Forwards SER Including Results of Review Re Determination of Emergency Power Supply TS Requirements at Plant,Unit 1, 2 & 3.Staff Determined That TS Surveillance Required for Mod & Therefore,Required Prior NRC Approval
ML20236L590
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 12/29/1994
From: Berkow H
Office of Nuclear Reactor Regulation
To: Merschoff E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20236J990 List: ... further results
References
FOIA-98-155 TAC-M88279, TAC-M88280, TAC-M88281, NUDOCS 9807130085
Download: ML20236L590 (2)


Text

Division of Reactor Prdecis, RIgion II

~~

FROM:

Herbert N. Berkow, Dirsctor Project Directorate II-3 j

Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation -

SUBJECT:

TTA 94-012 - DETERMINATION OF EMERGENCY POWER SUPPLY TEQiNICAL SPECIFICATION REQUIREMENTS AT OCONEE, UNITS 1, 2, AND 3 (TAC NOS. M88279/M88280/M88281)

By memorandum dated March 24, 1994, Region II submitted Task Interface Agreement (TIA)94-012 for staff resolution. The specific issues related to '

whether the proposed implementation of a modification to the Keowee emergency power system required prior NRC approval and whether alignment of both Keowee units to the electrical grid simultaneously was in compliance with the current Oconee TS.

The Electrical Engineering Branch, assisted by the Technical Specifications Branch, has reviewed this issue. A copy of the results of their review is attached. The staff determined that a TS surveillance was required for this modification and therefore required prior NRC approval.

It was also determined that current TS could not be considered to prohibit simultaneous generation to the network grid by the Keowee units. There was no clear l

consenses among the staff that the modification involved an unreviewed safety question, and therefore we cannot conclude that TS 3.7.1.b would prohibit the I

modification to be implemented without prior NRC approval. However, since a TS surveillance was required, the violation of the 10 CFR 50.59 process would still be valid.

Please contact Len Wiens at (301) 504-1495 if you have any questions.

concerning this review. This completes our actions on TAC Nos. M88279, M88280, and M88281.

Docket Nos. 50-269. 50-270 and 50-287

Attachment:

Safety Evaluation of TIA 94-012 cc w\\attathment.

R. Cooper, RI E. Greenman, RIII B. Beach, RIV K. Perkins, RIV/WCF0 td.S To '.

OTb (C

PDII-3 R/F g

f. @r h\\ w T "5d J. Roe, 0-13 C. Berlin r, 0-7 E4

_ ' cyy\\Mb:fl C. Gri

, 0-11 E22 armon R

-. ~. - -. _... ~. -

0FFICE LA:PD23:Dah l E PM:PD23:DaPE l Jt' D:PD23:MMm l f--

1 I

hApE LSerry 1 / d6, f LWiens:dt dr L NBerkop W/

DATE

/7) W ' 4 W

/>/f 7/4J/

( hSOlh 0FFICIAL RECOR) COPY DOCUMENT NAME: G:\\0CONEE\\TIA3412.1 9007130085 900624

//

PDR FOIA UNNERST98-155 PDR

/

"> //j u R L 3

s.o rsig A

S UNITED STATES 5,

J NUCLEAR REIGULATORY COMMISSION g...../

ws:Hiwcrow, o.c. osssoooi December 29, 1994 MEMORANDUM T0:

Ellis W. Merschoff, Director Division of Reactor Projects, Region II FROM:

Herbert N. Berkow, Director Project Directorate II-3

)

I' Division of Reactor Project Office of Nuclear Reactor gul tion

SUBJECT:

TIA 94-012 - DETERMINATION OF EMERGENCY POWER SUPPLY TECHNICAL SPECIFICATION REQUIREMENTS AT OCONEE, UNITS 1, 2, AND 3 (TAC NOS. M88279fM88280/M88281)

By memorandum dated March 24, 1994, Region II submitted Task Interface Agreement (TIA)94-012 for staff resolution. The specific issues related to whether the proposed implementation of a modification to the Keowee emergency power system required prior NRC approval and whether alignment of both Keowee units to the electrical grid simultaneously was in compliance with the current Oconee TS.

The Electrical Engineering Branch, assisted by the Technical Specifications Branch, has reviewed this issue. A copy of the results of their review is attached. The staff determined that a TS surveillance was required for this modification and therefore required prior NRC approval.

It was also determined that current TS could not be considered to prohibit simultaneous generation to the network grid by the Keowee units. There was no clear consensus among the staff that the modification involved an unreviewed safety question, and therefore we cannot conclude that TS 3.7.1.b would prohibit the i

modification to be implemented without prior NRC approval. However, since a TS surveillance was required, the violation of the 10 CFR 50.59 process would still be valid.

Please contact Len Wiens at (301) 504-1495 if you have any questions concerning this review. This completes our actions on 1AC Nos. M88279, M88280, and M88281.

Docket Nos. 50-269, 50-270 and 50-287

Attachment:

Safety Evaluation of TIA 94-012 cc w\\ attachment: