Forwards Task Interface Agreement Evaluation in Response to 960405 Request That NRR Provide Evaluation of Millstone,Unit 2 Licensee Position on How Instrument Uncertainties Should Be Accommodated
ML20236L955
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/22/1996
From: Mckee P
NRC (Affiliation Not Assigned)
To: Cooper R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20236J990 List: ... further results
References
FOIA-98-155, RTR-REGGD-01.105, RTR-REGGD-1.105 TAC-M95177, NUDOCS 9807130240
Download: ML20236L955 (6)


Text

_ _ _ _ _ . _ - - -

i 4

. July 22,1996 4

MtnuxAhuun su: nicnard W. Cooper, II, Director Division of Reactor Projects Region I FROM: Phillip F. McKee, Director (Original Signed By)

Northeast Utilities Project Directorate Division of Reactor Projects - I/II

SUBJECT:

TASK INTERFACE AGREEMENT EVALUATION REGARDING INSTRUMENT ACCURACY AFFECTING MILLSTONE UNIT 2 (TAC NO. M95177) h :=r:dr h'.d f.;ril 5,1996, you requested that NRR provide an evaluation of the Millstone Nuclear Power Station, Unit 2, licensee's position on how instrument uncertainties should be accommodated for those instruments (except for RPS and ESFAS) that are used to judge compliance to M111 stone's Technical Specifications (TSs). The particular instance identified involved the measurement of ultimate heat sink (VHS) temperature.

The Instrumentation and Controls Branch (HICB) staff has reviewed the licensees interpretation of the applicability of instrument uncertainties against its TSs and the guidelines of Regulatory Guide (RG) 1.105,

" Instrument Setpoints for Safety Related Systems," Revision 2, dated 1986.

Thc HICC ovaluation is attached.

The HICB staff notes that instrumentation, other than RPS and ESFAS, are not explicitly reoutred by RG 1.105. The instrumentation used to measure the VHS temperature and other similar variables provide operability determination criteria and/or determination that a design limit is met. The instrumentation uncertainty can be accounted for in the plant safety analyris, the TS limiting value, the measured value, survelliance testing, or the emergency procedures.

Using RG 1.105 to address instrumentation uncertainties for these instruments in addition to the RPS and ESFAS instruments would be acceptable; however, as crev N niv n-toi h nnt required. Other means or methodologies, such as using the guidance provided in the Combustion Engineering's topical report referenced by the licensee, may be utilized. Thus, the licensee's approach to address the instrument uncertainties over the next year as part of its conversion to the Improved Standard TSs is an acceptable approach.

This completes our effort in response to your request.

Docket No. 50-336 Distribution Docket File PMcKee AChaffee

Attachment:

As stated PDI-3 Plant LBerry JDurr, RI SVarga DMcDonald JZwolinski CDoutt _.

DOCUMENT NAM

  • SEE PREVIOUS CONCURRENCE a
v. ..w..... .e .E: G:\.MCD,ONALO\.M95177.TI

. *. . in . w: c . c.,,A m .n.ce a.au.ne r c ,-c.,nA 4ne.new.

n .w ,

!0FFICE LA:NUPD ( hQ PM:NUPD M NRR:HICB l D:l#JM i l l NAME LBerry An' '

DMcDonald%d) "~

JWermiel* PM#Khe DATE 07/d/96 07/fl/96 07/15/96 07 M f96 0FFICTAL RECORD COPY 9807130240 980624 /

PDR FDIA g 7 UNNERST98-155 PDR

i .

. .r%.

7t

[b I

y E

E NUCLEAR REGULATORY COMMISSION UNITED STATES waswiuoiow, o.c. sones.caos

+, ,- July 22, 1996 l ,,,

MEMORANDUM T0: Richard W. Cooper, !!, Director Division of Reactor Projects Region I FRN: phillip F. McKee, Director Northeast Utilities Project Dire r Division of Reactor Projects - I I

SUBJECT:

TASK INTERFACE AGREEMENT EVALUATION REGARDING INSTRUMENT ACCURACY AFFECTING MILLSTONE UNIT 2 (TAC NO. M95177)

By memorandum dated April 5,1996, you requested that NRR provide an evaluation of the Millstone Nuclear Power Station, Unit 2, licensee's position on how instrument uncertainties should be accommodated for those instruments (except for RPS and ESFAS) that are used to judge compliance to Millstone's Technical Specifications (TSs). The particular instance identified involved the measurement of ultimate heat sink (VHS) temperature.

The Instrumentation and Controls Branch (HICB) staff has reviewed the licensees interpretation of the applicability of instrument uncertainties

against its TSs and the guidelines of Regulatory Guide (RG) 1.105,

" Instrument Setpoints for Safety Related Systems," Revision 2, dated 1986.

The HICB evaluation is attached.

