ML20214R853

From kanterella
Revision as of 12:01, 4 May 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Discovery Rept 2 Requesting Answers to Listed Questions for Each Listed Individual Re Involvement W/Comanche Peak Response Team from Sept 1984 to Present.Certificate of Svc Encl.Related Correspondence
ML20214R853
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/16/1986
From: Garde B
Citizens Association for Sound Energy, TRIAL LAWYERS FOR PUBLIC JUSTICE, P.C.
To:
NRC ATOMIC SAFETY & LICENSING APPEAL PANEL (ASLAP)
Shared Package
ML20214R802 List:
References
OL, NUDOCS 8609290298
Download: ML20214R853 (6)


Text

.. ~

,, cr wWGW / '

/.:

UNITED STATES OF AMERICA -

p NUCLEAR Rc;GdLATORY COMMISSION ~

[ 1 ? 1--76 0 ., . m,.' " ';/

BEFORE THE ATUMIC SAFETY AND LICENSING APPEAL BOARD

  • )f x R, " '

~ , [" $8

,s N In tne Matter ot ) b

)

TEXAS UTILITIES GENERATING )

COMPANY, et al. ) Docket Nos.30-445

') 50-446 (Comanche Peak, Steam blectric )

Station, Units 1 & 2 )

CPRT DISCOVERY-2 ROLE OF COMANCHE PEAK PROJECT -

EMPLOYEES IN THE CPRT PROCESS.

1. For eacn inalvidual listed answer tne questions celow regarcing their inolvidual involvement with the CPRT ceginning in Septemoer 1964 up to ano incluaing the present.
a. Describe all involvements the indiviaual had in the planning and formation stages of the CPnT, Revision 0, Sections I-V, VII ano VIII.

D. Describe all involvements tne individual had in the planning and formation or. the CERT, Revision 0, tor eacn 1 SAP anu DSAP.

c. Descriue all involvements the indivlaual nad in the planning and tormation stages ot the CPRT, Revision 1, sections I-VIII, Appendices A & B.
o. Descrioe all involvements tne indiviaual had in tne planning ano tormation or tne CPRT, Revision 1, for eacn ISAP ana ubnP. l I

l 8609290298 860916 PDR ADOCK 05000445 G PDR

j e. Descrioe all involvements the inoividual had in the planning and formation stages of the CPRT, Revision 2, Sections I-VIII and Appendices A,B,D,E, and F.

f. Describe all involvements the individual nad in the planning and tormation of the CPRT, Revision 2, for each ISAP and DSAP.
g. uescribe all involvements. the inoividual had in the planning and formation stages of the CPRT, Revision 3, Sections I-VIII, and Appendices A,B,D,E,F,G, and d.
h. Describe all involvements the individual naa in the .

planning and tormation or tne CPRT, Revision 3, tot eacn ISAP and D5AP.

1. Identity all activities (inspection, review, engineering reviews, document review, quality overviews, analyses, evaluations, caculations, determinations, findings, referrais, independent assessments, decisions or any otner function ene performance of which in any way could affect the outcome of any activity; which tne indiviaual performed or participated in for each ISAP anu OSAP, under eacn revision.

J. Identify all CPSES project activities wnich each of tne individuals listed nas Deen ass 19nea to or involvea in aoove ano beyond the CPRT activities.

l l

q 1 i

l List of Individuals:

