Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-192/88-02 & 50-602/88-02
ML20154A546
Person / Time
Site: 05000192, University of Texas at Austin
Issue date: 09/02/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Klein D
TEXAS, UNIV. OF, AUSTIN, TX
References
NUDOCS 8809130006
Download: ML20154A546 (2)


Text

. . - _ _ _- . .- .

-

os SEP 2m

- 4 ,  !

In Reply Refer To:

Dockets: 50-192/88-02 -

50-602/88-02 [

'

University of Texas College of Engineering Department of Mechanical Engineering 1 Nuclear Engineering Program j

,

'

ATTN: Dale E. Klein, Director Nuclear Engineering Laboratory Austin, Texas 78712

, Gentlemen:

,

Thank you for your lettee of June 24, 1988, in response to our letter of a

April 28, 1988. We have reviewed your reply and also held a conference  ;

] telephone call on August 17, 1988, between you and Mr. T. Bauer of your ,

'

organization and Messrs. B. Murray, W. Seidle, and H. Chaney of this office to ,

j clarify your anticipated schedule of events for the defueling of the TRIGA  !

,

Mark I reactor and startup of the TRIGA Mark II reactor. As we discussed i

> during the August 17, 1988, telephone call, one of our main concerns is your [

development of written procedures associated with the defueling and transfer of ,

fuel for the Mark I reactor, and the startup and operation of the Mark II  !

] reactor. You informed us that the addition of a professional health physicist ,

j to your staff did not materialize as you anticipated and the date for filling '

this position is unknown. Also, you informed us that current problems in 1 obtaining a shipping cask for the TRIGA fuel and construction activities may cause a significant schedule slippage in all sross.

i During the conference call, it was agreed Mr. Seidle would be the NRC Region IV '

point of contac Furthermore, you agreed to inform Mr. Seidle of any changes j in the schedule of activities referenced in NRC Inspection Report 50-602/88-04.

! I j If you have any questions, I. lease contact u <

l i j

Sincerely, j

. Origtsal Signed By i L J. Callan -

L. J. Callan, Director  !

l Division of Reactor Projects (

'

>

] cc: (see next page) l j  !

4  :

'

W i RIV:FRPS:RP C:FRPS:RP C:RPB C:TPS:DRS D:DRS I C: P D:0R h i i H Chaney/jt R Bser EHurray WC$eidle JLMilhoan EJH .ler LJCa ll'an" !

30/88 /p/88 / /88 'l/ I /88 f / / /88 88

'[ / g/88 l

! 0809130006 880902 PDR /, p k . ;

I i

O ADOCK 05000192 .

f.

PDC g '!
-

i

-

.' . 4 University of Texas -2-University of Texas College of Engineering Department of Mechanical Engineering Nuclear Engineering Program ATTN: Tom L. Bauer, Supervis)r Reactor Operations Nuclear Reactor Laooratories Austin, Texas 78712 Texas Radiation Control Director bec to DMB (IE-01)

bec distrib. by RIV:

R. D. Martin, RA RPD-DRSS Section Chief DRP/D Lisa Shea, RM/ALF RIV File DRP DRS MIS System RSTS Operator Inspector Section Chief B. Murray R. L. Bangart R. E. Hall Project Engineer, DRP/D A. Adams, NRR Project Manager W. C. Seidle

.