ML20217M428

From kanterella
Jump to navigation Jump to search

Requests That Attached Request for Addl Info Be Placed in Pdr.Informs That RAI Faxed to J Bailey on 991008 & Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC Staff & SNC Staff
ML20217M428
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/08/1999
From: Assa R
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
TAC-MA4356, NUDOCS 9910270217
Download: ML20217M428 (5)


Text

-o October 8, 1999

3. .

MEMORANDUM TO: Docket File FROM: Ramin R. Assa, Project Manager, Section 1 Original signed by:

Project Directorate 11 Division of Licensing Project Management '

Office of Nuclear Reactor Regulation

SUBJECT:

VOGTLE UNITS 1 AND 2 - PLACEMENT OF A DOCUMENT IN THE PUBLIC DOCUMENT ROOM RELATED TO FIRST 10-YEAR INTERVAL INSERVICE (ISI) REQUESTS FOR RELIEF (TAC NO. MA4356) l Please place the attached Request for Additionallnformation (RAl) in the NRC's Public Document Room.- The attached RAI was faxed, today, to Mr. Jim Bailey of the Southern Nuclear Operating Company, Inc. (SNC). The attachment will be used to facilitate discussions during an upcoming conference call between the NRC and SNC staff. This document does not constitute a formal roquest for information nor does it represent a formal NRC staff position.

. C

$ p Docket No. 50-425 y . a F; 8

Attachment:

As stated

]N 'fn Distribution: E

PUBLIC' 3 $

PD 111 R/F E r.n 5

DOCUMENT NAME: G:\PDil-1\VOGTLE\95-07PDR wpd To rcceive a copy of this document, indicate in the box C= Copy w/o atta.chment/erciosure E= Copy with attachment / enclosure N = No copy OFFICE - PDil-1/PW h PDil-1/LA h PDil/SC gN( j NAME RAssa:cnb CHawes O/M REmc DATE ld/ '[ /99 [b / f /99 [$ / 7 /99 OFFICIAL RECORD COPY 9910270217 991008 "'

PDR ADOCK 05000424 P PDR

ga 4%g y .p Ft UNITED STATES j ,j

't NUCLEAR REGULATORY COMMISSION WASHINGTON D,c. 20555-4001 o

%, . . . October 8, 1999.

MEMORANDUM'TO: Docket File FROM:- Ramin R. Assa, Project Manager, Section 1  ;

Project Directorate 11 4 l

Division of Licensing Project Managemerp j Office of Nuclear Reactor Regulation ,

SUBJECT:

- VOGTLE UNIT 2 - PLACEMENT OF A DOCUMENT IN THE PUBLIC ,

DOCUMENT ROOM RELATED TO FIRST 10-YEAR INTF.RVAL INSERVICE (ISI) REQUESTS FOR RELIEF (TAC NO. MA4356) '

I Please place the attached Request for Additio.nal Information (RAl) in the NRC's Public i

Document Room. .The attached RAI was faxed, today, to Mr. Jim Bailey of the Southern Nuclear Operating Company, Inc. (SNC). The attachment will be used to facilitate discussions  !

during an upcoming conference call between the NRC and SNC staff. This document does not )

constitute a formal request for information nor does it represent a formal NRC staff position.

Docket No. 50-425 .

Attachment:

As stated

TECHNICAL LETTER REPORT ,

ON FIRST 10-YEAR INTERVAL INSERVICE INSPECTION ]

REQUESTS FOR RELIEF 1 EOR SOUTHERN NUCLEAR OPERATING COMPANY  !

VOGTLE ELECTRIC GENERATING PLANT. UNIT 2 I DOCKET NUMBER 50-425 1

1. SCOPE l

l By letters dated November 30,1998 (Letters LCV-1279, and LCV-1280), the licensee, Southern Nuclear Operating Company, submitted a proposed alternative from the augmented reactor pressure vessel examination required by 10 CFR 50.55a(g)(6)(ii)(A) and other requests for relief from the requirements of the ASME Code,Section XI, for the Vogtle Electric Generating Plant, Unit 2. The proposed alternative and relief requests are for the first 10-year inservice inspection (ISI) interval. Based on our review, the following additionalinformation is required to complete the evaluation of the subject requests for relief.

l

2. INFORMATION REQUIRED 2.? Request for Relief RR-20 (Revision 1)- The Code requires 100% volumetric and surface examinations of the welds identified in the licensee's submittal. The licensee stated that complete examination of these welds is limited by physical limitations due to geometric configuration. The table provided in the licer'see's submittal provides minimalinformation on coverages achieved. Please provide specific description of geometrical constraints or interferences, and drawings or sketches showing the specific configurations of the subject welds to demonstrate the impracticality of meeting the Code examination coverage requirements. This information is needed to support the determination that the subject Code requirements are impractical in accordance with 10 CFR 50 55a(g)(6)(i).

.2.2 ' Request for Relief RR-30 (Part C-B)*- The Code requires 100% volumetric and surface examinations of the welds identified in the licensee's submittal. The licensee stated that complete examination of these welds is limited by physical

l limiiations due to component configuration. The table provided in the licensee's submittal provides minimalinformation on coverages achieved. Please provide specific description of geometrical constraints or interferences, and drawings or

sketches showing the specific configurations of the subject welds to demonstrate the impracticality of meeting the Code examination coverage requirements. This information is needed to support the determination that the subject Code requirements are impractical in accordance with 10 CFR 50.55a(g)(6)(i).
j. Additionally, it is unclear whether relief is for volumetric coverage, surface

]

coverage, or both. Provide clarification detailing the specific examination coverages requiring relief.

l 2.3 Request for Relief RR-34 (Part C-F-1)- The Code requires 100% volumetric and surface examinations of the welds identified in the licensee's submittal. The licensee stated that complete exami-nation of these welds is limited by physical limitations due to geometric configuration, and component obstructions. The table provided in the licensee's submittal provides minimal information on coverages achieved. Please provide specific description of geometrical constraints or I

interferences, and drawings or sketches showing the specific configurations of the subject welds to demonstrate the impracticality of meeting the Code examination coverage requirements. This information is needed to support the determination that the subject Code requirements are impracticalin emdance with 10 CFR 50.55a(g)(6)(i). '

2.4 Request for Relief RR In tne " Code Reauirement for Which Relief is l' Reauested" portion of the submittal, the licensee stated that " Relief is re' quested I

from the requirements of IWA-4000 and IWA-7000 of the 1983 Edition with Addenda through Summer 1983 for piping, valves, and fittings 1 inch NPS and smaller." In the " Basis for Relief" portion of the relief the licensee stated that "...

relief is requested from the record keeping requirements for repairs to piping and components 1-inch NPS and smaller."

.4 IWA-4000 ar.d IWA-7000 contain multiple requirements relating to Repair and Replacements, including; Repair Program Requirements, inspection, Materials,

. Welding and Welder Qualification, Pressure Testing, Examinations, Records, etc.

Based upon the multiple requirements listed in IWA-4000 and IWA-7000 it is  !

unclear what specific code requirement (s) the licensee is seeking relief from. The request for reliaf as written appears generic in nature and does not clearly identify-

- the specific requirement (s) for which relief is required, i.e., is the licensee seeking l relief from all of IWA 4000 and IWA-7000 or only IWA-4700 concerning records? '

Provide the specific code requirements (include paragraphs and subparagraphs) l I

for which relief is required. .

l l

J

)

,