MONTHYEARML20210Q7171999-08-0202 August 1999 Provides Rept of Violation of Surveillance TS TS4.2.4, Reactor Instrumentation Sys. Calorimetric Calibr of Reactor Power Instrument Channels Was Not Done in Necessary Annual Period.No Immediate Corrective Actions Necessary ML20206K7271999-05-0606 May 1999 Informs That MG Krause Will Be Reactor Supervisor & Assume Daily Supervisory Duties Previously Performed by T Bauer. T Bauer Will Continue as Assistant Director Concentrating Efforts on Extended Time Activities ML20206B1071999-04-21021 April 1999 Informs That Activities at Nuclear Engineering Teaching Lab, Continuing to Improve.Nuclear & Radiation Engineering Program Continues to Have Support from All Levels of Univ Administration - Dept,College & Institutional ML20205J2571999-03-26026 March 1999 Forwards Copy of Results of Operator Initial Exam Conducted at Univ of Texas at Austin on 990315-16.Without Encl ML20207B4341999-03-0202 March 1999 Forwards Insp Rept 50-602/98-201 on 981207-11.No Violations Noted ML20198S3041999-01-0606 January 1999 Discusses Telcon Between W Eresian & T Bauer Re Exam at Univ of Texas.Exam Scheduled During Month of Feb 1999. Rules & Guidelines That Will Be in Effect During Administration of Written Exam Encl ML20248F4661998-05-22022 May 1998 Notifies NRC That Licensee Intend to Reconstitute Committee Immediately,Rather than Wait Until Next Academic Yr ML20217M2201998-04-28028 April 1998 Forwards Replacement Page 3-13 to Univ of Tx 1997 Annual Rept.Corrections to Page Consists of Several Transcription Errors Incorrectly Categorizing Several of Tabulated Doses IR 05000602/19972011998-01-0909 January 1998 Forwards Insp Rept 50-602/97-201 on 970929-1003.No Violations Noted.Previous Level IV Violation Was Closed ML20113A1021996-06-0606 June 1996 Notifies of Change of Name of Balcones Research Ctr to Pickle Research Campus & Addition of Two Annotations for Interlock Requirements of TS W/Rcs Interlocks,Section 3.2.2, Per Conversation W/Nrc.Amended TS Pages 14 & 24 Encl ML20107K5251996-04-16016 April 1996 Forwards Response to NRC 960325 Rai,Supplementing Response Made on 951111 & Original Amend Request to Correct Lanquage in Ts.Affected TS Page Also Encl ML20094G5401995-11-11011 November 1995 Submits Response to Request for Addl Info Re NRC Ltr & Original Amend Requested .No Change to Reactor Operating Conditions Being Proposed ML20085M4361995-06-21021 June 1995 Submits Info Re Control of Access to Radiation in Beams ML20084A9671995-05-24024 May 1995 Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-602/95-01.Corrective Actions:Review of Reactor Committee Minutes Was Done by Facility Director for Period 1/92 to 4/95 ML20057F8301993-10-13013 October 1993 Forwards Order Terminating License R-92 for Triga Mark I Research Reactor,Per 850503 Application.Amend 15 to Indemnity Agreement E-25 Encl for Signature ML20056H4331993-07-21021 July 1993 Forwards Final Rept of Confirmatory Survey of Univ of Texas Triga Reactor.Informs That Minor Rev Made to Draft Rept Issued in June 1993 to Reflect Comments Communicated by Telephone ML20056C3161993-05-0404 May 1993 Forwards Proprietary Response to NRC Ltr Re Violations Noted in Insp Rept 50-602/93-01 on 930317-18.Encl Withheld,Per 10CFR2.790 ML20056C1471993-03-23023 March 1993 Confirms Arrangements Made on 930304 to Hold Meeting on 930429 to Discuss Performance Perspectives of Licensed Activities at Nuclear Engineering Teaching Lab.Proposed Meeting Agenda Encl ML20127M9821993-01-21021 January 1993 Forwards Correction to License R-129,changing Wording on Page 7-12 ML20126L0801993-01-0505 January 1993 Forwards Insp Repts 50-192/92-02 & 50-602/92-02 on 921207-11.No Violations or Deviations Noted ML20095L8181992-04-15015 April 1992 Advises That Assembly Error Made at Triga Fabrication Facility in That Two Wires on Potentiometer on CRD Mechanisms Reversed,Per 920311 Telcon ML20091Q3981992-01-23023 January 1992 Forwards Executed Amendment to Indemnity Agreement E-25 & 14 ML20085D1821991-10-0404 October 1991 Forwards Univ SAR Amend Pages for Rev 