ML20212E345
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML20212E345 | |
Person / Time | |
---|---|
Site: | University of Texas at Austin |
Issue date: | 02/20/1987 |
From: | Bauer T TEXAS, UNIV. OF, AUSTIN, TX |
To: | Berkow H Office of Nuclear Reactor Regulation |
References | |
NUDOCS 8703040329 | |
Download: ML20212E345 (1) | |
Similar Documents at University of Texas at Austin | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20210Q7171999-08-0202 August 1999
[Table view]Provides Rept of Violation of Surveillance TS TS4.2.4, Reactor Instrumentation Sys. Calorimetric Calibr of Reactor Power Instrument Channels Was Not Done in Necessary Annual Period.No Immediate Corrective Actions Necessary ML20206K7271999-05-0606 May 1999 Informs That MG Krause Will Be Reactor Supervisor & Assume Daily Supervisory Duties Previously Performed by T Bauer. T Bauer Will Continue as Assistant Director Concentrating Efforts on Extended Time Activities ML20206B1071999-04-21021 April 1999 Informs That Activities at Nuclear Engineering Teaching Lab, Continuing to Improve.Nuclear & Radiation Engineering Program Continues to Have Support from All Levels of Univ Administration - Dept,College & Institutional ML20205J2571999-03-26026 March 1999 Forwards Copy of Results of Operator Initial Exam Conducted at Univ of Texas at Austin on 990315-16.Without Encl ML20207B4341999-03-0202 March 1999 Forwards Insp Rept 50-602/98-201 on 981207-11.No Violations Noted ML20198S3041999-01-0606 January 1999 Discusses Telcon Between W Eresian & T Bauer Re Exam at Univ of Texas.Exam Scheduled During Month of Feb 1999. Rules & Guidelines That Will Be in Effect During Administration of Written Exam Encl ML20248F4661998-05-22022 May 1998 Notifies NRC That Licensee Intend to Reconstitute Committee Immediately,Rather than Wait Until Next Academic Yr ML20217M2201998-04-28028 April 1998 Forwards Replacement Page 3-13 to Univ of Tx 1997 Annual Rept.Corrections to Page Consists of Several Transcription Errors Incorrectly Categorizing Several of Tabulated Doses IR 05000602/19972011998-01-0909 January 1998 Forwards Insp Rept 50-602/97-201 on 970929-1003.No Violations Noted.Previous Level IV Violation Was Closed ML20113A1021996-06-0606 June 1996 Notifies of Change of Name of Balcones Research Ctr to Pickle Research Campus & Addition of Two Annotations for Interlock Requirements of TS W/Rcs Interlocks,Section 3.2.2, Per Conversation W/Nrc.Amended TS Pages 14 & 24 Encl ML20107K5251996-04-16016 April 1996 Forwards Response to NRC 960325 Rai,Supplementing Response Made on 951111 & Original Amend Request to Correct Lanquage in Ts.Affected TS Page Also Encl ML20094G5401995-11-11011 November 1995 Submits Response to Request for Addl Info Re NRC Ltr & Original Amend Requested .No Change to Reactor Operating Conditions Being Proposed ML20085M4361995-06-21021 June 1995 Submits Info Re Control of Access to Radiation in Beams ML20084A9671995-05-24024 May 1995 Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-602/95-01.Corrective Actions:Review of Reactor Committee Minutes Was Done by Facility Director for Period 1/92 to 4/95 ML20056C3161993-05-0404 May 1993 Forwards Proprietary Response to NRC Ltr Re Violations Noted in Insp Rept 50-602/93-01 on 930317-18.Encl Withheld,Per 10CFR2.790 ML20056C1471993-03-23023 March 1993 Confirms Arrangements Made on 930304 to Hold Meeting on 930429 to Discuss Performance Perspectives of Licensed Activities at Nuclear Engineering Teaching Lab.Proposed Meeting Agenda Encl ML20127M9821993-01-21021 January 1993 Forwards Correction to License R-129,changing Wording on Page 7-12 ML20126L0801993-01-0505 January 1993 Forwards Insp Repts 50-192/92-02 & 50-602/92-02 on 921207-11.No Violations or Deviations Noted ML20095L8181992-04-15015 April 1992 Advises That Assembly Error Made at Triga Fabrication Facility in That Two Wires on Potentiometer on CRD Mechanisms Reversed,Per 920311 