|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20210Q7171999-08-0202 August 1999 Provides Rept of Violation of Surveillance TS TS4.2.4, Reactor Instrumentation Sys. Calorimetric Calibr of Reactor Power Instrument Channels Was Not Done in Necessary Annual Period.No Immediate Corrective Actions Necessary ML20206K7271999-05-0606 May 1999 Informs That MG Krause Will Be Reactor Supervisor & Assume Daily Supervisory Duties Previously Performed by T Bauer. T Bauer Will Continue as Assistant Director Concentrating Efforts on Extended Time Activities ML20206B1071999-04-21021 April 1999 Informs That Activities at Nuclear Engineering Teaching Lab, Continuing to Improve.Nuclear & Radiation Engineering Program Continues to Have Support from All Levels of Univ Administration - Dept,College & Institutional ML20205J2571999-03-26026 March 1999 Forwards Copy of Results of Operator Initial Exam Conducted at Univ of Texas at Austin on 990315-16.Without Encl ML20207B4341999-03-0202 March 1999 Forwards Insp Rept 50-602/98-201 on 981207-11.No Violations Noted ML20198S3041999-01-0606 January 1999 Discusses Telcon Between W Eresian & T Bauer Re Exam at Univ of Texas.Exam Scheduled During Month of Feb 1999. Rules & Guidelines That Will Be in Effect During Administration of Written Exam Encl ML20248F4661998-05-22022 May 1998 Notifies NRC That Licensee Intend to Reconstitute Committee Immediately,Rather than Wait Until Next Academic Yr ML20217M2201998-04-28028 April 1998 Forwards Replacement Page 3-13 to Univ of Tx 1997 Annual Rept.Corrections to Page Consists of Several Transcription Errors Incorrectly Categorizing Several of Tabulated Doses IR 05000602/19972011998-01-0909 January 1998 Forwards Insp Rept 50-602/97-201 on 970929-1003.No Violations Noted.Previous Level IV Violation Was Closed ML20113A1021996-06-0606 June 1996 Notifies of Change of Name of Balcones Research Ctr to Pickle Research Campus & Addition of Two Annotations for Interlock Requirements of TS W/Rcs Interlocks,Section 3.2.2, Per Conversation W/Nrc.Amended TS Pages 14 & 24 Encl ML20107K5251996-04-16016 April 1996 Forwards Response to NRC 960325 Rai,Supplementing Response Made on 951111 & Original Amend Request to Correct Lanquage in Ts.Affected TS Page Also Encl ML20094G5401995-11-11011 November 1995 Submits Response to Request for Addl Info Re NRC Ltr & Original Amend Requested .No Change to Reactor Operating Conditions Being Proposed ML20085M4361995-06-21021 June 1995 Submits Info Re Control of Access to Radiation in Beams ML20084A9671995-05-24024 May 1995 Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-602/95-01.Corrective Actions:Review of Reactor Committee Minutes Was Done by Facility Director for Period 1/92 to 4/95 ML20056C3161993-05-0404 May 1993 Forwards Proprietary Response to NRC Ltr Re Violations Noted in Insp Rept 50-602/93-01 on 930317-18.Encl Withheld,Per 10CFR2.790 ML20056C1471993-03-23023 March 1993 Confirms Arrangements Made on 930304 to Hold Meeting on 930429 to Discuss Performance Perspectives of Licensed Activities at Nuclear Engineering Teaching Lab.Proposed Meeting Agenda Encl ML20127M9821993-01-21021 January 1993 Forwards Correction to License R-129,changing Wording on Page 7-12 ML20126L0801993-01-0505 January 1993 Forwards Insp Repts 50-192/92-02 & 50-602/92-02 on 921207-11.No Violations or Deviations Noted ML20095L8181992-04-15015 April 1992 Advises That Assembly Error Made at Triga Fabrication Facility in That Two Wires on Potentiometer on CRD Mechanisms Reversed,Per 920311 Telcon ML20091Q3981992-01-23023 January 1992 Forwards Executed Amendment to Indemnity Agreement E-25 & 14 ML20085D1821991-10-0404 October 1991 Forwards Univ SAR Amend Pages for Rev 1.01 Dtd May 1991 ML20083D3691991-09-24024 September 1991 Submits Info Re Availability of Funds for Future Decommissioning of Reactor,Per 10CFR50.33 & 10CFR50.75 ML20073R0131991-05-24024 May 1991 Requests Extension of CP CPRR-123 for Four Addl Months