Summary of 871203 Meeting W/Util & Inel Re Protective Sys Setpoints in Tech Specs.List of Meeting Attendees Encl
ML20237D692
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 12/15/1987
From: Heitner K
Office of Nuclear Reactor Regulation
To: Calvo J
Office of Nuclear Reactor Regulation
References
TAC-47416, NUDOCS 8712240127
Download: ML20237D692 (4)


Text

, - - - - . _ _ - - _ _ _ - _ - _ - - - - - - _ - - _ - - - - - _ - - - -------- --------------- -

C.

wag

[o o

'g UNITED STATES o NUCLEAR REGULATORY COMMISSION g E W ASHINGTON, D. C. 20555

% ;8 December 15, 1987

%***.*/

Docket No. 50-267 MEMORANDUM FOR: Jose A. Calvo, Director Project Directorate - IV Division of Reactor Projects - III,  ;

IV, V and Special Projects FROM: Kenneth L. Heitner, Project Manager Project Directorate - IV i Division of Reactor Projects - III, IV, V and Special Projects

SUBJECT:

SUMMARY

OF MEETING TO DISCUSS PLANT PROTECTIVE SYSTEM (PPS) SETPOINTS, DECEMBER 3, 1987 (TAC NO. 47416)

The purpose of this meeting was to discuss the licensee's proposed changes to the PPS setpoints in the Technical Specifications. The licensee's current proposal is contained in a letter dated August 28, 1987 (P-87278). The staff requested thct a technical evaluation of this submittal be performed by an NRC contractor, EG&G Idaho, Inc. A draft Technical Evaluation Report (TER) by the contractor was sent to the licensee by letter dated November 25, 1987. The attendees at this meeting are listed in Enclosure 1.

l The licensee briefly reviewed the history of this project. The NRC staff had i pointed out that the original PPS setpoints were not conservative. The staff recommended that the licensee adopt the appropriate ISA standards (ISA Standard 567.04-1982). The licensee has been pursuing this objective for several years, beginning with the licensee's letter cated March 9, 1984 (P-84078).

The focus of the discussion then shifted to the licensee's methods for obtaining the setpoints. The licensee's methodology is summarized on pages 3.3-4 and t 3.3-5 of the proposed Technical Specifications change. These methodologies were discussed in detail to ascertain how the licensee included both measured and estimated sources of error in the determination of allowable values and setpoints. The licensee's methodology was also reviewed against the staff's letter of November 26, 1986 on this subject.

After considerable discussion, the staff and it's contractor (EG&G Idaho, Inc.)

agreed that the licensee's methods met the ISA standards, were consistent with the staff's guidance, and were conservative.

The staff and it's contractor also briefly reviewed certain minor points i discussed in the draft TER. These included:

Clarifying the limits anc' basis for the PCRV rupture discs and  !

the PCRV relief valves.  ;

Expanding the basis for the rod withdrawal prohibits associated with  !

l the Interlock Sequence Selector Switch, and That certain other items be clarified in footnotes, tables, and bases.

$g22ggg{ %o 7 P '

I I

.g-The licensee agreed to these revisions and stated that they would provide a final draft of the proposed changes by January 3, 1988. The staff and licensee agreed this schedule would allow implementation of these changes prior to the fourth refueling. This would constitute a first phase of the PPS setpoint changes.

The staff and licensee agrced to pursue the remaining outstanding items as follows:

The licensee would complete the analysis of the fixed low feedwater flow trip value and submit this to the staff by January 30, 1988.

The licensee was continuing to analyze the programmed low feedwater flow trip value.

The staff woul_d review the proposed surveillance requirements and undervoltage protection setpoints in the June 21, 1985 (P-85214) submittal.

The staff would provide comments to the licensee in order to assure a correct final submittal.

The staff noted the licensee's submittal concerning the use of the internal test signal dated April 23, 1987 (P-87100) was in legal review pending final approval.

pl Kenneth L. Heitner, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects

Enclosure:

As stated cc: See.next page DISTRIBUTION

-Docket or Central File NRC POR Local PDR PD4 Reading J. Calvo Project Manager 0GC-Bethesda E. Jordan J. Partlow NRC Participants ACRS (10)

PD4 Plant File PD4/LA:k (PD4/Pb PD4/D PNoonan KHeitner JCalvo/MG

'12/ty/87 12/Jj/87 12//f/87 I

'4

., 4 Mr. R. O. Williams, Jr.

Public Service Company of Colorado Fort St. Vrain cc:

Mr. D. W. Warembourg, Manager Albert J. Hazle, Director Nuclear Engineering Division Radiation Control Division Public Service Company Department of Health of Colorado 4210 East lith Avenue P. O. Box 840 Denver, Colorado 80220 Denver, Colorado 80201-0840 Mr. David Alberstein,14/159A Mr. R. O. Williams, Jr., Acting Manager GA Technologies, Inc. Nuclear Production Division Post Office Box 85608 Public Service Company of Colorado San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Mr. H. L. Brey, Manager Nuclear Licensing and Fuel Division Mr. P. F. Tomlinson, Manager Public Service Company of Colorado Quality Assurance Division P. O. Box 840 Public Service Company of Colorado Denver, Colorado. 80201-0840 16805 Weld County Road 19-1/2 Platteville, Colorado -80651 Senior Resident Inspector U.S. Nuclear Regulatory Comission Mr. R. F. Walker P. O. Box 640 Public Service Company of Colorado Platteville, Colorado 80651 Post Office Box 840 Denver, Colorado 80201-0840 Kelley, Stansfield & 0'Donnell Public Service Company Building Comitment Control Program Room 900 Coordinator 550 15th Street Public Service Company of Colorado Denver, Colorado 80202 2420 W. 26th Ave. Suite 100-0 Denver, Colorado 80211 Regional Administrator, Region IV U.S. Nuclear Regulatory Comission i 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Chairman, Board of County Commissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environmental Protection Agency 1 Denver Place 999 18th Street, Suite 1300 Denver, Colorado 80202-2413

~. 7

~

l Enclosure 1 ATTENDEES NRC-PSC PPS Setpoints Meeting December 3, 1987 L

p, NAME .

ORGANIZATION' R- H. Holmes PSC - Licensing J. C. Selan- PSC - Licensing M. E. Deniston PSC - Operations J. L. Mauck NRC/NRR/ DEST /ICSB J' Stachew

. INEL K. Heitner. NRC/NRR/PD-IV J. J. McCauley PSC - Licensing

-J. R.' Johns PSC - Licensing

-S..Chesnutt PIC - Licensing 4

1 l

1 1

I u

. --__--_-__--- _ _ .I