Submits Info Re Availability of Funds for Future Decommissioning of Reactor,Per 10CFR50.33 & 10CFR50.75
ML20083D369
Person / Time
Site: University of Texas at Austin
Issue date: 09/24/1991
From: Fonken G
TEXAS, UNIV. OF, AUSTIN, TX
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9109300232
Download: ML20083D369 (3)


Text

-._.. _._.._._ _._._.-_.___ -. _ _ - - ~... - _.

m

-1

+ M(% _ EXECUTIVF VICE PRESIDENT AND PROVOST N

hk THE UNIVERSITY OF TEXAS AT AUSTIN g[wa f

Al.sinBuilding201 Austin, T<w 787i2-1111 (512)471-43(d 1%Xt512)47I-0577 September 24, 1991 I

l I

U.

S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D. C. 20555

Reference:

The University of Texas'TRIGA Reactor (UT-TRIGA);

Docket No. 50-602, License No. R-??

Subject:

Availability of funds for future decommissioning

'of The University of Texas at Austin TRIGA Reactor (UT-TRIGA) as per 10 CPR 50.33 and 10 t

CFR 50.75 Gentlemen:

In accordance with the requirements of 10 CFR 50.33 (k)

-(2),

10 CFR 50.75 (e) (2) (iv), the following decommissioning information - for. The University of Texas at Austin TRIGA Reactor (UT-TRIGA) is being submitted:

'1)

The cost for the complete decommissioning of the UT-TRIGA facility is estimated-to be $2.5 million.

A reference

research-reactor in the study performed by Pacific Northwest l-Laboratories for the U.S.

NRC and reported in NUREG/CR-1756 l-isLthe basis for-decommission funding estimates.

This 1981-

?

report estimated-complete decommissioning costs to be about

$1-.2 ~ million.

The multiplier for inflation is 1.54 based on-1 the (formula given in 10 CFR _50.75 (c)

(2), and data publishedE l'

by the Bureau: of-Labor and Statistics and information - in l'-

'NUREG-1307.

Use- -of this-factor -results in a

1990 l

decommissioning Icost : estimate of $1.8 million based on-j

-adjusting the original cost figure incorporated in NUREG/CR--

~

p 17.56.

However, a-recent commercial quotation for L

decommissioning a university reactor facil-Ity similar to the l

UT-TRIGA and actual decommissioning experiences at other L

similar_ facilities have-resulted in charges in excess of the ll S2.million mark.

Consequently,_ we believe the adjusted E

--NUREG/CR-1756 figure may be. low, and it is our' opinion that S2.5 -million is more realistic and appropriate value

-considering actual 1990 decommissioning costs.

9109300232 910924

,Q PDR--ADOCV 0500g2 1

g,J,

m

~_.-..._._. _.= _

y J

U.S. Nuclear Regulatory. Commission.

September 24,.1991 i

Page 2_-

4 2)

The-University of Texas ' at Austin is a state institution.

Therefore, in accordance with the provisions of 10 CFR 50.75 (e) (2)- (iv) the_ funds needed for decommissioning

.will be requested through appropriate state channels and will be obtained sufficiently in advance, of -- decommissioning to

-prevent delay of requ!_ed activities.

3)

The cost estimate _for decommissioning the Nuclear Engineering Teaching Laboratory facility will be adjusted annually using the formula given in 10 CFR 50.75(c) (2).

__ _ 4)

All records required by 10 CFR 50.75(g) will be kept and maintained by the Nuclear. Engineering--Teaching Laboratory staff.

5 )'

In accordance with - 10 CFR 50. 02 (a),

should the-University l decide-to p0rmanently cease operation of the UT-TRIGA, an application to decommission the facility will be made within two years following permanent cessation of operations or no later than one year prior to expiration of the operating license.

Information submitted'in this. report has been submitted to - the Nuclear Reactor Committee.

The data revises the previous estimate of $1.4 million _(1984 dollars) provided as-part of.the initial license submittal for the-docket 50-602 constn2ction.

We trust that the information will meet the Commission's regulatory requirements pertaining to this

_ matter.

Sincerely yours, l Q M w..

G.

J; Fonken Executive Vice. President-and Provost GJF/bp

-cc: _ Regional Administrator,-USNRC, Region IV

'H. Marcus, Chairman, Nuclear Reactor Committee B.

W.-Wehring, Director,_NETL R. Woodard, Health Physicist, _NETL T.-Bauer, Assisting Director, NETL B. Bryant, Safety Manager, UT

9 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of

(

4 The University of Texas

(

at Austin

(

Docket No. 50-60?

k Balcones Research Center Nuclear Engineering Teaching

(

Laboratory (NETL) k AFFIDAVIT Gerhard J.

Fonken being duly sworn, he-eby deposes and says that he is Executive Vice President and Provost, The University of Texas at Austin; that he is duly authorized to sign and file with the Nuclear Regulatory Commission the statement of intent to provide de corr:ni s s ioni ng funding for dscket 50-602 and Construction Permit CPRR-123; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge and belief, 9

7 bA 3 g[_<..._

Gerhard J.

Fonken Executive Vice President and Provort STATE of TEXAS

(

Subscribed and sworn to before me, a Notary Public in and for the State of Texas, this 24th day of September

. 1991.