to Provide Time for Review of NRC Questions.Current Expiration 910630.Final Response & Amended SAR Being Sent by Separate Ltr ML20073R1061991-05-24024 May 1991 Forwards Rev 1.01 to Sar,Response to NRC Questions,Per 910222 Request for Addl Info & List of Matl Subj to License Request ML20073E6891991-04-15015 April 1991 Forwards Rev 1 to PLAN-O, Call & Notification & PLAN-E, Emergency Response, QA Plan & Pages 12,20 & 21 of Emergency Response Plan ML20066J3141991-02-12012 February 1991 Forwards Rev 1 to Tech Specs.Changes Made by Discussion & Concurrence W/Nrc ML20066E2641991-01-11011 January 1991 Forwards Rev 1 to Emergency Response Plan. Annotated Copy Also Encl to Assist Review Process Due to Editorial Changes Made to Reword Sentences ML20065Q3231990-12-11011 December 1990 Informs That Extension Date Incorrectly Stated as 900630 in .Correct Extension Date Should Read 910630 ML20062H0371990-11-26026 November 1990 Submits List of Matl Required to Complete Evaluation for Issuance of OL Including Updated Emergency & Operator Requalification Plans & Final Tech Specs & Bases.Three Open Items identifed,602/8904-05,602/8904-06 & 602/9003-01 ML20065S1391990-11-21021 November 1990 Forwards Rev 0 to QA Plan ML20056B2541990-08-13013 August 1990 Forwards Rev 1 to Physical Security Plan.Encl Withheld ML20055D0401990-06-18018 June 1990 Updates Status of Items from Past Insps for Cp.Efforts to Reasonably Complete Items within Constraints of No Matl License Complete ML20043G6341990-06-0606 June 1990 Forwards Physical Security Plan.Plan Withheld ML20006E2981990-02-0909 February 1990 Forwards J Cox 891218 Ltr for Consideration & Compliance,If Possible ML20245G8181989-06-19019 June 1989 Informs of Bw Wehring Appointment as Director of Nuclear Engineering Teaching Lab at Univ of Texas,At Austin,Per License R-92,Tech Spec 6.2c3 & 6.2.2a.Curriculum Vitae of Wehring Encl ML20235Y3541989-02-24024 February 1989 Forwards Order Extending Const Completion Date of Triga Mark II Reactor to 891231,safety Evaluation & Environ Assessment & Finding of No Significant Impact,Per 881017 Request ML20204G2111988-10-17017 October 1988 Forwards Insp Rept 50-602/88-05 on 880922-23.No Violations or Deviations Noted ML20206E5261988-10-17017 October 1988 Requests Extension of Final Completion Date by 4 Months to 890430 for CP CPRR-123.Termination of General Contractor of Record Effective 881013 Requires Assumption of Project Responsibility by Continental Insurance Co IR 05000192/19880021988-09-0202 September 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-192/88-02 & 50-602/88-02 IR 05000192/19880011988-06-0808 June 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-192/88-01 & 50-602/88-01.Based on Listed Understanding of Util Response, Per 880516 Telcon,Actions Responsive to NRC Concerns ML20150F3181988-04-22022 April 1988 Responds to NRC Re Violations Noted in Insp Rept on 880324.Corrective Actions:Immediate Check of Review Dates on All Procedures & List Made of All Mods of Any Type ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager ML20236Q9571987-11-0606 November 1987 Advises That NETL Project Progress Continues W/Projected Completion Date of 880610.Present Figures Indicate 46% Completion by mid-Oct.Key Items & Date Estimates Listed ML20236F7581987-10-26026 October 1987 Informs That Effective 871025,JL Pellet Will Replace R Cooley as Section Chief of Operator Licensing Section in Div of Reactor Safety ML20212E3451987-02-20020 February 1987 Advises of Correction to Project Completion Date Noted in .Completion Date in Sentence Two Corrected to June 1988 ML20211B3191987-02-0606 February 1987 Informs That Bids for Docket 50-602 Project Opened on 861021 W/Award of General Contract on 861204.Dismantling Activities of Docket 50-192 License Projected to Commense in Aug or Sept 1988.Submits Info to Suppl 850503 Decommissioning Plan ML20207N0351986-12-0808 December 1986 Forwards Notice of 861215 Preconstruction