Ack Receipt of Forwarding Rev 10 to Univ of Fl Training Reactor Emergency Plan.Rev Does Not Decrease Effectiveness of Emergency Plan.Nrc Approval Not Required
ML20217P321
Person / Time
Site: 05000083
Issue date: 08/22/1997
From: Michaels T
NRC (Affiliation Not Assigned)
To: Vernetson W
FLORIDA, UNIV. OF, GAINESVILLE, FL
References
TAC-M98483, NUDOCS 9708270295
Download: ML20217P321 (3)


Text

__

August 22, 1997 Dr. William Vernetson -

Director of Nuclear Facilities 102 Nuclear Reactor Building Department of Nuclear Engineering Sciences 4

University of Florida Gainesville, Florida 32611- {

1

\

SUBJECT:

REVISION 10 TO THE UNIVERSITY OF FLORIDA TRAINING REACTOR EMERGENCY PLAN (TAC NO. 98483)

Dear Dr. Vernetson:

This letter acknowledges receipt of your letter dated April 10,1997, which enclosed Revision 10 to the University of Florida Training Reactor Emergency Plan submitted under ,

the provisions of 10 CFR 50.54(q). I Based on your determination that the changes do not decrease the effectiveness of your emergency plan, and that it continues to meet the requirements of Appendix E to Part 50, 1 NRC approvalis not required.

Our initial review of these changes indicates them to be in accordance with 10 CFR 50.54(q). Implementation of these changes will be subject to inspection to confirm that they did not decrease the effectiveness of your emergency plan, in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of the letter will L be placed in the NRC Public Document Room.

l If your have any questions, please call me at (301) 4151102.

Sincerely.

ORIGINAL SIGNED BY: M. Mendonca for Theodore S. Michaels, Senior Project Manager Non Power Reactors and Decommissioning -

Project Directorate Division of Reactor Prograrn Management Office of Nuclear Reactor Regulation 6 C)l! 6 Docket No. 50-83 cc: See next page DISTRIBUTION:

[ Docket File 50-83! SWeiss OGC (015-B-18)

PUBLIC TMichaels CBassett PDND r/f EHylton SHolmes JRoe-PDND:PM PDND:LA PDND:(A)D TMichaels EHylton MMendonca

$/A97 8Y97 f M97 -

OFFICIAL RECORD COPY DOCUMENT NAME: G:\SECY\MICHAELS\UNIVER.FLO ,

s.a u L &<..i O @ t a 970827

^0295

" ' 970EE22 P" RJ' .I. 1.1Li.lL,ill.L .1.1

3 p ct:

/ 4 UNITED STATES

f g NUCLEAR REGULATORY COMMISSION

$ $ WASHINGTON D.C. 20666-0001

% ,, August 22, 1997 Dr. William Vernetson Director of Nuclear Facilities 102 Nuclear Reactor Building

Department of Nuclear Engineering Sciences l University of Florida Gainesville, Florida 32611

SUBJECT:

REVISION 10 TO THE UNIVERSITY OF FLORIDA TRAINING REACTOR EMERGENCY PLAN (TAC NO. 98483)

Dear Dr. Vernetson:

This letter acknowledges receipt of your letter dated April 10,1997, which enclosed Revision 10 to the University of Florida Training Reactor Emergency Plan submitted under the provisions of 10 CFR 50.54(q).

Based on your determination that the changes do not decrease the effectiveness of your emergency plan, and that it continues to meet the requirements of Appendix E to Part 50, NRC approval is not required.

Our initial review of these changes indicates them to be in accordance with 10 CFR 50.54(q). Implementation of these changes will be subject to inspection to confirm that they did not decrease the effectiveness of your emergency plan.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of the letter will be placed in the NRC Public Document Room.

if your have any questions, please call me at (301) 415-1102.

Sincerely,

% h 4~- -

Theodore S. Michaels, Senior Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-83 cc: See next page

c- .-

-f i

-University of Florida Docket No. 50-83 cc:

Mr. James S. Tulenko, Chairman Nuclear Engineering Sciences Department University of Florida 202 Nuclear Sciences Center Gainesville, Florida 32611 Dr Ratib A. Karam, Director

- Neely Nuclear Research Center Georgia Institute of Technology 900 Atlantic Drive, N.W.

Atlanta, Georgia 30332 Mr. Pedro B. Perez, Associate Director Nuclear Reactor Program North Carolina State University P. 0. Box 7909 Raleigh, North Carolina - 27695-7909 l

Dr. R. U. Mulder, Director UVA Reactor Facility Dept. of Nuclear Engineering Charlottesville, Virginia 22903-2442  ;

Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida

-2600 Blair Stone Road

- Tallahassee, Florida 32301 State Planning and Development Clearinghouse Office of Planning and Budgeting Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Mary E. Clark, Chief