1. Deora L. Anderson 21. O.8. Jones
2. John W. Beck 22. M. (Curley) Krishner
3. Greg Bennotzen 23. Cecil Manning
4. J. Ted Blixt 24. M.R. McBay
5. Thomas C. Brandt 25. John T. Merritt
6. Peiry Brittain 26 Larry Poppewell
7. Curtis diggs 27. Frea Powers
d. Richard Camp 26. Gordon Purdy
9. David C. Cnapman 29. William T. Sims
10. Bill Ray Clements 30. Billy Snellgrove
11. Low F. F 31. Robert G. Spangler
12. H.A. F in,n,ik ar 32. Michael D. Spence
13. John Finneran 33. Ronald G. Tolson
14. S.M. Franks 34. Raymond Vurpillat
15. Douglas Frankurn 35. Antonio Vega
16. Joe 8. George 36. John Ward
17. Boyce Grier 31. W.I. Vogelsang '
18. C.R. Hooten 38. J ames R. Wells
19. deyward hutchison 39. Dwight Woodyard
20. Richard Ice
2. Proauce for copying and inspection all documents referenced, examinea and/or relied upon in answering these questions and identify for each oocument produced to whicn answer it is related.

Respectfully submitted, O d.- -

BILLIs P. GARD 8 #

TRIAL LAWfERS FOR PUBLIC JUSTICE I 2000 P Street, N.W. l Suite bil i Washington, D.C. 2003b l

t

\1k/ O,,s

-~ M tb LU"

, O t :, y\D 2' C SEP 161986> 11~

tocunno s

\l;f$bY$N'"lQ UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

'krjp g [

N dEFORE THE ATOMIC SAFETf AND LICENSING BOARD In the Matter of )

N )

TEXAS UTILITIES GENERATING )

COMPANY, et al. ) Docket Nos. 50-445

) and 50-446 (Comanche Peak Steam Electric )

Station, Units 1 and 2) )

CERTIFICATE OF SERVICE q By my signature below, I hereby certify that true ano correct copies of (1) INTRODUCTION TO CASE'S INTERROGATORIES AND REQUESTS FOR DOCUMENT PRODUCTION ON THE ADEQUACY OF THE COMANCHE PEAK RESPONSE TEAM (CPRT DISCOVERY)

(2) CPRT DISCOVERY - INSTRUCTIONS (3) CPRT DISCOVERY - 1 DEFINITIONS -

(4) CPRT DISCOVERY -2 ROLE OF COMANCHE PEAK PROJECT EMPLOYEES IN THE CPRT PROCESS nave been sent to the persons listed oelow this lith day of September 1986 oy: Express mail where indicated oy *; Hand-delivery where indicated by **; and First Class Mail unless otherwise indicated.

t 4

Administrative Judge Peter 8. Bloch U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Dr. Kenneth A. McCollom 1107 West Knapp Stillwater, Oklahoma 74075 Dr. Walter H. Joraan 881 W. Outer Drive Oak Ridge, Tennessee 37830 Elizabeth 8. Johnson oak Ridge National' Laboratory P.O. Box X, Building 3500 Oak Ridge, TN 37830 Ellen Ginsberg, Esq.

U.S. Nuclear Regulatory Commission '

Washington, D.C. 20555 Robert A. Wooldridge, Esquire Worsham, Forsythe, Sampels

& Wooldridge 2001 Bryan Tower, Suite 3200 Dallas, Texas 75201 Nicholas Reynolds, Esquire Bishop, Liberman, Cook, Purcell & Reynolds 1200 17th Street, N.W.

Washington, D.C. 20036 Geary S. Mizuno, Esquire Office of Executive Legal Director U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ..

Docketing & Service Section Office of the Secretary U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Renea Hicks, Esquire Assistant Attorney General Environmental Protection Division Supreme Court Building Austin, Texas 78711 Mrs. Juanita Ellis President, CASE 1426 S. Polk Dallas, Texas 75224 _

l l

i Mr. W.G. Counsil Executive Vice President Texas Utilities Generating Co.

Skyway Tower, 25th Floor 400 N. Olive Street Dallas, Texas 73201 Mr. Roy P. Lessy, Jr.

Morgan, Lewis & Bockius 1800 M Street, N.W.

Washington, D.C. 20036 Mr. Thomas G. Dighan, Jr.

Ropes & Gray 225 Franklin Street Boston, Massachusetts 02110 6

. D ,, N _-_ _= ,

ANTHON Z ROISMAN ,

s

+

_ --