1.01 Dtd May 1991 ML20083D3691991-09-24024 September 1991 Submits Info Re Availability of Funds for Future Decommissioning of Reactor,Per 10CFR50.33 & 10CFR50.75 ML20073R1061991-05-24024 May 1991 Forwards Rev 1.01 to Sar,Response to NRC Questions,Per 910222 Request for Addl Info & List of Matl Subj to License Request ML20073R0131991-05-24024 May 1991 Requests Extension of CP CPRR-123 for Four Addl Months to Provide Time for Review of NRC Questions.Current Expiration 910630.Final Response & Amended SAR Being Sent by Separate Ltr ML20073E6891991-04-15015 April 1991 Forwards Rev 1 to PLAN-O, Call & Notification & PLAN-E, Emergency Response, QA Plan & Pages 12,20 & 21 of Emergency Response Plan ML20066J3141991-02-12012 February 1991 Forwards Rev 1 to Tech Specs.Changes Made by Discussion & Concurrence W/Nrc ML20066E2641991-01-11011 January 1991 Forwards Rev 1 to Emergency Response Plan. Annotated Copy Also Encl to Assist Review Process Due to Editorial Changes Made to Reword Sentences ML20065Q3231990-12-11011 December 1990 Informs That Extension Date Incorrectly Stated as 900630 in .Correct Extension Date Should Read 910630 ML20062H0371990-11-26026 November 1990 Submits List of Matl Required to Complete Evaluation for Issuance of OL Including Updated Emergency & Operator Requalification Plans & Final Tech Specs & Bases.Three Open Items identifed,602/8904-05,602/8904-06 & 602/9003-01 ML20065S1391990-11-21021 November 1990 Forwards Rev 0 to QA Plan IR 05000192/19900011990-10-0101 October 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-192/90-01 ML20065D0071990-09-10010 September 1990 Responds to Violations Noted in Insp Rept 50-192/90-01 on 900806.Corrective Actions:Personnel Access to Area Limited to Personnel W/Direct Knowledge of Status of Facility & Routine Work W/Radioactive Matl Removed from Area ML20056B2541990-08-13013 August 1990 Forwards Rev 1 to Physical Security Plan.Encl Withheld ML20056A8701990-08-0606 August 1990 Forwards Insp Rept 50-192/90-01 on 900625-28 & Notice of Violation.Encls Withheld (Ref 10CFR2.790(d)) ML20055D0401990-06-18018 June 1990 Updates Status of Items from Past Insps for Cp.Efforts to Reasonably Complete Items within Constraints of No Matl License Complete ML20043G6341990-06-0606 June 1990 Forwards Physical Security Plan.Plan Withheld ML20006E2981990-02-0909 February 1990 Forwards J Cox 891218 Ltr for Consideration & Compliance,If Possible ML20245G8181989-06-19019 June 1989 Informs of Bw Wehring Appointment as Director of Nuclear Engineering Teaching Lab at Univ of Texas,At Austin,Per License R-92,Tech Spec 6.2c3 & 6.2.2a.Curriculum Vitae of Wehring Encl ML20245J5851989-04-24024 April 1989 Forwards Addendum to 1988 Annual Rept ML20245D3281989-04-21021 April 1989 Forwards Amend 11 to License R-92 & Safety Evaluation. Amend Allows Postponing Certain Surveillance Requirements If Reactor Not Operable & Changes Definition of Reactor Secure ML20236C4461989-03-0808 March 1989 Responds to NRC Re 880801 Application for Amend to License R-92.Licensee Does Not Plan to Complete Postponed Surveillances to Make Facility Operable Prior to Movement of Fuel ML20235Y3541989-02-24024 February 1989 Forwards Order Extending Const Completion Date of Triga Mark II Reactor to 891231,safety Evaluation & Environ Assessment & Finding of No Significant Impact,Per 881017 Request ML20206E5261988-10-17017 October 1988 Requests Extension of Final Completion Date by 4 Months to 890430 for CP CPRR-123.Termination of General Contractor of Record Effective 881013 Requires Assumption of Project Responsibility by Continental Insurance Co ML20204G2111988-10-17017 October 1988 Forwards Insp Rept 50-602/88-05 on 880922-23.No Violations or Deviations Noted ML20206F0661988-09-13013 September 1988 Forwards Info to Suppl 880801 Amend Request for Change to License R-92 Tech Specs IR 05000192/19880021988-09-0202 September 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-192/88-02 & 50-602/88-02 ML20151U6211988-08-15015 August 1988 Forwards Request for Addl Info Re 880801 Application for Amend to License R-92.Detailed Discussion of Which Tech Specs Should Be Amended & Wording of Tech Specs Requested ML20195D4921988-06-17017 June 1988 Confirms Telcon Arrangements for Administration of Operator Licensing Exams at Facility During Wk of 880912.Mtg Requested to Furnish Approved Ref Matl Listed in Encl Before 880711 Deadline 1999-08-02
