Proposed Tech Spec Pages 179,179A,179B,191A & 191B, Describing Intent of Spec More Accurately & Providing Operational FlexibilityML20206K526 |
Person / Time |
---|
Site: |
Pilgrim, 05000000 |
---|
Issue date: |
05/22/1975 |
---|
From: |
BOSTON EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20204E974 |
List: |
---|
References |
---|
FOIA-86-58 NUDOCS 8606300116 |
Download: ML20206K526 (5) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20196D0241999-06-16016 June 1999 Proposed Tech Specs Re Reactivity Control Incorporating Operating Requirements That Are Consistent with NEDO-21231, Banked Position Withdrawal Sequence ML20206R8161999-05-11011 May 1999 Proposed Tech Specs Re HPCI & RCIC Surveillance Testing ML20206H9771999-05-0505 May 1999 Proposed Tech Specs Modifying Licensing Basis for EDG on- Site Diesel Fuel Storage Requirements & Corresponding TSs ML20207F1171999-03-0303 March 1999 Proposed Tech Specs Page 3/4.6-13 Re Reactor Vessel Matl Surveillance Program Withdrawal Schedule ML20237E0851998-08-24024 August 1998 Proposed Tech Specs Pages Supporting Proposed TS Amend Related to EDG AOT ML20236X7191998-07-31031 July 1998 Proposed Tech Specs Page 3/4.9-5 Re Suppl to EDG for Allowed Outage Time ML20249C7101998-06-26026 June 1998 Proposed Tech Specs Correcting Typos & Updating Bases ML20249B3231998-06-15015 June 1998 Revised Complete Set of TS Pages Re Relocation of Radioactive Effluent TS & Radiological Environ Monitoring Program to ODCM ML20217F9341998-03-26026 March 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20217H2791998-03-25025 March 1998 Proposed Tech Specs 3.6.A.1 & 4.6.A.1,pertaining to Primary Sys Boundary,Thermal & Pressurizations Limitations & Surveillance Requirements & Basis 3/4.6.A ML20203D4981998-02-20020 February 1998 Proposed Tech Specs Pages,Incorporating Ultimate Heat Sink Temperature of 75 F Into TS 3/4.5.B & Bases,As Required by Amend 173 ML20217K5691997-10-24024 October 1997 Proposed Tech Specs Page Adding Footnote Declaring One Containment Isolation valve,30-CK-432,operate for Limited Period Despite Not Being within IST Interval for Reverse Flow Testing ML20211G2311997-09-12012 September 1997 Proposed Tech Specs Re Radiological Environ Monitoring Program Moved to ODCM ML20210K4381997-08-0808 August 1997 Revised TS Pages 3/4.5-7,B3/4.5-6 & B3/4/.5-7 Requiring Verification That SBO-DG Is Operable Prior to Voluntarily Entering LCO ML20196J0041997-07-22022 July 1997 Proposed Revised TS Bases for Section 3.5.F,correcting Volume of Water Available in Refuel Cavity & Dryer/Separator Pool When Flooded to Elevation 114 Ft & Revising Torus Water Volume to Reflect Volume Above Min Pump NPSH ML20136J5501997-03-0707 March 1997 Proposed Tech Specs Rev for Section 3.10, Core Alterations Allowing Removal of Suspect Fuel Bundles Out of Planned Sequence ML20134C9671997-01-24024 January 1997 Proposed Tech Specs 2.0 Re Safety Limits ML20133A6511996-12-23023 December 1996 Proposed Revised Tech Specs 1.0 Re definitions,3.4 Re Standby Liquid Control sys,3.5 Re Core & Containment Cooling systems,3.7 Re Containment Systems & 3.9 Re Auxiliary Electrical Sys ML20132E5491996-12-10010 December 1996 Proposed Tech Specs Table 3.2.C.1 Re Instrumentation That Initiates Rod Blocks,Table 3.2.C.2 Re Control Rod Block Instrumentation Setpoints & Table 4.2.C Re Minimum Test & Calibr Frequency for Control Rod Blocks Actuation ML20135C1461996-11-26026 November 1996 Proposed Tech Specs,Modifying Definition 1.M, Primary Containment Integrity, to Include All Instrument Line Flow Check Valves to Make Definition Consisten W/Lco 3/4.7.A.2.a.4 ML20134K4361996-11-0707 November 1996 Proposed Tech Specs Re Installation of BWROG Enhanced Option 1A ML20117K6551996-09-0505 September 1996 Proposed Tech Specs,Providing Revised TS Pages 3/4.5-7 & 3/4.5-6 ML20116M1561996-08-12012 August 1996 Proposed Tech Specs to Plant TS