Interpretation of TS as to Definition of Operable as It Applies to Afs Under Certain Scenarios
ML20236N066
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 05/02/1997
From: Charemagne Grimes
NRC (Affiliation Not Assigned)
To: Harold J
NRC (Affiliation Not Assigned)
Shared Package
ML20236J990 List: ... further results
References
FOIA-98-155 NUDOCS 9807140383
Download: ML20236N066 (3)


Text

. . . . . . . . . . .

..,- WurTED STATS 4 -

soucmut maout.ATosty coesassse#oes J -

_ e. -

J

..... ~,,.,,,,

amnaamrm 10
Jef frey F. Harold, Project Romager i Project Strectorate I I Stelsten of Asacter Prefects 1/11 IIst: Christopher 1. Grises Chief fT Tochalcal Specifications tranch 6 Aasectate Strector for Projects. MR SuSJECT: futst2L V1. Alf10mTIC OPtAAT10s AS IT RfLATE5 TO AUIILIARY f[ttastTL2 GPtaAs!LITT Af las!As Polari las!T 2 TW ischalcal Specificattaas Branch (154) has revleued Consolidated (dissa's roguest for as laterprwtatten of the techalcal s p lficaties as to the deflattles of OrtAA8t! as it applies to the austilary feedseter (AfW) systes ender certals Monaries, sateltted la a letter dated February 13, 1997. The geestion raised aas; does one declare the AfW systese laeperable eAea the operator places AfW control la mensal to control sisas generater level (s)?
  • ust laspeciles Reneal Part 9900: Techalcal Geldance, OP( AASt[/0P(AA81Lif f:

tesertag the fonctiemal Capellity of a Systen er Componest* specifically addresses this conditles la lecties 6.7 *lise of slaaval Actica la Place of Artematic Actlee.' la peperal, it is set appropriate to talt2 credit for manaal actles la place of asts,matic acties for protecties of safety llalts to consider egulpasst operable. This does act preclude operator actlen to put the plant la a safe condities, but operater acties camaet be a substitute for setonatic safety limit protectles. Momever, the licenstag of specific plant er systen destgas lacindes ceasiderstles of automatic and aanval actlen.

thtle approvals have been granted for either er both type actlens, not every centtaatles of circumstances has been reviamed free an operability standpoint.

Although it is possible, it is met espected that many deterslaations of operability will be soccessful for aanval actien la place of Automatic action.

Credit for sammal isttlaties to altigate the consequences of design basis accidents should have been established as part of the licensing review of a plant.

For any other sitsattes la thlch substitutes of~ aanval actica for automatic acties may be acceptable, the licensee's deterslaation of operability with regard to the ese of mensal actica aust focus en the physical differences between artenatic and mensal actica and the ability of the nemal actlen to accomplish the specified functlen. The physical differences to be considered laclude, but met insited te, the ability to recoyatze lapwt stenals for acties, read access to or recopettles of setpelats, destys r,sances that may camp 11cate se6seguest mensal operatien such as aste-reset, repe:1tiening en temperature er pressere, tislag rogstred for automatic actlen, etc., etnisaan aanslag regstrements, and emergency operatten procedures written for the autenatic mode of operatten, t .-

y, ,9 NRCfH W # ' ' ' l 9807140383 980624 """

PDR FOIA UNNERST98-155 PDR

J. marold May 2. 1997 with regards to the MV system, the staff has already made a deterutnation based en the above discussten and the typical PWR MW system design of when manoel m s estematic operettaa is permissible. The staff recognizes that this systen W be used evelag startsp of the plant, normal shutdown, and hot standby canditless and that it is controlled and operated during these conditions la the mensal ende of operaties. la such situations, the MW system is cesaldered OP(AA8LE with regards to the LC0 and the T5 mefinition of OP(RAall/0P14A81 LIT).

Canselldated EdIsea is propes1mg a generic champ to the 5T5 (NUREG-1431) basad en this 15 taterpretatten. This change wu11 be submitted through the approved ladestry 515 chaeum process. Open receipt of the approved industry 15 change roguest. 154 wil' restos the p g sed change.

t cc: 5. Bajus

5. Varga
5. Wunder

e J. Harold May 2, 1997 With regards to the AFW system, the staff has already made a deterutnation based on the above discussion and the typical PWR AFW systes design of when aanval versus automatte operattsn is permissible. The staff recognizes that this system may be used during startup of the plant, normal shutdown, and hot standby conditions and that it is controlled and operated during these conditions in the manual mode of speration. In such situations, the AFW system is considered OPEAA8LE with regards to the LCO and the TS definition of OPERA 8LE/0PERA81LITY.

Consolidated Edison is proposing a generic change to the STS (NUREG-1431) based on this TS interpretation. This change will be subeltted through the approved industry STS chan9e process. Upon receipt of the approved industry TS change request TSB will review the proposed change.

cc: S. Eajwa S. Varga G. Wunder DISTRIBUTION:

FILE CENTER TS8 R/F '

CIGrimes JGluehman RJGlardina DOCLNENT NAME: G:\RJC\llo.PT *See previous concurrence 0FFICE TS8/ADPR TS8/ADPR /.'- C:TSB/ADPR Rama RJGlardina* JGluehman CIGrimes [ [ A wi Date 4/29/97 I/ /97 6 / L /97 0FFICIAL RECORD COPY 4 FIO 7lifo$ 5