[Table view] Category:NRC TO EDUCATIONAL INSTITUTION
MONTHYEARIR 05000192/19900011990-10-0101 October 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-192/90-01 ML20056A8701990-08-0606 August 1990 Forwards Insp Rept 50-192/90-01 on 900625-28 & Notice of Violation.Encls Withheld (Ref 10CFR2.790(d)) ML20235Y3541989-02-24024 February 1989 Forwards Order Extending Const Completion Date of Triga Mark II Reactor to 891231,safety Evaluation & Environ Assessment & Finding of No Significant Impact,Per 881017 Request ML20204G2111988-10-17017 October 1988 Forwards Insp Rept 50-602/88-05 on 880922-23.No Violations or Deviations Noted IR 05000192/19880021988-09-0202 September 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-192/88-02 & 50-602/88-02 ML20195D4921988-06-17017 June 1988 Confirms Telcon Arrangements for Administration of Operator Licensing Exams at Facility During Wk of 880912.Mtg Requested to Furnish Approved Ref Matl Listed in Encl Before 880711 Deadline IR 05000192/19880011988-06-0808 June 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-192/88-01 & 50-602/88-01.Based on Listed Understanding of Util Response, Per 880516 Telcon,Actions Responsive to NRC Concerns ML20207S0781987-03-0909 March 1987 Forwards Order Authorizing Dismantling of Facility & Disposition of Component Parts for License R-92,finding of No Significant Environ Impact,Safety Evaluation & Environ Assessment ML20210Q1481986-05-0606 May 1986 Forwards Evaluation of 841217 & 850814 Physical Security Plans.Plans Satisfy Physical Protection Requirements of 10CFR73.67(f) & Acceptable ML20210H8901986-03-27027 March 1986 Lists Change in Telephone Number for H Bernard,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20140F3181986-03-26026 March 1986 Advises of NRR Reorganization.Telephone Number of J Dosa Changed.D Tondi New Section Leader for Nonpower Reactors & Safeguards Licensing Section.Correspondence Should Be Addressed to Nrc,Attention Document Control Desk ML20133N8591985-08-0909 August 1985 Forwards Request for Addl Info Re 850503 Decommissioning Plan.Response Requested by 850909 ML20129A4441985-05-24024 May 1985 Notifies That Financial Info Submitted on 841109 W/ Application for CP Demonstrates Reasonable Assurance That Funds Necessary to Cover Estimated Const Costs Can Be Obtained ML20129A6871985-05-24024 May 1985 Forwards Notice of Proposed Issuance of Orders Authorizing Disposition of Component Parts & Terminating License R-92 Per 850503 Application ML20126M8871985-05-24024 May 1985 Corrected Notification That Financial Info Submitted on 841109 W/Application for CP Reviewed.Info Demonstrates That Facility Can Obtain Funds Necessary to Cover Estimated Const,Fuel Cycle,Operating & Decommissioning Costs ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML20148U1931981-02-17017 February 1981 Forwards Revised NRC Region 4 Organization Chart,Effective 810227 ML20062H2391979-05-11011 May 1979 Forwards IE Info Notice 79-12, Attempted Damage to New Fuel Assemblies ML20137G4721971-06-23023 June 1971 Advises That Presence & Irradiation of Explosives in Reactor Must Be Evaluated Due to Potential for Damage to Reactor. Evaluation Requested Establishing Operating Restrictions,Max Quantity of Explosives Allowed in Facility & Form 1990-08-06