Telcon ML20091Q3981992-01-23023 January 1992 Forwards Executed Amendment to Indemnity Agreement E-25 & 14 ML20085D1821991-10-0404 October 1991 Forwards Univ SAR Amend Pages for Rev 1.01 Dtd May 1991 ML20083D3691991-09-24024 September 1991 Submits Info Re Availability of Funds for Future Decommissioning of Reactor,Per 10CFR50.33 & 10CFR50.75 ML20073R0131991-05-24024 May 1991 Requests Extension of CP CPRR-123 for Four Addl Months to Provide Time for Review of NRC Questions.Current Expiration 910630.Final Response & Amended SAR Being Sent by Separate Ltr ML20073R1061991-05-24024 May 1991 Forwards Rev 1.01 to Sar,Response to NRC Questions,Per 910222 Request for Addl Info & List of Matl Subj to License Request ML20073E6891991-04-15015 April 1991 Forwards Rev 1 to PLAN-O, Call & Notification & PLAN-E, Emergency Response, QA Plan & Pages 12,20 & 21 of Emergency Response Plan ML20066J3141991-02-12012 February 1991 Forwards Rev 1 to Tech Specs.Changes Made by Discussion & Concurrence W/Nrc ML20066E2641991-01-11011 January 1991 Forwards Rev 1 to Emergency Response Plan. Annotated Copy Also Encl to Assist Review Process Due to Editorial Changes Made to Reword Sentences ML20065Q3231990-12-11011 December 1990 Informs That Extension Date Incorrectly Stated as 900630 in .Correct Extension Date Should Read 910630 ML20062H0371990-11-26026 November 1990 Submits List of Matl Required to Complete Evaluation for Issuance of OL Including Updated Emergency & Operator Requalification Plans & Final Tech Specs & Bases.Three Open Items identifed,602/8904-05,602/8904-06 & 602/9003-01 ML20065S1391990-11-21021 November 1990 Forwards Rev 0 to QA Plan ML20056B2541990-08-13013 August 1990 Forwards Rev 1 to Physical Security Plan.Encl Withheld ML20055D0401990-06-18018 June 1990 Updates Status of Items from Past Insps for Cp.Efforts to Reasonably Complete Items within Constraints of No Matl License Complete ML20043G6341990-06-0606 June 1990 Forwards Physical Security Plan.Plan Withheld ML20006E2981990-02-0909 February 1990 Forwards J Cox 891218 Ltr for Consideration & Compliance,If Possible ML20245G8181989-06-19019 June 1989 Informs of Bw Wehring Appointment as Director of Nuclear Engineering Teaching Lab at Univ of Texas,At Austin,Per License R-92,Tech Spec 6.2c3 & 6.2.2a.Curriculum Vitae of Wehring Encl ML20235Y3541989-02-24024 February 1989 Forwards Order Extending Const Completion Date of Triga Mark II Reactor to 891231,safety Evaluation & Environ Assessment & Finding of No Significant Impact,Per 881017 Request ML20204G2111988-10-17017 October 1988 Forwards Insp Rept 50-602/88-05 on 880922-23.No Violations or Deviations Noted ML20206E5261988-10-17017 October 1988 Requests Extension of Final Completion Date by 4 Months to 890430 for CP CPRR-123.Termination of General Contractor of Record Effective 881013 Requires Assumption of Project Responsibility by Continental Insurance Co IR 05000192/19880021988-09-0202 September 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-192/88-02 & 50-602/88-02 IR 05000192/19880011988-06-0808 June 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-192/88-01 & 50-602/88-01.Based on Listed Understanding of Util Response, Per 880516 Telcon,Actions Responsive to NRC Concerns ML20150F3181988-04-22022 April 1988 Responds to NRC Re Violations Noted in Insp Rept on 880324.Corrective Actions:Immediate Check of Review Dates on All Procedures & List Made of All Mods of Any Type ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager ML20236Q9571987-11-0606 November 1987 Advises That NETL Project Progress Continues W/Projected Completion Date of 880610.Present Figures Indicate 46% Completion by mid-Oct.Key Items & Date Estimates Listed ML20236F7581987-10-26026 October 1987 Informs That Effective 871025,JL Pellet Will Replace R Cooley as Section Chief of Operator Licensing Section in Div of Reactor Safety ML20212E3451987-02-20020 February 1987 Advises of Correction