Discusses RCS Operational Leakage Limits for New Sts.Informs That Owners Groups Requested That Staff Position on Limit in New STS Be Held in Abeyance Until Reconsideration Finalized
ML20236K803
Person / Time
Issue date: 04/02/1992
From: Charemagne Grimes
Office of Nuclear Reactor Regulation
To: Clark R, Rosalyn Jones, Wiggins J
NRC, Office of Nuclear Reactor Regulation
Shared Package
ML20236J990 List: ... further results
References
FOIA-98-155 GL-88-01, GL-88-1, NUDOCS 9807100088
Download: ML20236K803 (3)


Text

_ _ _ _ - _ _ _ _ _ _ _ _ .

v*

p uauk O  % UNITED STATES

) {. .I NUCLEAR REGULATORY COMMISSION wAssimarow. o.c. mises

          • April 2, 1992 MEMORANDUM FOR: James Wiggins, Chief Materials and Chemical Engineering Branch, DET Robert Jones, Chief Reactor Systems Branch, DST Richard Clark, Lead Project Manager l Generic Letter 88-01 (

FRON: Christopher Grimes, Chief Technical Specifications Branch

SUBJECT:

RCS OPERATIONAL LEAKAGE LIMIT During the course of discussions on RCS operational leakage limits for the new Standard Technical Specifications (STS), the owners Groups noted that the majority of BWRs and the current STS have a limit of 2 gpm increase in UNIDENTIFIED LEAKAGE within a 4-hour period, rather than the 2 gpm increase within a 24-hour period required by Generic Letter 88-01. The Owners Groups also indicated that the BWR Owners have requested that the technical staff reconsider the limit in GL 88-01. As a result, the Owners Groups requested that OTSB's position on the limit in the new STS be held in abeyance until the reconsideration is finalized.

Inasmuch as the Technical Specification Improvement Program is a voluntary effort, it is impractical for OTSB to impose a more stringent requirement than that reflected in the existing licenses. Accordingly, we have retained the 1 requirement in the existing STS (2 gpm within a 4-hour period) with the  !

understanding that, upon generic resolution of this issue, the generic l requirement would be incorporated into the new STS. Further, we have included this limit in brackets; as such, it is designated as an item to be reviewed on a plant-specific basis during the conversions to the new STS.  ;

A proof and review version of the new STS is scheduled to be issued in June 1992. In the event that the generic requirements in GL 88-01 are resolved before that time, we will incorporate any necessary changes into that version of the new STS.

~

9807100088 980624 PDR FOIA

,UNNERST98-155 PDR _

9 April 2, 1992 Should you have any questions regarding this matter, you may contact me (504-1161) or Maggalean Weston (504 3151).

i Christopher Grimes, Chief

Technical Specifications Branch Division of Operational Events Assessment ec
C. Rossi l J. Richardson A. Thadant 1

i i

l I

t.

April 2, 1992 Should you have any questions regarding this matter, you may contact me (504-1161) or Maggalean Weston (504-3151).

Drigir.af Sign!d By Christopher Grimes, Chief Technical Specifications Branch

. Division of Operational Events Assessment cc: C. Rossi J. Richardson A. Thadant DISTRIBUTION:

Central Files OTSB R/F DOEA R/F CERossi CIGrimes l RLEmch l FMReinhart MWeston CHBerlinger AEchaffee OTSB Members Document Name: A:\RCS_ LEAK.CIG

OTSB
D0 : RR OTSB:DOEA:N C:0TSB:00EA:NRR MWeston FMReinhar l

IGrimes g f/g/9

't /z/92 r/2 /92 OFFICIAL RECORD COPY

,