Discusses Staff Review of Issue Re Purge Blower Surveillance at Plant So That Violation Issued by Region II & Denied by Licensee Could Be Resolved
ML20236K963
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 12/29/1993
From: Lainas G
Office of Nuclear Reactor Regulation
To: Merschoff E
Office of Nuclear Reactor Regulation
Shared Package
ML20236J990 List: ... further results
References
FOIA-98-155 NUDOCS 9807100158
Download: ML20236K963 (2)


Text

.

?

n UNITED STATES I 5 '

NUCLEAR REGULATORY COMMISSION

  • \ *****

wasmworow, n.c. sones.eca December 29, 1993 Docket Nos. 50-338 and 50-33g MEMORANDUM FOR: Ellis W. Merschoff, Director Division of Reactor Projects FROM: Gus C. Lainas, Assistant Director for Region II Reactors Office of Nuclear Reactor Regulation

SUBJECT:

TASK INTERFACE AGREEMENT (TIA) - NORTH ANNA FACILITY -

FAILURE TO TEST CONTAINMENT PURGE BLOWERS (TIA g3-015)

In the subject TIA you requested that we review an issue concerning purtle blower surveillance at North Anna so that a violation issued by Region .I and denied by the licensee,could be resolved. We have completed our review and consider that the licehsee was in violation of the Technical Specifications (TS). However, the licensee may be able to justify changing the TS.

You requested that we determine the following: .

Are the purge blowers in TS 4.6.4.2.a required to be surveillance-tested separately from the hydrogen recombiners?

I We have concluded that, as you had previously determined. North Anna TS 4.6.4.2.a does require that the purge blowers be surveillance-tested separately from the hydrogen recombiners. The TS in question clearly states "and each purge blower operates for 15 minutes."

l You also requested that we determine the following:

1

, Does the TS need to be clarified? If so, please provide the required clarification.

l From a compliance view, the TS does not need to be clarified as long as the licensee is performing the surveillance as specified in TS 4.6.4.2.a as you have interpreted. However, the licensee may be able to justify a change to the TS to delete the portion of the surveillance in question. In addition, they may be able to justify a change to the TS that would allow operation with two hydrogen recombiners inoperable as stated in the Westinghouse Standard l

p98 71 g 8 980624

,7/

UNNERST98-1SS PDR 40//Vul)] -

//6z2

[

)

Ellis W. Merschoff .

Technical Specifications (STS). Their existing TS appear to be more limiting than the STS; however, it is up to the licensee to propose and justify any changes to their TS. l (Original Signed By)

Gus C. Lainas, Assistant Director for Region II Reactors Division of Reactor Projects - I/II cc: C. Hehl, RI E. Greenman, RIII W. Beach, RIV S. Richards, RV J. Lieberman M. Schwartz, OGC C. Marco, OGC Distribution Docket File PDII-2 RF SVarga JRoe BGrimes JWiggins AThadani CRossi BBoger FCongel DCrutchfield HBerkow ETana HSilver RCroteau MSinkule, RII s OTSB Background Book

  • See previour *oncurrence orria LA:PDII-2 PE:PDII-2 PM:PDII-2 SCSB OTSB m ETana 6fr RC M LEMA RBarrett* CGrimes*

M 12/22/93 12/2 4 93 12/ M /93 12/16/93 12/20/93

' 0FFIN D:PDII- 2 AD(hBPE M HBe'rN GLbs M 12/28//93 12/f/93 0FFICIAL RECORD COPY - DOCUMENT NAME: G:\NOANNA\TIA