to Project Completion Date Noted in .Completion Date in Sentence Two Corrected to June 1988 ML20211B3191987-02-0606 February 1987 Informs That Bids for Docket 50-602 Project Opened on 861021 W/Award of General Contract on 861204.Dismantling Activities of Docket 50-192 License Projected to Commense in Aug or Sept 1988.Submits Info to Suppl 850503 Decommissioning Plan ML20207N0351986-12-0808 December 1986 Forwards Notice of 861215 Preconstruction Conference in Austin,Tx to Discuss Const Schedule Available from Cit,Inc of Texas.Set of Plans & Specs Should Be Sent by 851208 from Ws Martin ML20203C0911986-07-10010 July 1986 Informs That Bid Advertisement for Completion of Docket 50-602 & Dismantling of Docket 50-192 Scheduled for 860817 W/Bid Openings Planned for 860916 ML20210Q1481986-05-0606 May 1986 Forwards Evaluation of 841217 & 850814 Physical Security Plans.Plans Satisfy Physical Protection Requirements of 10CFR73.67(f) & Acceptable ML20140F3181986-03-26026 March 1986 Advises of NRR Reorganization.Telephone Number of J Dosa Changed.D Tondi New Section Leader for Nonpower Reactors & Safeguards Licensing Section.Correspondence Should Be Addressed to Nrc,Attention Document Control Desk 1999-08-02 Category:EDUCATIONAL INSTITUTION TO NRC MONTHYEARML20056B2541990-08-13013 August 1990
[Table view]Forwards Rev 1 to Physical Security Plan.Encl Withheld ML20055D0401990-06-18018 June 1990 Updates Status of Items from Past Insps for Cp.Efforts to Reasonably Complete Items within Constraints of No Matl License Complete ML20043G6341990-06-0606 June 1990 Forwards Physical Security Plan.Plan Withheld ML20245G8181989-06-19019 June 1989 Informs of Bw Wehring Appointment as Director of Nuclear Engineering Teaching Lab at Univ of Texas,At Austin,Per License R-92,Tech Spec 6.2c3 & 6.2.2a.Curriculum Vitae of Wehring Encl ML20206E5261988-10-17017 October 1988 Requests Extension of Final Completion Date by 4 Months to 890430 for CP CPRR-123.Termination of General Contractor of Record Effective 881013 Requires Assumption of Project Responsibility by Continental Insurance Co ML20150F3181988-04-22022 April 1988 Responds to NRC Re Violations Noted in Insp Rept on 880324.Corrective Actions:Immediate Check of Review Dates on All Procedures & List Made of All Mods of Any Type ML20236Q9571987-11-0606 November 1987 Advises That NETL Project Progress Continues W/Projected Completion Date of 880610.Present Figures Indicate 46% Completion by mid-Oct.Key Items & Date Estimates Listed ML20212E3451987-02-20020 February 1987 Advises of Correction to Project Completion Date Noted in .Completion Date in Sentence Two Corrected to June 1988 ML20211B3191987-02-0606 February 1987 Informs That Bids for Docket 50-602 Project Opened on 861021 W/Award of General Contract on 861204.Dismantling Activities of Docket 50-192 License Projected to Commense in Aug or Sept 1988.Submits Info to Suppl 850503 Decommissioning Plan ML20207N0351986-12-0808 December 1986 Forwards Notice of 861215 Preconstruction Conference in Austin,Tx to Discuss Const Schedule Available from Cit,Inc of Texas.Set of Plans & Specs Should Be Sent by 851208 from Ws Martin ML20203C0911986-07-10010 July 1986 Informs That Bid Advertisement for Completion of Docket 50-602 & Dismantling of Docket 50-192 Scheduled for 860817 W/Bid Openings Planned for 860916 ML20133G8491985-10-0909 October 1985 Forwards Revised Tech Specs for License Submittal.Revs Include Changes in Form,Per NRC Request ML20134E3431985-08-14014 August 1985 Forwards Revised Tech Specs to Suppl 841109 License Application.Revs Include Most Recent Info Available & Changes Per Telcons W/Nrc ML20133H1471985-08-14014 August 1985 Forwards Revised Security Plan,Per 850313 & 29 Telcons. Plan Withheld (Ref 10CFR73.21 & 2.790) ML20132D2421985-07-0101 July 1985 Requests Application for CP Operating Permit & Environ Assessment for Research Reactor Be Forwarded to Author at Listed Address