Conference in Austin,Tx to Discuss Const Schedule Available from Cit,Inc of Texas.Set of Plans & Specs Should Be Sent by 851208 from Ws Martin ML20203C0911986-07-10010 July 1986 Informs That Bid Advertisement for Completion of Docket 50-602 & Dismantling of Docket 50-192 Scheduled for 860817 W/Bid Openings Planned for 860916 ML20210Q1481986-05-0606 May 1986 Forwards Evaluation of 841217 & 850814 Physical Security Plans.Plans Satisfy Physical Protection Requirements of 10CFR73.67(f) & Acceptable ML20140F3181986-03-26026 March 1986 Advises of NRR Reorganization.Telephone Number of J Dosa Changed.D Tondi New Section Leader for Nonpower Reactors & Safeguards Licensing Section.Correspondence Should Be Addressed to Nrc,Attention Document Control Desk 1999-08-02
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20205J2571999-03-26026 March 1999 Forwards Copy of Results of Operator Initial Exam Conducted at Univ of Texas at Austin on 990315-16.Without Encl ML20207B4341999-03-0202 March 1999 Forwards Insp Rept 50-602/98-201 on 981207-11.No Violations Noted ML20198S3041999-01-0606 January 1999 Discusses Telcon Between W Eresian & T Bauer Re Exam at Univ of Texas.Exam Scheduled During Month of Feb 1999. Rules & Guidelines That Will Be in Effect During Administration of Written Exam Encl IR 05000602/19972011998-01-0909 January 1998 Forwards Insp Rept 50-602/97-201 on 970929-1003.No Violations Noted.Previous Level IV Violation Was Closed ML20056C1471993-03-23023 March 1993 Confirms Arrangements Made on 930304 to Hold Meeting on 930429 to Discuss Performance Perspectives of Licensed Activities at Nuclear Engineering Teaching Lab.Proposed Meeting Agenda Encl ML20127M9821993-01-21021 January 1993 Forwards Correction to License R-129,changing Wording on Page 7-12 ML20126L0801993-01-0505 January 1993 Forwards Insp Repts 50-192/92-02 & 50-602/92-02 on 921207-11.No Violations or Deviations Noted ML20062H0371990-11-26026 November 1990 Submits List of Matl Required to Complete Evaluation for Issuance of OL Including Updated Emergency & Operator Requalification Plans & Final Tech Specs & Bases.Three Open Items identifed,602/8904-05,602/8904-06 & 602/9003-01 ML20235Y3541989-02-24024 February 1989 Forwards Order Extending Const Completion Date of Triga Mark II Reactor to 891231,safety Evaluation & Environ Assessment & Finding of No Significant Impact,Per 881017 Request ML20204G2111988-10-17017 October 1988 Forwards Insp Rept 50-602/88-05 on 880922-23.No Violations or Deviations Noted IR 05000192/19880021988-09-0202 September 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-192/88-02 & 50-602/88-02 IR 05000192/19880011988-06-0808 June 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-192/88-01 & 50-602/88-01.Based on Listed Understanding of Util Response, Per 880516 Telcon,Actions Responsive to NRC Concerns ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager ML20236F7581987-10-26026 October 1987 Informs That Effective 871025,JL Pellet Will Replace R Cooley as Section Chief of Operator Licensing Section in Div of Reactor Safety ML20210Q1481986-05-0606 May 1986 Forwards Evaluation of 841217 & 850814 Physical Security Plans.Plans Satisfy Physical Protection Requirements of 10CFR73.67(f) & Acceptable ML20140F3181986-03-26026 March 1986 Advises of NRR Reorganization.Telephone Number of J Dosa Changed.D Tondi New Section Leader for Nonpower Reactors & Safeguards Licensing Section.Correspondence Should Be Addressed to Nrc,Attention Document Control Desk ML20132E1191985-07-24024 July 1985 Forwards Univ of Texas CP Application & Environ Assessment, in Response to 850709 Request.W/O Encl ML20126M8871985-05-24024 May 1985 Corrected Notification That Financial Info Submitted on 841109 W/Application for CP Reviewed.Info Demonstrates That Facility Can Obtain Funds Necessary to Cover Estimated Const,Fuel Cycle,Operating & Decommissioning Costs 1999-03-26
[Table view] |
See also: IR 05000602/1998201
Text
.