The HICB staff notes that instrumentation, other than RPS and ESFAS, are not evriirit iv requirea by RG 1.105. The instrumentation used to measure the UHS temperature and other similar variables provide operability determination criteria and/or determination that a design limit is met. The instrumentation uncertainty can be accounted for in the plant safety analysis, the TS limiting value, the measured value, surveillance testing, or the emergency procedures.

Using RG 1.105 to address instrumentation uncertainties for these instruments in addition to the RPS and ESFAS instruments would be acceptable; however, as previously noted, is not required. Other means or methodologies, such as using the guidance provided in the Combustion Engineering's topical report referenced by the licensee, may be utilized. Thus, the licensee's approach to address the instrument uncertainties over the next year as part of its

! conversion to the Improved Standard TSs is an acceptable approach.

l This completes our effort in response to your request.

l Docket No. 50-336

Attachment:

As stated

Contact:

Cliff Doutt, HICB 415-2847 l

i TASK INTERFACE AGREEMENT EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION MILLSTONE, UNIT NO. 2 DOCKET NO. 50-336 The Instrumentation and Controls Branch staff has reviewed the Millstone Unit 2 licensee's position on application of instrument uncertainties to technical specifications as requested in the April 5,1996, memorandum from R. Cooper, Region I, to S. Varga, NRR, and noted the following points:

1. The licensee states that a requirement only exists to consider instrumentation uncertainties for the reactor protection system (RPS) and engineered safety feature actuation system (ESFAS) and selected technical specification (TS) Limiting Conditions of Operation (LCOs).

RG 1.105 addresses the application of instrument uncertainties to protective system instrumentation and states that the RG does not address LCOs.

2. Historically. instrumentation uncertainties have not been explicitly required for LCOs.
3. Millstone Unit 2 instrumentation uncertainties have been explicitly considered for RPS and ESFAS setpoints and for some TS LCOs. The licensee considers this consistent with the licensing basis of the plant.
4. Consideration of instrument uncertainties in all LCOs, like ultimate heat sink temperature was never explicitly required nor applied.
5. The licensee notes that the industry has been inconsistent in the application of instrument uncertainties to non-RPS/ESFAS parameters.
6. The licensee states, however, that they intend to address the reliance on certain instrumentation in the emergency operating procedures in the l

coming year, and suggests that a review of LCOs for the inclusion of I l

instrument uncertainties for these instruments is recommended.

The applicability of applying instrument uncertainties to plant safety systems has its basis in 10 CFR 50.36 TS in that 10 CFR 50.36 Part (c) requires that l TS include items in the following categories; safety limits, limiting safety system settings (LSSS), and limiting control settings. Safety limits are l

limits on important process variables that are necessary to reasonably protect the integrity of certain of the physical barriers that guard against the i uncontrolled release of radioactivity. LSSS are settings for automatic '

protective devices related to those variables having significant safety functions. These settings are chosen such that automatic operation will correct the abnormal situation before a safety limit is exceeded. Limiting control settings or LCOs on the other hand do not have a LSSS assigned to them per 10 CFR 50.36. This is based, in part, on the LCO being attributed to functional requirements. However, RPS setpoints outside the allowable value require entry into the RPS LCO.

l 4

The standard TS lists the RPS safety limits in Section 2.1 and the associated l LSSS (trip setpoint and allowable value) in Section 2.2. The improved standard TS (NUREG-1432) lists the safety limits in Section 2.1. with only the associated safety limit violations listed in Section 2.2. The LSSS (trip setpoint and allowable values) are no longer referenced in Section 2.2 of the l TS. The result is that the LSSS is now essentially defined in the TS bases per the setooint methodology (one column or two column format-allowable value and trip :;ctpir.t or allowable value only). Secondly, since the LSSS is specified for a variable on which a safety limit has been placed, an LSSS is i only defined and developed with respect to the RPS. A safety limit and an '

LSSS are not defined for LCOs per 10 CFR 50.36 and subsequently the TS. 1 ISA Std. 567.04-1982, "Setpoints for Nuclear Safety Rehted Instrumentation Used in Nuclear Power Plants," as endorsed by Regulatory Guide (RG) 1.105, i

" Instrument Setpoints for Safety Related Systems," provides a means to l establish an LSSS in terms of an allowable value/ trip setpoint and satisfy the LSSS requirement in 10 CFR 50.36. The purpose and scope of ISA 67.04 1982 aopears inconsistent in that the purpose stated in the standard indicates that l it was developed to provide a basis for establishing setpoints for protection '

systems, while the scope of the standard states that it provides minimum ,

requirements so that setpoints are established and held within specified limits in nuclear safety-related instruments.

However, design limits may exist for a system or LCO and be included in the TS. Design limits for ESFAS are traditionally treated as safety limits and as a result an allowable value and a trip setpoint have been developed for these variables and included in the plant TS. Although the 1982 ISA Std. does not provide a discussion on design limits, ISA 67.04-1994, Section 4.1 states that design limits for ESFAS are treated as safety limits in the standard.

i b, a .W i....; % nates that the RPS emergency core cooling, containment l isolation, and containment heat removal systems would require a stringent setpoint methodology based on the requirements of the standard.

