Forwards Monthly Operating Rept for Jul 1982
ML20065C695
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 08/05/1982
From: Thornberry R
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML20065C698 List:
References
NUDOCS 8209240276
Download: ML20065C695 (2)


Text

__ _

PACIFIC GAS AND E LE C T RIC C O M PANY DIABLO CANYON POWER PLANT N- ' ' l PO. Box 56

R C. THORNDERRY PL ANT MANAGER August 5, 1982 Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C. 20555 RE: Docket No. 50-275 License No. DPR-76 Monthly Operating Report for July, 1982 Gentlemen: f id k,7 Enclosed are the completed monthly operating report forms for Diablo Canyon Unit 1 for M 1982. This report is submitted in accordance with Section 6.9.1.10 of our Technical Specifications and includes a report of changes made to the Environmental Radiological Monitoring Procedure.

Sincerely,

+

R. C. THORNBERRY RCT:dlm l

j Enclosure cc: Mr. R. H. Engelken, Director G l Office of Inspection and Enforcement Region V - USNRC Th I f

8209240276 820005 PDR R

ADOCK 05000275 pyg

. . - . - - . . _ . - - . - . - - , - - - - . _ . _ = . , .

4 MONTHLY NARRATIVE REPORT 4

0F OPERATING AND MAJOR MAINTENANCE EXPERIENCE 1

l This report describes the operating and major maintenance experience for

! the month of July, 1982. This narrative report was prepared by the plant staff and is submitted in accordance with Section 6.9.1.10 of the plant i

Technical Specifications.

There is no significant operating experience or major safety-related

maintenance to report.

No challenges to the PORV's or safety valves have been made. Furthermore, no changes have been made in the Offsite Dose Calculation Procedure or any radioactive waste treatment systems.

i Revisions 1 and 2 of the Environmental Radiological Monitoring Procedure were reviewed and approved by the Plant Staff Review Committee on June 3, 1982, and June 18, 1982, respectively. A full report of these changes, as required by Section 6.14 of the Technical Specifications, is included as an attachment to this report.