ML20206K134

From kanterella
Revision as of 23:20, 28 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards 1999 Interim UFSAR for McGuire Nuclear Station. UFSAR Update Includes Items Relocated During Improved Tech Specs Implementation.Next Regular UFSAR Update as Required 10CFR50.71(e) Is Due in Oct 1999
ML20206K134
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 05/03/1999
From: Barron H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20206K135 List:
References
NUDOCS 9905130076
Download: ML20206K134 (3)


Text

f ~~ Duke Energy Corporation Ic

' U< @= McGuire Nudear Station 12700 Hagers Ferry Road Huntersville. NC 28078-9340 (704) 875-4800 omCE H. B. Barron (704) 875-4809 ux Vice Prnident i

May 3,1999 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555

Subject:

McGuire Nuclear Station _

Docket Nos. 50-369 and 50-370 1999 Interim Updated Final Safety Analysis Report Pursuant to 10 CFR 50.4, attached are the signed original and 10 copics of the McGuire Updated Final Safety Analysis Report (UFSAR). This update is provided earlier than required by 10 CFR 50.71(c) to incorporate changes from the Accuracy Review Project to date. In addition, this UFSAR update includes items relocated during improved Technical Specifications implementation.

The effective date for this update is February 15,1999, as indicated in the lower margin of each replacement page. The changes are denoted with a change indicator "7" in the left margin adjacent to the changes. The package includes update insertion instructions, list of effective pages for tables, list of effective pages for figures, Chapters 1 through 17 entire text, and revised tables and figures. The next regular UFSAR update as required by 10 CFR 50.71(e) is due in October of 1999.

Please contact P.T. Vu at (704) 875-4302 for any questions regarding this submittal.

Very truly yours, lY H. B. Barron Attachments s\0 9905130076 990503

{DR ADOCK 05000369 PDR

~

I l

l L ..

r

]

l U. S. Nuclear Regulatory Commission

l. May 3,1999 Page 2 xc:

L.A. Reyes l Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta St., NW, Suite 2900 F. Rinaldi Senior Project Manager Office of U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 14E21 Washington,DC 20555 i

S.M. Shaeffer NRC Senior Resident Inspector McGuire Nuclear Station .

l l

l 1

l l

l

j U. S. Nuclear Regulatory Commission l May 3,1999 Page 3 I H. B. Barron, being duly sworn, states that he is Vice President of McGuire Nuclear j

Station; that he is authorized on the part of Duke Energy Corporation to sign and file with I the U.S. Nuclear Regulatory Commission this revision to the McGuire Nuclear Station Final Safety Analysis Report; and, that all statements and matters set forth therein are true and correct to the best of his knowledge.

l l

l

/ k$1:: s H. B. Barron, Vice President Subscibed and sworn to before me this 3rd day of May 1999, e

L0sL u/, b .SL - r>

otary Public bLo.at G. 7%p My Commission Expires:

4It.Laonx

'I l l

l l

L

~

Figure 6-3,4/1/98 Figure 6-3,2/15/99 f Figure 6-191,9/1/93 Figure 6-191,2/15/99 Chapter 7 Table 7-13,1/1/98 Table 7-13,2/15/99 None Table 7-19,315/99 None Table 7-20,2/15/99 Chapter 8 None Table 8-16,2/15/99 Chapter 9 Table 9-1,5/14/96 Table 9-1,2/15/99 Table 9-3,5/14/96 Table 9-3,2/15/99 Table 9-4,5/14/96 Table 9-4,2/15/99 Table 9 7,5/1/92 Table 9-7,2/15/99 Table 9-9,1/1/98 Table 9-9,2/15/99 Table 910,5/14/96 Table 9-10,2/15/99 Table 9-11, p.1,5/1/92 Table 9-11, p.1,2/15/99 Table 9-12,5/1/92 Table 9-12,2/15/99 Table 9-21, p.1,5/1/92 Table 9-21, p.1,2/15/99 Table 9-22, p.1.2.3,5,6,7,9,10,11,1/1/98 Table 9-22, p.1,2,3,5,6,7,9,10,11,2/15/99 Table 9-23,1/1/98 Table 9-23,2/15/99 Table 9-25,5/1/92 Table 9-25,2/15/99 Table 9-28, p.1,2,3,4,5/1/92 & 5/14/96 Table 9-28, p.1,2,3,2/15/99 Table 9-29, p.1,2,3,1/12/95 & 5/14/96 Table 9-29, p.1,2,3,2/15/99

,n Table 9-30, p. 2,9/1/93 Table 9-30, p. 2,2/15/99 I

Table 9-31,5/1/92 Table 9 31,2/15/99 Table 9-32,5/1/92 Table 9-32,2/15/99 Table 9-34,5/1/92 Table 9-34,2/15/99 Table 9-37,5/1/92 Table 9-37,2/15/99 Table 9-38, p.1,2,3,4,5/1/92 Table 9-38, p.1,2,3,4,2/15/99 Table 9-39,5/1/92 Table 9-39,2/15/99 Table 9-40,5/1/92 Table 9-40,2/15/99 Table 9-42,5/1/92 Table 9-42,2/15/99 Table 9-43,5/1/92 Table 9-43,2/15/99 Figure 9-7,5/1/92 Figure 9-7,2/15/99

  • Figure 9-18 Figure 9-18,2/15/99 Figure 9-26,4/1/98 Figure 9-26,2/15/99 Figure 9-27,4/1/98 Figure 9-27,2/15/99 Figure 9-28,4/1/98 Figure 9-28,2/15/99 Figure 9-30,4/1/98 Figure 9-30,2/15/99 Figure 9-31,9/1/93 Figure 9-31,2/15/99 Figure 9-46 Figure 9-46,2/15/99 Figure 9-47 Figure 9-47,2/15/99 Figure 9-49 Figure 9-49,2/15/99 Figure 9 50 Figure 9-50,2/15/99 Figure 9-5i Figure 9 51,2/15/99 Figure 9-57,5/14/96 Figure 9-57,2/15/99 Figure 9-65,4/1/98 Figure 9-65,2/15/99 Figure 9-66,4/1/98 Figure 9-66,2/15/99

~

(N Figure 9-72,4/1/98 Figure 9-72,2/15/99

(~,) Figure 9-74,4/1/98 Figure 9-74,2/15/99 Figure 9-75,4/1/98 Figure 9-75,2/15/99 1999 Interim Update t -  % j