ML20117P1741985-05-14014 May 1985 Advises That Should Be Amended to Request Latest Facility Completion Date of 881231.Previous Date of 871231 Should Be Supplemented by Encl Latest Date,Per Telcon W/Nrc ML20116N7891985-05-0303 May 1985 Forwards Amended Application for Cp,Relocating Site 130 Meters from Original Location ML20116D4761985-04-22022 April 1985 Forwards Revised Tech Specs,Incorporating Changes in Response to Discussions During 850122 Site Visit & Telcons W/Nrc ML20115J1821985-04-15015 April 1985 Provides Financial Info as Amend to Paragraph (F) of General Info Submitted in 831109 License Application & Subsequent Submittals.Funding Approval for Major Changes in Physical Plant Is Responsibility of Board of Regents ML20113C7311985-04-0404 April 1985 Forwards Responses to NRC Questions Generated by Review of QA Program Submitted by 841109 ltr.Q-list for Structures,Sys & Components Encl ML20099H4271985-03-14014 March 1985 Forwards Supplemental Info in Support of 841109 Application & Subsequent 850227 Amend.Info Concerns Control Rods,Hvac Sys,Control Room Annunciator & Scram Channels ML20099H7501985-03-14014 March 1985 Forwards Response to Questions Re Reactor Operator Requalification Program Based on NRC Review of 841109 Application for License ML20099A2011985-02-28028 February 1985 Requests Extension Until 850315 to Respond to Request for Addl Info Re Operator Qualification & Requalification Portion of 841109 License Submittal ML20107M6161985-02-27027 February 1985 Forwards Response & Supplemental Response to Final Questions Re Initial Review & Site Visit to Proposed Reactor Facility, Per 841109 Application for License ML20107M6271985-02-27027 February 1985 Forwards Figure 1.0, Organizational Block Diagram & List of Titles of Emergency Procedures & Guidance Documents to Be Written in Support of Maintaining Emergency Preparedness,Per NRC 841109 Request ML20113E2821985-01-14014 January 1985 Certifies That Application for Cp/Ol Delivered to Governor M White,County Judge,M Renfro & Mayor R Mullen on 850114 ML20101F3301984-12-17017 December 1984 Forwards Physical Security Plan for Facility.Encl Withheld (Ref 10CFR2.790) ML20100J3011984-11-30030 November 1984 Notifies That All Correspondence Re License Application Should Be Sent to Director of Facility.Current Director & Appropriate Address Listed 1990-08-13 Category:INCOMING CORRESPONDENCE MONTHYEARML20210Q7171999-08-0202 August 1999
[Table view]Provides Rept of Violation of Surveillance TS TS4.2.4, Reactor Instrumentation Sys. Calorimetric Calibr of Reactor Power Instrument Channels Was Not Done in Necessary Annual Period.No Immediate Corrective Actions Necessary ML20206K7271999-05-0606 May 1999 Informs That MG Krause Will Be Reactor Supervisor & Assume Daily Supervisory Duties Previously Performed by T Bauer. T Bauer Will Continue as Assistant Director Concentrating Efforts on Extended Time Activities ML20206B1071999-04-21021 April 1999 Informs That Activities at Nuclear Engineering Teaching Lab, Continuing to Improve.Nuclear & Radiation Engineering Program Continues to Have Support from All Levels of Univ Administration - Dept,College & Institutional ML20248F4661998-05-22022 May 1998 Notifies NRC That Licensee Intend to Reconstitute Committee Immediately,Rather than Wait Until Next Academic Yr ML20217M2201998-04-28028 April 1998 Forwards Replacement Page 3-13 to Univ of Tx 1997 Annual Rept.Corrections to Page Consists of Several Transcription Errors Incorrectly Categorizing Several of Tabulated Doses ML20113A1021996-06-0606 June 1996 Notifies of Change of Name of Balcones Research Ctr to Pickle Research Campus & Addition of Two Annotations for Interlock Requirements of TS W/Rcs Interlocks,Section 3.2.2, Per Conversation W/Nrc.Amended TS Pages 14 & 24 Encl ML20107K5251996-04-16016 April 1996 Forwards Response to NRC 960325 Rai,Supplementing Response Made on 951111 & Original Amend Request to Correct