The 1994 version of ISA S67.04 states in the scope that the standard is applicable to safety related setpoints as defined in Section 3. Section 4

" Establishment of Setpoints," in the 1994 standard includes those safety related setpoints that may not be credited in the safety analysis, or do not have limiting values. The caveat presented for these setpoints is that the setpoint metkdology and associated rigor of the calculation can be less than that requireo for RPS setpoints. The process of " grading" an instrument setpoint calculation based on a defined classification approach has been accepted on a limited basis by the staff. The process of setpoint grading is generally accepted within the industry and a set of draft standardized setpoint grading methodologies has been developed in association with ISA 567.04. The staff is currently in the process of updating RG 1.105 and is evaluating the endorsement of setpoint grading in the regulatory guide, l

i l

r

f 5 .

l e

The staff notes that 10 CFR Part 50, Appendix A, Criterion 13. Instrumentation and Control, provides requirements to monitor variables and that appropriate controls he applied. Part 50 of Appendix B, Part XI of Title 10 of the sede of Federal Regulations, Test Control states that a test program be established and test procedures incorporate the requirements and acceptance limits contained in applicable design documents. Also, 10 CFR of Part 50, Appendix B, Part X11, control of Measurement and Test equipment, requires that

.c:.;;;c.; ta c,t;.51hhed to maintain measurement and test equipment accuracy within necessary limits.

Regulatory Guide 1.27 " Ultimate Heat Sink for Nuclear Power Plants,"

Revision E, January 1976 (for comment) states that the ultimate heat sink (UHS) performs two principal safety functions: (1) dissipation of residual hest after reactor shutdown, and (2) dissipation of residual heat after an accident. The guide also states that sufficient conservatism should be provided to ensure that a 30-day supply of water is available and that the design basis temperatures of safety-related equipment are not exceeded. For a UHS where the supply may be limited and/or the temperature of plant intake w&ter from the sink may become critical, transient analysis of supply and/or temperature should be performed. Sufficient information should be available to substantiate the assumptions and analytical methods used, i.e., 30-day cooling supply analysis.

A review of Combustion Engineering Owners Group (CEOG) topical report CE-NPSD-925, " Guidelines for Addressing Instrument Uncertainties in Emergency i Operating Procedures and Technical Specifications," indicates that the UHS temperature is defined as use code U33 and a Category 1 variable. Use code 33 as defined by CE-NPSD-925 applies to instrument applications used to verify that equipment needed to place or maintain the plant in HOT or COLD SHUTDOWN see nnor:M e ratagnry I as stated by CE-NPSD-925 applies to instrument i applications that possess a high degree of nuclear safety significance. A Category I instrument application requires an explicit instrument uncertainty calculation be performed using ISA 567.04 as guidance. The staff notes that this is a guidance document and employs techniques (grading) not presented or endorsed by ISA 567.04-1982 or RG 1.105, Revision 2, 1986. Therefore, the licensees evaluation of UHS instrumentation may have justified an alternative classification or other treatment of uncertainty than the guidance provided by CE-NPSD-925.

Based on our review, the staff concludes that the application of ISA 567.04-1982 as endorsed by R.G. 1.105, Revision 2, 1986, to instrumentation other than RPS cr ESFAS instrumentation setpoints even if used for the evaluation of TS compliance (LCOs) is not specifically addressed by ISA 567.04-1982, R.G.1.105 or 10 CFR 50.36. The staff notes that the UHS temperature is an LCO without a LSS3 or a specific safety limit assigned.

However, the UHS LCO provides operability determination criteria and confirmation that a design limit is met. Both GDC 13, and 10 CFR Part 50, Appendix B, indicate that for monitored variables such as UHS temperature.

t l

j

  • l

_4 instrumentation shall be provided to maintain these variables within a prescribed operating range and that the test incorporate requirements and acceptance limits. An evaluation may show that instrument uncertainty for the Millstone Unit 2 UHS is included in the plant safety analysis, accounted for in the TS limiting value, or accounted for in the measured value, surveillance, or emergency procedure. It is the staff's position, therefore, that for variables such as UHS temperature, the instrumentation, measurement ar.d test equipment, and procedures are tc be evaluated such that the stated acceptance criteria is bounding for the safety analysis including any -

uncertainties assumed in the analysis. The application of ISA 567.04-1982/ )

R.G.1.105 to other than RPS or ESFAS instrumentation provides an acceptable means to identify and document instrument uncertainty assumptions, comply with 10 CFR Part 50, Appendix A, Criterion 13 and 10 CFR Part 50, Appendix B, Part XI and ensure that these assumptions are maintained by the installed instrumentation, test equipment, and procedures. However, ISA standard 567.04-1982 is not required in that other means or methodologies may be utilized in lieu of the ISA star.dard.