J s,e In Reply Refer To:
JUN - 8 le Dockets: 50-192/88-01 50-602/88-01 University of Texas College of Engineering Department of Mechanical Engineering Nuclear Engineering Program ATTH:
Dale E. Klein, Director Nuclear Engineering Laboratory Austin, Texas 78712 Gentlemen:
Thank you for your. letter of April 22, 1988, in response to our letter and the attached Notice of Violation dated March 24, 1988. As a result of our review, we required clarification of portions of your response as discussed with Mr. T. L. Bauer, Assistant Director, NETL (during a telephone call on May 16, 1988).
Specifically, it is-our understanding that Item B.2 under "Corrective steps and results" refers to Docket No. 50-192 and is required because determination of rod worth is not necessary with the reactor permanently shut down.
Under
"Corrective steps to avoid future violation," Item B, it is our understanding that you_ have implemented a method to assure that the procedures place for Docket No. 50-602 have a Technical Specifications (TS) presently in reference.
It is also our understanding that you have committed to assure that for all Docket No. 50-602 TS requirements a corresponding procedure will be issued.
If your position is different from that stated, please advise us immediately.
Based on the above understandings, we find your actions to be responsive to our concerns. We will review the implementation of your corrective actions in a future inspection to determine that full compliance has been achieved and will be maintained.
Sincerely, Original Signer 1 B)
L. J. Callan L. J. Callan, Director Division of Reactor Projects cc:
(see next page)
- previcusly concurred
- RI
- C:0PS
- D:DRS
- C:PSD D:CRP k RECONCU -
GAPick:cs JEGagliardo JLMilhoan LConstable LJCallan JEGaglia o 5/ /88 5/ /88 5/ /88 5/ /88 6 / 6 /88 (v/ '{/88 8806140527 080608 PJR ADOCK 05000192~
O{
G PD" lo
. -. -....
. ~.
. ~..
= -
~
.-.
..),-,
.
University of Texas-2-University of Texas
'
College of; Engineering.
- Department of Mechanical' Engineering
. Nuclear Engineering Program.
-
ATTN: Tom L. Bauer, Supervisor Reactor Operations Nuclear Reactor Laboratories Austin, Texas 78712 Texas Radiation Control Director
~bec to DMB IE01-bec:
R. Martin.
G. Pick C:RPSB-DRSS A. Adams, NRR Project Manager DRP Lisa Shea,'RM/ALF RIV File MIS Coordinator RSTS Operator DRS
R. L. Bangart, DRSS C:FRPS
RPSB-DRSS J. Gagliardo i
'
,
l
i l
l'%-
<
-
.
.
.
.
.
.
.
..
...
..
m
.
..