Lanquage in Ts.Affected TS Page Also Encl ML20094G5401995-11-11011 November 1995 Submits Response to Request for Addl Info Re NRC Ltr & Original Amend Requested .No Change to Reactor Operating Conditions Being Proposed ML20085M4361995-06-21021 June 1995 Submits Info Re Control of Access to Radiation in Beams ML20084A9671995-05-24024 May 1995 Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-602/95-01.Corrective Actions:Review of Reactor Committee Minutes Was Done by Facility Director for Period 1/92 to 4/95 ML20056C3161993-05-0404 May 1993 Forwards Proprietary Response to NRC Ltr Re Violations Noted in Insp Rept 50-602/93-01 on 930317-18.Encl Withheld,Per 10CFR2.790 ML20095L8181992-04-15015 April 1992 Advises That Assembly Error Made at Triga Fabrication Facility in That Two Wires on Potentiometer on CRD Mechanisms Reversed,Per 920311 Telcon ML20091Q3981992-01-23023 January 1992 Forwards Executed Amendment to Indemnity Agreement E-25 & 14 ML20085D1821991-10-0404 October 1991 Forwards Univ SAR Amend Pages for Rev 1.01 Dtd May 1991 ML20083D3691991-09-24024 September 1991 Submits Info Re Availability of Funds for Future Decommissioning of Reactor,Per 10CFR50.33 & 10CFR50.75 ML20073R1061991-05-24024 May 1991 Forwards Rev 1.01 to Sar,Response to NRC Questions,Per 910222 Request for Addl Info & List of Matl Subj to License Request ML20073R0131991-05-24024 May 1991 Requests Extension of CP CPRR-123 for Four Addl Months to Provide Time for Review of NRC Questions.Current Expiration 910630.Final Response & Amended SAR Being Sent by Separate Ltr ML20073E6891991-04-15015 April 1991 Forwards Rev 1 to PLAN-O, Call & Notification & PLAN-E, Emergency Response, QA Plan & Pages 12,20 & 21 of Emergency Response Plan ML20066J3141991-02-12012 February 1991 Forwards Rev 1 to Tech Specs.Changes Made by Discussion & Concurrence W/Nrc ML20066E2641991-01-11011 January 1991 Forwards Rev 1 to Emergency Response Plan. Annotated Copy Also Encl to Assist Review Process Due to Editorial Changes Made to Reword Sentences ML20065Q3231990-12-11011 December 1990 Informs That Extension Date Incorrectly Stated as 900630 in .Correct Extension Date Should Read 910630 ML20065S1391990-11-21021 November 1990 Forwards Rev 0 to QA Plan ML20056B2541990-08-13013 August 1990 Forwards Rev 1 to Physical Security Plan.Encl Withheld ML20055D0401990-06-18018 June 1990 Updates Status of Items from Past Insps for Cp.Efforts to Reasonably Complete Items within Constraints of No Matl License Complete ML20043G6341990-06-0606 June 1990 Forwards Physical Security Plan.Plan Withheld ML20006E2981990-02-0909 February 1990 Forwards J Cox 891218 Ltr for Consideration & Compliance,If Possible ML20245G8181989-06-19019 June 1989 Informs of Bw Wehring Appointment as Director of Nuclear Engineering Teaching Lab at Univ of Texas,At Austin,Per License R-92,Tech Spec 6.2c3 & 6.2.2a.Curriculum Vitae of Wehring Encl ML20206E5261988-10-17017 October 1988 Requests Extension of Final Completion Date by 4 Months to 890430 for CP CPRR-123.Termination of General Contractor of Record Effective 881013 Requires Assumption of Project Responsibility by Continental Insurance Co ML20150F3181988-04-22022 April 1988 Responds to NRC Re Violations Noted in Insp Rept on 880324.Corrective Actions:Immediate Check of Review Dates on All Procedures & List Made of All Mods of Any Type ML20236Q9571987-11-0606 November 1987 Advises That NETL Project Progress Continues W/Projected Completion Date of 880610.Present Figures Indicate 46% Completion by mid-Oct.Key Items & Date Estimates Listed ML20212E3451987-02-20020 February 1987 Advises of Correction to Project Completion Date Noted in .Completion Date in Sentence Two Corrected to June 1988 ML20211B3191987-02-0606 February 1987 Informs That Bids for Docket 50-602 Project Opened on 861021 W/Award of General Contract on 861204.Dismantling Activities of Docket 50-192 License Projected to Commense in