Summary of 861027 Meeting W/Util to Discuss Schedule for Ie/Nrr Insp of Equipment Qualification Program.Attendance List & Viewgraphs Encl
ML20214Q095
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 11/25/1986
From: Heitner K
Office of Nuclear Reactor Regulation
To: Berkow H
Office of Nuclear Reactor Regulation
References
TAC-42527, NUDOCS 8612040516
Download: ML20214Q095 (7)


Text

_ _ _ _

e uruq[o g

UNITED STATES f

g g

NUCLEAR REGULATORY COMMISSION

'; j WASHINGTON, D. C. 20555

\\...../

November 25, 1986 Docket No. 50-267

(

MEMORANDUM FOR: Herbert N. Berkow, Director Standardization and Special Projects Directorate Division of PWR Licensing-B THRU:

0. D. T. Lynch, Jr., Section Leade Standardization and Special L

Projects Directorate N

b Division of PWR Licensing-B FROM:

Kenneth L. Heitner, Project Manager Standardization and Special Projects Directorate Division of PWR Licensing-B

SUBJECT:

SUMMARY

OF MEETING WITH PUBLIC SERVICE COMPANY OF COLORADO TO DISCUSS SCHEDULE FOR I&E/NRR INSPECTION OF FORT ST. VRAIN EQUIPMENT QUALIFICATION (EQ) DR0 GRAM, OCTOBER 27, 1986 This meeting was held at the Nuclear Regulatory Commission's Region IV office on October 27, 1986. The purpose of this meeting was to discuss, in detail,theFortSt.Vrain(FSV)EQprogrammajorclosureactionsschedule projection. Meeting attendees are listed in Enclosure 1.

The Public Service Company of Colorado's (PSC) staff reviewed the status of the FSV EQ program and its relationship to the forthcoming EQ inspection, currently scheduled for the week of January 5,1987. The then-current PSC plan was to submit a request to NRC in mid-November to operate the plant at an eight-percent power level beginning December 15, 1986. The purpose of this request is to initiate core moisture dryout which will take approximately 60-days. PSC stated that the plant could operate at a 35-percent power level for the period of February 15 to March 15, 1987. The plant would then shut down on March 15 for two-weeks to install two six-inch vent lines and be ready to operate at an eighty-percent power level on April 1,1987.

The schedule presented by PSC is based on an EQ outage completion date of December 4, 1986. This schedule could be impacted by the EQ work currently in progress on Limitorque motor operators and Rachem splices.

The FSV Program Plan and Major Program Closure Actions Schedule Projection are presented in Enclosures 2 and 3, respectively.

'The FSV temperature profile issue was discussed. The peak tgmperature (U )

F predicted by PSC utilizing the CONTEMPT computer code is 375 while the peak temperature predicted by our consultant, Battelle, using the COBREE j

8612040516 861125 PDR ADOCK 05000267 P

PDR

7----

November 25, 1986 i,'

0 computer code is 487. A rreeting to discuss this issue was scheduled (and i

held) on November 20, 1986.

In view of the importance of this matter to the FSV EQ program, PSC was requested to formulate alternate proposals to address the resolution of this issue.

Original si Kenneth L. gned byHeitner, Project Manager Standardization and Special i

Projects Directorate Division of PWR Licensing-B

Enclosures:

As stated t

cc w/ enclosures:

See next page i

DISTRIBUTION:

l

/ Docket {11e7' NRC PDR r

Local PDR PBSS Reading i

JPartlow JBerkow KHeitner 1'

OGC-Bethesda EJordan BGrimes ACRS(10)

NRC Participants cc: Licensee and Plant Service List 4

t i

4 i

PBSS P-PBS

~

i o rian KHeitner:ac

/

HBerpow 11

/86 11/1 # 86 11/)f/86 11/u/86

1

'o

' computer code is 487. Ameetingtodiscussthisissuewasschebuled(and 0

held) on November 20, 1986.

In view of the importance of this m ltter to the FSV EQ program, PSC was requested to formulate alternate proposa ls to address the resolution of this issue.

l l

Kenneth L. Heitner, Project Manager Standardization and Special Projects Directorate Division of PWR Licensing-B

Enclosures:

As stated cc w/ enclosures:

See next page l

l

Mr. R. O. Williams Public Service Company of Colorado Fort St. Vrain cc:

Mr. D. W. Warembourg, Manager Albert J. Hazle, Direc tor Nuclear Engineering Division Radiation Control Division Public Service Company Department of Health of Colorado 4210 East lith Avenue P. O. Box 840 Denver, Colorado 80220 Denver, Colorado 80201 Mr. David Alberstein,14/159A Mr. J. W. Gahm Manager GA Technologies, Inc.

