Notification of 970522 Meeting W/Util in Rockville,Md to Allow Licensee to Brief NRC Staff on Results of Analyses of Damage to Unit 1 SG That Was Caused by Parts of Failed Guide Tube Pin Assembly on or About 960529
ML20141E178
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/16/1997
From: Larry Wheeler
NRC (Affiliation Not Assigned)
To: Berkow H
NRC (Affiliation Not Assigned)
References
NUDOCS 9705200356
Download: ML20141E178 (5)


Text

- .. .. . . .. -- . - - .- - . . .

May 16, 1997 l

l L MEMORANDUM T0: Herbert N. Berkow, Director Project Directorate 11-2  !

Division of Reactor Projects - I/II '

i FROM: Louis L. Wheeler, Senior Project Manager Original signed by:

l Project Directorate II-2 ,

Division of Reactor Projects - I/II

~

l

SUBJECT:

FORTHCOMING MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY  !

(SNC) ON THE RESULTS OF UNIT 1 STEAM GENERATOR ANALYSES -

V0GTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 l DATE & TIME: Thursday, May 22, 1997 - 12:45 p.m. tn 2:45 p.m.

LOCATION: U.S. Nuclear Regalatory Commission One White Flint North l 11555 Rockville Pike Confernece Room 08-B11 Rockville, MD 20852 PURPOSE: The purpose of the meeting is for SNC to brief the NRC staff on the results of their analyses of the damage to the Unit I steam generator that was caused by parts of a failed control rod drive guide tube pin assembly on or about May 29, 1996.

PARTICIPANTS *: NRC SNC L. Wheeler, NRR L. Ward E. Sullivan, NRR W. Burmeister et al. H. Majors l S. Lee l A. Vaia (Westinghouse)

R. Keating (Westinghouse)

J. Tain (Westinghouse)

D. Peck (Westinghouse)

G. Whiteman (Westinghouse) l Docket Nos. 50-424 and 50-425

Enclosure:

Agenda cc w/ encl: See next page h '

CONTACT: Louis L. Wheeler, NRR

! 415-1444 1

!

  • Meetings between NRC technical staff and applicants or licensees are open for
interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings

]

Open to the To em a copy of thisPublic",59 Federal deeunient indesee he ter hea: Reoister 48340,9/20/94.

"C" = Copy wthout attachment / enclosure *E' = Copy wtth attachment / enclosure No copy N f

! 0FFICE LA PD22:04pe N l E Pel:PD22JWIPE l 0:Ptyt2'n l l

[ llAfE LBerfy M) LWhe6{ef:en MSufrklelI" /

j DATE 5/ $97 5/ /(ff7 5// Q97./

)0CUMENT iiAME: G:\V0GTLE\V0G0522.97 0FFICIAL RECORD COPY 9705200356 970516 i' PDR ADOCK 05000424 P PDR

A RET p h UNITED STATES

, s* j NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 2056&4001

% May 16,1997 MEMORANDUM TO: Herbert N. Berkow, Director Project Directorate II-2 Division of Reactor Projects - I/II FROM: Louis L. Wheeler, Senior Project Manager m[

i, Project Directorate 11-2 Division of Reactor Projects - I/II

SUBJECT:

FORTHCOMING MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY (SNC) ON THE RESULTS OF UNIT 1 STEAM GENERATOR ANALYSES -

j V0GTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 j DATE & TIME: Thursday, May 22, 1997 - 12:45 p.m. to 2:45 p.m.

i LOCATION: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Conference Room 08-811 Rockville, MD 20852 i

PURPOSE: The purpose of the meeting is for SNC to brief the NRC staff on the results of their analyses of the damage to the Unit I

! steam generator that was caused by parts of a failed control i rod drive guide tube pin assembly on or about May 29, 1996.

PARTICIPANTS *: NRC -

SNC L. Wheeler, NRR L. Ward E. Sulliyan, NRR W. Burmeister 4

et al. H. Majors

< S. Lee A. Vaia (Westinghouse)

R. Keating (Westinghouse)

J. Tain (Westinghouse)

D. Peck (Westinghouse)

G. Whiteman (Westinghouse)

Docket Nos. 50-424 and 50-425

Enclosure:

Agenda cc w/ encl: See next page CONTACT: Louis L. Wheeler, NRR 415-1444

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reaister 48340, 9/20/94.

y May 16, 1997 E-Mai!

R. Zimmerar.n (RPZ)

S. Varga (SAV)

H. Berkow (HNB)

L. Berry (LGB) l D. Ross (e-mail to SAM) l OPA (0PA)

E. Sullivan -

J. Johnson, RII P. Skinner, RII G. Tracy (GMT)

K. Clark (KMC2)

PMNS Hard Cooy Docket File PUBLIC PD II-2 Rdg.

OGC ACRS cc: Licensee & Service List

, Vogtle Electric Generating Plant Units 1 and 2 cc:

Mr. J. A.' Bailey Harold Reheis, Director Manager, Licensing Department of Natural Resources Southern Nuclear Operating 205 Butler Street, SE. Suite 1252 Company, Inc. Atlanta, Georgia 30334 P. O. Box 1295 Birmingham, Alabama 35201-1295 Attorney General Law Department

. Mr. J. B. Beasley 132 Judicial Building Gen 3ral Manager, Vogtle Electric Atlanta, Georgia 30334

Generating Plant Southern Nuclear Operating Mr. Thomas P. Mozingo Company, Inc. Program Manager
P. O. Box 1600 Nuclear Operations

. Waynesboro, Georgia 30830 Oglethorpe Power Corporation i

2100 East Exchange Place Regional Administrator, Region II P. O. Box 1349 U. S. Nuclear Regulatory Comission Tucker, Georgia 30085-1349 Atlanta Federal Center 61 Forsyth Street, SW., Suite 23T85 Charles A. Patrizia, Esquire Atlanta, Georgia 30303 Paul, Hastings, Janofsky & Walker 12th Floor iffice of Planning and Budget 1050 Connecticut Avenue, NW.

' Room 615B . Washington, DC 20036 ,

270 Washington Street, SW.
Atlanta, Georgia 30334 Arthur H. Domby, Esquire Troutman Sanders Office of the County Comissioner NationsBank Plaza Burke County Comission 600 Peachtree Street, NE.

Waynesboro, Georgia 30830 Suite 5200 Atlanta, Georgia 30308-2216 Mr. J. D. Woodard Executive Vice President Resident Inspector Southern Nuclear Operating U. S. Nuclear Regulatory Comission Company, Inc. 8805 River Road P. O. Box 1295 Waynesboro, Georgia 30830 Birmingham, Alabama 35201-1295 Steven M. Jackson Mr. C. K. McCoy Senior Engineer - Power Supply Vice President - Nuclear Municipal Electric Authority Vogtle Project of Georgia Georgia Power Company 1470 Riveredge Parkway, NW P. O. Box 1295 Atlanta, Georgia 30328-4684 Birmingham, Alabama 35201

. -i

,L MMA SOUTHERN NUCLEAR OPERATING COMPANY

, MEETING WITH THE NUCLEAR REGULATORY COMISSION May 22, 1997

)

l 4

Introduction  !

i i

, Tube-to-tubesheet Original Design Basis (ASME Section III)

Design Specifications

Stress Analysis i Present Steam Generator Condition, and

! Current Operational Design Basis (ASME Section XI)

Long Ters Operation l

i WCAP-14871 )

FSAR Update -

I ENCLOSURE i i

i J