'
Dr. Bern rd W. Wehring March 2, 1999.. '
P Reactor Administrator
'
The University of Texas
at Austin
-Pickle Research Campus, Building 159
Mail Code R9000
Austin, Texas 78712-1024
SUBJECT: NRC INSPECTION REPORT NO. 50 602/98 201
9
Dear Dr. Wehring:
On December 7-11,1998, the United States Nuclear Regulatory Commission (NRC)
conducted an announced inspection of the University of Texas Mark-ll Reactor. The
enclosed report presents the results of that inspection.
Various aspects of your reactor operations, maintenance, engineering programs and
security were inspected, including selective examinations of procedures and representative
records, interviews with personnel, and observation of the facility. Additionally, your -
actions in response to an instrumented fuel element leak were evaluated. No
noncompliances or significant issues were identified. No response to this letter is
required,
in accordance with 10 CFR 2.790 cf the NRC's " Rules of Practice," a copy of this letter
and its enclosure will be placed in the NRC Public Document Room.
,
Your cooperation is appreciated. Should you have any questions concerning this
inspection, please contact us.
Sincerely,
Marvin M. Mendonca for:
9903080114 990302 Seymour H. Weiss, Director
,
PDR ADOCK 05000602 Non-Power Reactors and Decommissioning
C PDR Project Directorate
'
Division of Regulatory Improvement Programs
Office of Nuclear Reactor Regulation
Docket No. 50-602
License No. R-129
Enclosure: NRC Inspection Report No. 50-602/98-201
cc w/ enclosure: See next page
pg Q % h kh
DISTRIBUTION:
HARD COPY ~
E-Mall
flDocket File 50-8027 DMatthews TMichaels WEresian s
PUBLIC SWeiss TBurdick Pisaac
PDND r/f EHylton PDoyle TDragon \,{
SHolmes MMendonca DOCDESK CBassett \
GTracy (016-E15) AAdams
BDavis (Form only - 05 A2)
g gg\
P 1 PD P
S es '
h9[9 3/#9
3. e699 OFFICIAL RECORD COPY'}r&I99
DOCUMENT : S CY\ HOLMES \lR-50602
. __
n
.
'
,
Dr. Bernard W. Wehring March 2, 1999
Reactor Administrator
The University of Texas
at Austin
Pickle Research Campus, Building 159
Mail Code R9000
Austin, Texas 78712-1024
i SUBJECT: NRC INSPECTION REPORT NO. 50-602/98-201
I
I Dear Dr. Wehring:
On December 711,1998, the United States Nuclear Regulatory Comrnission (NRC) '
- onducted an announced inspection of the University of Texas Mark-Il Reactor. The
enclosed report presents the asults of that inspectioi.
Various aspects of your reactor operations. maintenance, engineering programs and
security were inspected, including selective examinations of procedures and representative j
records, interviews with personnel, and observation of the facility. Additionally, your ;
actions in response to an instrumented fuel element leak were evaluated. No
noncompliances or significant issues were identified. No response to this letter is
required.