Nuclear Production Division 1

Post Office Box 85608 Public Service Company of Colorado San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Mr. H. L. Brey, Manager Nuclear Licensing and Fuel Division Mr. L. W. Singleton, Manager Public Service Company of Colorado Quality Assurance Division P. O. Box 840 Public Service Company of Colorado Denver, Colorado 80201 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Senior Resident Inspector U.S. Nuclear Regulatory Commission Mr. R. F. Walker P. 0. Box 840 Public Service Company of Colorado Platteville, Colorado 80651 Post Office Box 840 Denver, Colorado 92138 Kelley, Stansfield & 0'Donnell Public Serv. ice Company Building Commitment Control Program Room 900 Coordinator 550 15th Street Public Service Company of Colorado Denver, Colorado 80202 2420 W. 26th Ave. Suite 100-D Denver, Colorado 80211 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Chairman, Board of County Commissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environmental Protection Agency 1 Denver Place 999 18th Street, Suite 1300 Denver, Colorado 80202-2413

T j

a ENCLOSURE 1 MEETING ATTENDEES I

NRC - Region IV R. E. Ireland J. Jaudon T. Westeman D. Noman M. Skow R. Farrell A. Johnson NRC - I&E G. Hubbard R. F. Heishman NRC - STAFT P. Shemanski PSC M. Niehoff D. Warembourg J. Johns T. Prenger C. Fuller J. Waagg

f ENCLorO RE 2.

FSV EQ PROGRAM PLAN 10CFR50.49 COMMITMENT (PROGRAM DEFINTION) 1 i

r lf DEFINTION OF DESIGN BASIS EVENTS 2

If lf lf if ACCIDENT ACCIDENT ACCIDENT LOCATION (S)

PROFILE (S)

RECOVERY secn sa.4s e 3

4 5

1f I

(a) 7 (d)(3) jf

!!!!a!l!$!$$l IDENTIFICATION OF (e)(+1

!U${!$.(ests).

REQUIRED EQUIPMENT s

. th) 3) 6 (MEL) it!!!!:!!!-

!!!(t).

7

<d)(a) e laj.(h). 03 DETERMINATION OF s

to)t?). (e)te).

EQUIPMENT OPERATING

! ll$ll ! !!Nl PARAMETERS AND jgjJ1(t).

PREFORMANCE SPECIFICATION if iir il 111 if 14 II If II DEVELOPMENT OF LICENSING DEVELOPMENT Of tFD/OR/tt.F/NED EVALURTION AND SUBMITTAL (S)

OUALIFICATION PROGRAM REVIEW S

INCLUDING TECH SPEC g

DATA PACKAGES 10 Y

NRC If lf If If IMPLEMENTATION OF IMPLEMENTATION OF IMPLEMENTATION OF DESIGN CHANGES MATERIAL MANAGEMENT OPERATION, MAIPITENANCE gi AND MODIFICATIONS 12 ACTIVITIES AND SURVEILLANCE 13 ACTIVITIES

_lf_

FINAL CLOSEOUT AND 14 CERTIFICATION

r FORT ST. VRAIN EQ PROGRAM MAJOR PROGRAM CLOSURE ACTIONS E NCL0 TOV.E 3 SCHEDULE PROJECTION Program Area /

Schedule Interim Progrq;ss Major Closure Action Complete 10/24 11/10 12/8 AREA 1 Issue Final Program Document 11/21 Draft in Review AREA 2, 3, 4, S Complete AREA.6 Finalize Engineering Evaluations 10/28 11

'15 15 Total Complete Independent Review 11/7 85%

100%

AREA 7 Complete AREA 8 Approval Of SLRDIS Tech Specs 11/10 Completion Of Profiles SER AREA 9 Equipment Binders Approved 11/19 33 39 46 46 Total-Cable Binders Approved 12/15 10 30 36 Total AREA 10 Prepare / Revise Program Procedures Complete 47 Total Complete Internal Audit 11/14 70%

100%

Finalize Procedures 11/26 AREA 11 Complete EQ Modification Work 12/14 80%

88%

99%

65 EQ CN's Complete Final EQ CN Review 12/19 60%

90%

40 Total AREA 12 350 471 471 Total Complete Final EQ P.O. Review 11/E6 AREA 13 Complete EQ Maintenance SSR's 12/4 915 1005 1150 1150 Total Complete Final SSR Review 12/12 175 800 1050 1150 Total