ML20056C147
| ML20056C147 | |
| Person / Time | |
|---|---|
| Site: | University of Texas at Austin |
| Issue date: | 03/23/1993 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Wehring B TEXAS, UNIV. OF, AUSTIN, TX |
| References | |
| NUDOCS 9303300153 | |
| Download: ML20056C147 (6) | |
Text
a ne c,,,
_u no s ra us
~
1:
TJUCLEAR REGULATORY COMMISSiCN 2
- <;n
[ [h)2, j
- EGION IV i b M gf[5 311 RYAN PLAZA ORIVE. 5UITE 400 f
? ' '
.'J alf ARLINGTON TEXAS 76011 8064 MAR 2 3 l993 Docket:
50-602 i
1 The University of Texas at Austin ATTN: Dr. Bernard W. Wehring Reactor Administrator i
Nuclear Engineering Teaching Laboratory 10100 Burnet Rd.
The University of Texas at Austin Austin, Texas 78712 i
l
SUBJECT:
MANAGEMENT MEETING - THE UNIVERSITY OF TEXAS AT AUSTIN This is to confirm arrangements mace cetween Dr. Thomas Bauer of your staff and Blaine Murray of this office on Maren 4, 1993, to nold a meeting at the Nuclear Engineering Teaching Laboratory at 8 a.m. on April 29, 1993.
The purcose of the meeting is to provide NRC management ::ersonnel an opportunity to review ano discuss performance perspectives of licensed activities at the c
Nuclear Engineering Teacning Laboratory. We are particularly interestea in hearing about your operations, experiment, anc raciation protection programs along with future plans for tne facility.
t This meeting will also provice an 00:ortunity for you to ask any cuestions that you might have regarding the NRC inspection anc licensing programs.
Enciosure 1 is a list of NRC ::ersonnei that will 'ce attencing the meeting.
, is a proposed meeting agenoa.
We appreciate your cooperation in making arrangements for the meeting, anc we are looking forward to our visit.
If you nave any cuestions, please contact me at (817) 850-3106.
Sincerely, L. J./Cailan, Director Division of Radiation Safety and Safeguards
Enclosures:
1.
NRC Personnel 2.
Proposed Agenda 9303300153 930323 PDR ADOCK 05000602 f,
\\
P pyg 3
f The University of Texas at Austin cc w/ enclosures:
The University of Texas at Austin ATTN: Dr. Thomas Bauer Reactor Supervisor Nuclear Engineering Teaching Lab.
10100 Burnet Road Austin, Texas 78712 The University of Texas at Austin ATTN: Mr. W. Bryant Radiation Safety Officer Environmental Health and Safety Service Building, Rm. 202 Austin, Texas 78712-1024 Radiation Control Program Director Bureau of Radiation Control Dept. of Health 1100 W. 49th Street Austin, Texas 78756-3189 Office of the Governor ATTN:
Susan Rieff Director of Environmental Policy P.O. Box 12428 Austin, Texas 78711 i
(
Y The University of Texas at Austin bec to DMB (IE01) bec:
J. L. Milhoan, RA L. J. Callan, DRSS B. Murray, FIPS L. T. Ricketson, FIPS DRP DRS MIS Coordinator RIV File FIPS File Lisa Shea, RM/ALF (MS 4503)
A. Adams, NRR Project Manager (MS 11 B20)
S. Weiss, NRR, (MS 11 B20)
RIV:C:FIPSh DD:DRSS lD:DP.SS l
l l
l DDChNnberlain T JChn l
l EMurray:nh L
h /M/93
/ /93 3 M /93 l
i l
The University of Texas !
at Austin i
bec to DMB (IE01)-
bcc:
i J. L. Milhoan, RA L. J. Callan, DRSS B. Murray, FIPS
-l L. T. Ricketson, FIPS i
DRP l
DRS MIS Coordinator RIV File FIPS File Lisa Shea, RM/ALF (MS 4503)
A. Adams, NRR Project Manager (MS 11 B20)
S. Weiss, NRR, (MS 11 B20) l i
r r
- j RIV:C:FIPS!)
DD:DRSS D:DESS I
DDCh'alnberlain 8LJCkdn BMurray:nh
%/4A/93
- / / /93 3 /E7/93 f
i i
b
F ENCLOSURE I NRC PERSONNEL James L. Milhoan Regionai Administrator Nuclear Regulatory Commission Region IV Leonard J. Callan, Director Division of Radiation Safety and Safeguards Nuclear Regulatory Commission Region IV Blaine Murray, Chief Facilities Inspection Programs Section Division of Radiation Safety and Safeguarcs Larry T. Ricketson Senior Radiation Specialist Facilities Inspection Programs Section Division of Radiation Safety and Safeguards Alexancer Adams Project Manager Office of Nuclear Reactor Regulations (NRR) i I
l i
j
ENCLOSURE 2 PROPOSED AGENDA i
NUCLEAR ENGINEERING TEACHING LABORATORY (NETL)
Meetina with NRC i
April 29,1993 - 3 a.m. - 12 ;.n.
1 i
I.
INTRODUCTION AND PURPOSE OF MEETING J. L. MILHOAN l
II.
FACILITY TOUR NETL STAFF III. NETL Activities NETL STAFF Staffing i
Operations i
Experiments Raciation Protection Securi ty l
Future Activities IV.
NRC PERSPECTIVES OF NETL PERFCRMANCE
_. J. CALLAN 3
NRC INSPECTION PROGRAM
- 5. MURRAY j
VI.
NRR ACTIVITIES A. ADAMS VII. OPEN DISCUSSION / CURRENT EVENTS NRC/NETL STAFF l
VIII. CLOSING REMARKS
- . L. MILHOAN/NETL STAFF i
I i
i l
k l
4 I
l i
i i
m
-