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20205J2571999-03-26026 March 1999 Forwards Copy of Results of Operator Initial Exam Conducted at Univ of Texas at Austin on 990315-16.Without Encl ML20207B4341999-03-0202 March 1999 Forwards Insp Rept 50-602/98-201 on 981207-11.No Violations Noted ML20198S3041999-01-0606 January 1999 Discusses Telcon Between W Eresian & T Bauer Re Exam at Univ of Texas.Exam Scheduled During Month of Feb 1999. Rules & Guidelines That Will Be in Effect During Administration of Written Exam Encl IR 05000602/19972011998-01-0909 January 1998 Forwards Insp Rept 50-602/97-201 on 970929-1003.No Violations Noted.Previous Level IV Violation Was Closed ML20057F8301993-10-13013 October 1993 Forwards Order Terminating License R-92 for Triga Mark I Research Reactor,Per 850503 Application.Amend 15 to Indemnity Agreement E-25 Encl for Signature ML20056C1471993-03-23023 March 1993 Confirms Arrangements Made on 930304 to Hold Meeting on 930429 to Discuss Performance Perspectives of Licensed Activities at Nuclear Engineering Teaching Lab.Proposed Meeting Agenda Encl ML20127M9821993-01-21021 January 1993 Forwards Correction to License R-129,changing Wording on Page 7-12 ML20126L0801993-01-0505 January 1993 Forwards Insp Repts 50-192/92-02 & 50-602/92-02 on 921207-11.No Violations or Deviations Noted ML20062H0371990-11-26026 November 1990 Submits List of Matl Required to Complete Evaluation for Issuance of OL Including Updated Emergency & Operator Requalification Plans & Final Tech Specs & Bases.Three Open Items identifed,602/8904-05,602/8904-06 & 602/9003-01 IR 05000192/19900011990-10-0101 October 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-192/90-01 ML20056A8701990-08-0606 August 1990 Forwards Insp Rept 50-192/90-01 on 900625-28 & Notice of Violation.Encls Withheld (Ref 10CFR2.790(d)) ML20245D3281989-04-21021 April 1989 Forwards Amend 11 to License R-92 & Safety Evaluation. Amend Allows Postponing Certain Surveillance Requirements If Reactor Not Operable & Changes Definition of Reactor Secure ML20235Y3541989-02-24024 February 1989 Forwards Order Extending Const Completion Date of Triga Mark II Reactor to 891231,safety Evaluation & Environ Assessment & Finding of No Significant Impact,Per 881017 Request ML20204G2111988-10-17017 October 1988 Forwards Insp Rept 50-602/88-05 on 880922-23.No Violations or Deviations Noted IR 05000192/19880021988-09-0202 September 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-192/88-02 & 50-602/88-02 ML20151U6211988-08-15015 August 1988 Forwards Request for Addl Info Re 880801 Application for Amend to License R-92.Detailed Discussion of Which Tech Specs Should Be Amended & Wording of Tech Specs Requested ML20195D4921988-06-17017 June 1988 Confirms Telcon Arrangements for Administration of Operator Licensing Exams at Facility During Wk of 880912.Mtg Requested to Furnish Approved Ref Matl Listed in Encl Before 880711 Deadline IR 05000192/19880011988-06-0808 June 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-192/88-01 & 50-602/88-01.Based on Listed Understanding of Util Response, Per 880516 Telcon,Actions Responsive to NRC Concerns ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager ML20236F7581987-10-26026 October 1987 Informs That Effective 871025,JL Pellet Will Replace R Cooley as Section Chief of Operator Licensing Section in Div of Reactor Safety ML20207S0781987-03-0909 March 1987 Forwards Order Authorizing Dismantling of Facility & Disposition of Component Parts for License R-92,finding of No Significant Environ Impact,Safety Evaluation & Environ Assessment ML20210Q1481986-05-0606 May 1986 Forwards Evaluation of 841217 & 850814 Physical Security Plans.Plans Satisfy Physical Protection Requirements of 10CFR73.67(f) & Acceptable ML20210H8901986-03-27027 March 1986 Lists Change in Telephone Number for H Bernard,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20140F3181986-03-26026 March 1986 Advises of NRR Reorganization.Telephone Number of J Dosa Changed.D Tondi New Section Leader for Nonpower Reactors & Safeguards Licensing Section.Correspondence Should Be Addressed to Nrc,Attention Document Control Desk ML20133N8591985-08-0909 August 1985 Forwards Request for Addl Info Re 850503 Decommissioning Plan.Response Requested by 850909 ML20132E1191985-07-24024 July 1985 Forwards Univ of Texas CP Application & Environ Assessment, in Response to 850709 Request.W/O Encl ML20126M8871985-05-24024 May 1985 Corrected Notification That Financial Info