Summary of 860627 Meeting W/Util Re Status of Tech Spec Upgrade Program.List of Attendees Encl
ML20207H028
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 07/21/1986
From: Heitner K
Office of Nuclear Reactor Regulation
To: Berkow H
Office of Nuclear Reactor Regulation
References
NUDOCS 8607240013
Download: ML20207H028 (5)


Text

..' *

[ o g UNITED STATES

.,. f g NUCLEAR REGULATORY COMMISSION g j WASHINGTON,0. C. 20655 t

g.....,/ July 21, 1986 Docket No. 50-267 MEMORANDUM FOR: Herbert N. Berkow, Director Standardization and Special Projects Directorate Division of PWR Licensing-B THRU: 0. D. T. Lynch, Jr., Section Leader Standardization and Special Projects Directorate Division of PWR Licensing-B FROM: Kenneth L. Heitner, Project Manager Standardization and Special Projects Directorate Division of PWR Licensing-B

SUBJECT:

SUMMARY

OF JUNE 27, 1986 MEETING WITH PUBLIC SERVICE COMPANYOFCOLORADO(PSC)TODISCUSSSTATUSOFTHEFORT ST. VRAIN (FSV) TECHNICAL SPECIFICATION UPGRADE PROGRAM (TSUP)

This meeting was held to discuss the status of the FSV TSUP. The meeting was requested by PSC to discuss their concerns about the TSUP scope and direction.

The attendees at this meeting are listed in the enclosure.

PSC stated that their general concerns were that the TSUP appeared to be diverging away from resolution. They concluded that the extensive coments on the final draft indicated that the NRC and PSC were not reaching agreement on a final product. They were also concerned that certain of the original ground rules for the TSUP do not appear to have been followed. Finally, the schedule for the program was being disrupted by the large amount of work remaining to be done. Specific PSC comments addressed:

The large number of requests for additional documentation, especially on reactor physics; Many requests for FSAR changes potentially beyond the licensing basis; The need for additional justifications (including deviations from Standard Technical Specifications);

Potential backfits; and Changes from earlier NRC guidance.

8607240013 PDR 860721 ADDCK 05000267 PDR

July 21, 1986 The staff replied that it would be desirable to address PSC's concerns in detail and to hold a meeting on the TSUP scope and direction. During this meeting, the TSUP ground rules would be reviewed and potential deviations from the ground rules discussed. The staff noted that in certain cases the TSUP incorporated actual licensing basis changes, and this required additional information and justification. However, the staff stated that it was not the intent of the TSUP to impose backfit requirements on FSV. PSC and the NPC staff agreed to schedule another TSUP meeting to further discuss these issues.

original si.gned by Kenneth L. Heitner, Project Manager Standardization and Special Projects Directorate Division of PWR Licensing-B

Enclosure:

As stated cc w/ enclosure:

See next page DISTRIBUTION:

1 Docket. File-NRC PDR Local PDR SSPD Reading JPartlow OELD EJordan BGrimes ACRS (10)

NRC Participants PNoonan KHeftner Olynch HBerkow GLPlumlee, F0B w

l o bR v

I B: SPD DPWRL-B:SSPD ces RL-B:SSPD DP

$ySSPD i nn KHeitner:cw Olynch H r 9

/$/86 07/1A /86 Y2l 07/?)/86 07/]f /86

. The staff replied that it would be desirable to address PSC's concerns in detail and to hold a meeting on the TSUP scope and direction. During this meeting, the TSUP ground rules would be reviewed and potential deviations from the ground rules discussed. The staff noted that in certain cases the TSUP incorporated actual licensing basis changes, and this required additional information and justification. However, the staff stated that it was not the intent of the TSUP to impose backfit requirements on FSV. PSC and the NRC staff agre,ed to schedule another TSUP meeting to further discuss these issues.

Kenneth L. Heitner, Project Manager Standardization and Special Projects Directorate Division of PWR Licensing-B '

Enclosure:

As stated cc w/ enclosure:

See next page i

1 1

. Mr. R. O. Williams Public Service Company of Colorado Fort St. Vrain cc:

Mr. D. W. Warembourg, Manager Albert J. Hazle, Director Nuclear Engineering Division Radiation Control Division Public Service Company Department of Health of Colorado 4210 East lith Avenue P. O. Box 840 Denver, Colorado 80220 Denver, Colorado 80201 Mr. David Alberstein, 14/159A Mr. J. W. Gahm, Manager GA Technologies, Inc. Nuclear Production Division Post Office Box 85608 Public Service Company of Colorado San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Mr. H. L. Brey, Manager Nuclear Licensing and Fuel Division Mr. L. W. Singleton, Manager Public Service Company of Colorado Quality Assurance Division ,

P. O. Box 840 Fort St. Vrain Nuclear Station Denver, Colorado 80201 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. 0. Box 640 Platteville, Colorado 80651 Kelley, Stansfield & 0'Donnell Public Service Company Building Room 900 550 15th Street Denver, Colorado 80202 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

.c Chairman, Board of County Commissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environmental Protection Agency 1800 Lincoln Street Denver, Colorado 80203 I

, Enclosure NRC - PSC Meeting June 27, 1986 9:00 a.m. Room 6110 MNBB Name Organization K. Heitner NRC/NRR/DPWRL-B Wm. Regan NRC/NRR/PWR-B/F0B G. L. Plumlee, III NRC/NRR/PWR-B/F0B J. P. Jaudon NRC/RIV/CH-PSA H. L. Brey Public Service of Colorado

. M. H. Holmes Public Service of Colorado C. H. Fuller Public Service of Colorado S. W. Chesnutt Public Service of Colorado -

Consultant -

Donald R. Hoffman Public Service of Colorado -

Consultant H. Berkow NRC/NRR/DPWRL-B/SSPD

0. D. T. Lynch, Jr. NRC/NRR/DPWRL-B/SSPD l

l

. _ - - . _ . ._. _. _. _ _ _ _ - _ _ . _ . _ _ . _ _ . _.