Aug or Sept 1988.Submits Info to Suppl 850503 Decommissioning Plan ML20207N0351986-12-0808 December 1986 Forwards Notice of 861215 Preconstruction Conference in Austin,Tx to Discuss Const Schedule Available from Cit,Inc of Texas.Set of Plans & Specs Should Be Sent by 851208 from Ws Martin ML20203C0911986-07-10010 July 1986 Informs That Bid Advertisement for Completion of Docket 50-602 & Dismantling of Docket 50-192 Scheduled for 860817 W/Bid Openings Planned for 860916 ML20133G8491985-10-0909 October 1985 Forwards Revised Tech Specs for License Submittal.Revs Include Changes in Form,Per NRC Request ML20134E3431985-08-14014 August 1985 Forwards Revised Tech Specs to Suppl 841109 License Application.Revs Include Most Recent Info Available & Changes Per Telcons W/Nrc ML20133H1471985-08-14014 August 1985 Forwards Revised Security Plan,Per 850313 & 29 Telcons. Plan Withheld (Ref 10CFR73.21 & 2.790) ML20128N6691985-07-0909 July 1985 Requests Univ of Texas 841109 Application for CP & OL & Environ Assessment ML20132D2421985-07-0101 July 1985 Requests Application for CP Operating Permit & Environ Assessment for Research Reactor Be Forwarded to Author at Listed Address ML20117P1741985-05-14014 May 1985 Advises That Should Be Amended to Request Latest Facility Completion Date of 881231.Previous Date of 871231 Should Be Supplemented by Encl Latest Date,Per Telcon W/Nrc ML20116N7891985-05-0303 May 1985 Forwards Amended Application for Cp,Relocating Site 130 Meters from Original Location ML20116D4761985-04-22022 April 1985 Forwards Revised Tech Specs,Incorporating Changes in Response to Discussions During 850122 Site Visit & Telcons W/Nrc ML20115J1821985-04-15015 April 1985 Provides Financial Info as Amend to Paragraph (F) of General Info Submitted in 831109 License Application & Subsequent Submittals.Funding Approval for Major Changes in Physical Plant Is Responsibility of Board of Regents ML20113C7311985-04-0404 April 1985 Forwards Responses to NRC Questions Generated by Review of QA Program Submitted by 841109 ltr.Q-list for Structures,Sys & Components Encl ML20099H4271985-03-14014 March 1985 Forwards Supplemental Info in Support of 841109 Application & Subsequent 850227 Amend.Info Concerns Control Rods,Hvac Sys,Control Room Annunciator & Scram Channels ML20099H7501985-03-14014 March 1985 Forwards Response to Questions Re Reactor Operator Requalification Program Based on NRC Review of 841109 Application for License ML20099A2011985-02-28028 February 1985 Requests Extension Until 850315 to Respond to Request for Addl Info Re Operator Qualification & Requalification Portion of 841109 License Submittal ML20107M6161985-02-27027 February 1985 Forwards Response & Supplemental Response to Final Questions Re Initial Review & Site Visit to Proposed Reactor Facility, Per 841109 Application for License ML20107M6271985-02-27027 February 1985 Forwards Figure 1.0, Organizational Block Diagram & List of Titles of Emergency Procedures & Guidance Documents to Be Written in Support of Maintaining Emergency Preparedness,Per NRC 841109 Request ML20113E2821985-01-14014 January 1985 Certifies That Application for Cp/Ol Delivered to Governor M White,County Judge,M Renfro & Mayor R Mullen on 850114 1999-08-02 |
Text
gaf-$ .. COLLEGE OF ENGINEERING
!.di c.J.1h %% THE UNIVERSITY OF TEXAS AT AUSTIN g/ DepartmentofMechanicalEngineering NudearEngineeringProgram Austin, Texas 78712-($12)471-3136 February 20, 1987 Atten: Herb Berkow Special Projects U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Docket 50-602, Correction to letter dated February 6, 1987
Dear Sir:
A correction of the project completion date submitted by letter dated February 6, 1987 is noted. The project com-pletion date June 1987 in the second sentence should be cor-rected to June 1988.
Sincerely, f&w 1 Thomas L. Bauer Nuclear Engineering Teaching Laboratory TLB:dlw cc: G. Fonken H. Walls H. Marcus D. Klein 870304 PDR k5 p A