Submitted on 841109 W/Application for CP Reviewed.Info Demonstrates That Facility Can Obtain Funds Necessary to Cover Estimated Const,Fuel Cycle,Operating & Decommissioning Costs ML20129A4441985-05-24024 May 1985 Notifies That Financial Info Submitted on 841109 W/ Application for CP Demonstrates Reasonable Assurance That Funds Necessary to Cover Estimated Const Costs Can Be Obtained ML20129A6871985-05-24024 May 1985 Forwards Notice of Proposed Issuance of Orders Authorizing Disposition of Component Parts & Terminating License R-92 Per 850503 Application ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML20148U1931981-02-17017 February 1981 Forwards Revised NRC Region 4 Organization Chart,Effective 810227 ML20149K1911980-05-0707 May 1980 Generic Ltr 80-38 to All Nonpower Reactor Licensees Re NPR Physical Protection Requirements.Summary of Certain NPR Physical Protection Requirements Encl & Should Aid in Determining Safeguards Requirements Applicable to Facility ML20062H2391979-05-11011 May 1979 Forwards IE Info Notice 79-12, Attempted Damage to New Fuel Assemblies ML20137G4721971-06-23023 June 1971 Advises That Presence & Irradiation of Explosives in Reactor Must Be Evaluated Due to Potential for Damage to Reactor. Evaluation Requested Establishing Operating Restrictions,Max Quantity of Explosives Allowed in Facility & Form 1999-03-26
[Table view] |
Inspection Report - - 1988002 |
---|
|
|
Text
. . - _ _ _- . .- .
-
os SEP 2m
- 4 , !
In Reply Refer To:
Dockets: 50-192/88-02 -
50-602/88-02 [
'
University of Texas College of Engineering Department of Mechanical Engineering 1 Nuclear Engineering Program j
,
'
ATTN: Dale E. Klein, Director Nuclear Engineering Laboratory Austin, Texas 78712
, Gentlemen:
,
Thank you for your lettee of June 24, 1988, in response to our letter of a
April 28, 1988. We have reviewed your reply and also held a conference ;
] telephone call on August 17, 1988, between you and Mr. T. Bauer of your ,
'
organization and Messrs. B. Murray, W. Seidle, and H. Chaney of this office to ,
j clarify your anticipated schedule of events for the defueling of the TRIGA !
,
Mark I reactor and startup of the TRIGA Mark II reactor. As we discussed i
> during the August 17, 1988, telephone call, one of our main concerns is your [
development of written procedures associated with the defueling and transfer of ,
fuel for the Mark I reactor, and the startup and operation of the Mark II !
] reactor. You informed us that the addition of a professional health physicist ,
j to your staff did not materialize as you anticipated and the date for filling '
- this position is unknown. Also, you informed us that current problems in 1 obtaining a shipping cask for the TRIGA fuel and construction activities may cause a significant schedule slippage in all sross.
i During the conference call, it was agreed Mr. Seidle would be the NRC Region IV '
- point of contac Furthermore, you agreed to inform Mr. Seidle of any changes j in the schedule of activities referenced in NRC Inspection Report 50-602/88-04.
! I j If you have any questions, I. lease contact u <
l i j
Sincerely, j
. Origtsal Signed By i L J. Callan -
L. J. Callan, Director !
l Division of Reactor Projects (
- '
>
] cc: (see next page) l j !
4 :
'
W i RIV:FRPS:RP C:FRPS:RP C:RPB C:TPS:DRS D:DRS I C: P D:0R h i i H Chaney/jt R Bser EHurray WC$eidle JLMilhoan EJH .ler LJCa ll'an" !
30/88 /p/88 / /88 'l/ I /88 f / / /88 88
'[ / g/88 l
! 0809130006 880902 PDR /, p k . ;
I i
O ADOCK 05000192 .
f.
- PDC g '!
- -
i
-
.' . 4 University of Texas -2-University of Texas College of Engineering Department of Mechanical Engineering Nuclear Engineering Program ATTN: Tom L. Bauer, Supervis)r Reactor Operations Nuclear Reactor Laooratories Austin, Texas 78712 Texas Radiation Control Director bec to DMB (IE-01)
bec distrib. by RIV:
R. D. Martin, RA RPD-DRSS Section Chief DRP/D Lisa Shea, RM/ALF RIV File DRP DRS MIS System RSTS Operator Inspector Section Chief B. Murray R. L. Bangart R. E. Hall Project Engineer, DRP/D A. Adams, NRR Project Manager W. C. Seidle
.