I
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosure will be placed in the NRC Public Document Room. 1
Your cooperation is appreciated. Should you have any questions concerning this j
inspection, please contact us. 1
Sincerely,
Marvin M. Mendonca for:
Seymour H. Weiss, Director
Non Power Reactors and Decommissioning
Project Directorate
Division of Regulatory Improvement Programs
Office of Nuclear Reactor Regulation
Docket No. 50-602
License No. R-129
Enclosure: NRC Inspection Repert No. 50-602/98-201
cc w/ enclosure: See next page
DISTRIBUTION:
HARD COPY E-MAIL
Docket File 50-602 DMatthews TMichac!s WEresian
PUBLIC SWeiss TBurdick Pisaac
PDND r/f EHylton PDoyle TDragon
SHolmes MMendonca DOCDESK CBassett
GTracy (016-E15) AAdams
BDavis (Form only - 05 A2)
W
P l PD ,
P PDND:D
A Hylton SWeiss
). /99 99 } @g759 J / M99
OFFICIAL RECORD COPY }
DOCUMENT NAME: G:\SECY\HOLMCS\lR-50602
.. .. . .. .
- _ _ _ _ _ _ _ _ - _ - _ - _ _ _ _ _ _ - _ _ __ _ - _ _ _ _ . . .. .
. ..
. _ _
.. .. .. ..
. _. . . ,
(_________
.
.
.
.. .. . .. .. .. . .. ..
I
(
.-
4
.
, gS u%,
- JS UNITED STATES
[ j
TJCLEAR REGULATORY COMMISSION
WASHINGTON. D.C. 2006H001
'% ***,* # March 2, 1999
Dr. Bernard W. Wehring
Reactor Administrator
The University of Texas
at Austin
Pickle Research Campus, Building 159
Mail Code R9000
Austin, Texas 78712 1024 i
SUBJECT: NRC INSPECTION REPORT NO. 50-602/98 201
Dear Dr Wehring:
On December 7-11,1998, the United States Nuclear Regulatory Commission (NRC)
conducted an announced inspection of the University of Texas Mark-Il Reactor. The
enclosed report presents the results of that inspection.
Various aspects of your reactor operations, maintenance, engineering programs and
security were inspected, including selective examinations of procedures and representative -
records, interviews with personnel, and observation of the facility. Additionally, your
actions in response to an instrumented fuel element leak were evaluated. No
noncompliances or significant issues were identified. No response to this letter is
required,
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosure will be placed in the NRC Public Document Room.
Your cooperation is appreciated. Should you have any questions concerning this
inspection, please contact us.
Sincerely, j
l
N N , / c~- -
l
Seymour H. Weiss, Director j
-Non-Power Reactors and Decommissioning q
Project Directorate !
Division of Regulatory improvement Programs
Office of Nuclear Reactor Regulation
Docket No. 50-602
License No. R-129
Enclosure: NRC Inspection Report No. 50-602/98-201
cc w/ enclosure: See next page
_ _ _ - _ - _ _ - _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ - - - _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ - _ _ _ _ - _ _ _ - - _ _ _ _ .
l
. l
\
'. ;
)
'
University of Texas Docket No. 50-602
(INSPECTION REPORT) I
1
l
cc: l
I
Dr. Thomas L. Bauer
Reactor Supervisor
The University of Texas at Austin i
Pickle Research Campus, Building 159
Mail Code R9000 )
Austin, Texas 78712-1024
]
Mr. John C. White l
Radiation Safety Officer )
The University of Texas at Austin
Pickle Research Campus, Building 159 .
Mail Code C2600 l
Austin, Texas 78712-1024
Radiation Control Program Director
Bureau of Radiation Control
Texas Department of Health j
1100 W. 49th Street i
Austin, Texas 78756-3189
Dr. William G. Vernetson
Director of Nuclear Facilities
Department of Nuclear Engineering Sciences
University of Florida
202 Nuclear Sciences Center
Gainesville, FL 32611
!
1
l
l
--
_ _ _ _ _ _ _ _ _ _ _ _ _ _