Section 6.0,Administrative Controls & Sections 6.5.B.10.C & 6.14 of Util Quality Assurance Manual ML20108C0581996-05-0101 May 1996 Proposed Tech Specs Re Core Alteration to LCO & Surveillance Conditions Associated W/Secondary Containment ML20111C2761996-05-0101 May 1996 Proposed Tech Specs 3.1.1 Re Reactor Protection Sys (Scram) instrumentation,3.2.C.1 Re Instrumentation That Initiates Rod Blocks & 3/4.4 Re Standby Liquid Control ML20111B4201996-05-0101 May 1996 Proposed Tech Specs,Reflecting Implementation of 10CFR50 App J,Option B ML20108C1071996-05-0101 May 1996 Proposed Tech Specs,Relocating Administrative Controls Re QA Review & Audit Requirements of Section 6 from Plant TS to Boston Edison QA Manual ML20108A6561996-04-25025 April 1996 Proposed Tech Specs Re Part of Overall Effort to Improve Outage Performance at Plant ML20095E0771995-12-0808 December 1995 Proposed Tech Specs Bases Page B2-2,including GE11 GEXL Correlation Axial Power Profile & R-factor Ranges & Correcting Error in GE11 GEXL Correlation Mass Flux Range in GE Design ref,NEDE-31152-P, GE Fuel Bundle Designs ML20092A4421995-08-31031 August 1995 Corrected Tech Spec Page Re Reactor High Pressure Trip Setting ML20086K2661995-07-14014 July 1995 Proposed Tech Specs Re Section 2.1,Bases:Safety Limits; Section 3.3.C,scram Insertion Times & Section 4.11.C, Minimum Critical Power Ratio to Reflect Use of Advanced GE-11 Fuel Design in Cycle 11 ML20078R6221995-02-15015 February 1995 Proposed Tech Specs Substituting for Pages Contained in Proposed TS Amends Submitted Prior to 950130 Authorization ML20078N4861995-02-0909 February 1995 Proposed Tech Specs,Increasing Reactor High Water Level Isolation Trip Level Setting ML20077M6921995-01-0909 January 1995 Proposed Reformatted Tech Specs & Bases ML20077A8991994-11-22022 November 1994 Proposed Tech Specs Re Suppression Chamber Water Level ML20077B1861994-11-22022 November 1994 Proposed Tech Specs 3.5.F,4.5.F.1 & 3.9.B.1 & 2 Re EDG Allowed out-of-svc Time ML20078K7961994-11-22022 November 1994 Proposed Tech Specs Re Changes to MSIV Leakage Requirement ML20078K8151994-11-22022 November 1994 Proposed TS Pages 3/4.2-20 & 3/4.2-35 Re Tables 3.2.C-1 & 4.2.C ML20072S0081994-09-0606 September 1994 Proposed Tech Specs Re Primary Containment,Oxygen Concentration & Vacuum Relief ML20072S0501994-09-0606 September 1994 Proposed Tech Specs Re Instrumentation That Initiates Primary Containment Isolation & Initiates or Controls Core & Containment Systems ML20072S0861994-09-0606 September 1994 Proposed Tech Specs Re Standby Gas Treatment & Control Room High Efficiency Air Filtration Sys Requirements ML20072T0521994-09-0606 September 1994 Proposed Tech Specs Modification to Append a of Operating License DPR-35 Re Maintenance of Filled Discharge Pipe ML20069M3311994-06-0909 June 1994 Proposed Tech Specs,Increasing Allowed out-of-service Time from 7 Days to 14 Days for Ads,Hpci & RCIC Sys,Including Section 4.5.H, Maint of Filled Discharged Pipe ML20067B7111994-02-0909 February 1994 Proposed Tech Specs Revising Wording for Page 3 of License DPR-35,clarifying Words to Aid Operators & Removing Obsolete Mechanical Snubber Acceptance Criterion BECO-93-156, Proposed Tech Specs Requesting Changes Supporting 24 Month Fuel Cycle (Submittal 3)1993-12-10010 December 1993 Proposed Tech Specs Requesting Changes Supporting 24 Month Fuel Cycle (Submittal 3) BECO-93-132, Proposed Tech Specs Removing Low Condenser Vacuum Scram in Order to Reduce Spurious Scrams,Unnecessary Plant Transients & Turbine First Stage Pressure Setpoint1993-10-19019 October 1993 Proposed Tech Specs Removing Low Condenser Vacuum Scram in Order to Reduce Spurious Scrams,Unnecessary Plant Transients & Turbine First Stage Pressure Setpoint ML20059A9361993-10-19019 October 1993 Proposed Tech Specs for Removal of Scram & Group 1 Isolation Valve Closure Functions Associated W/Msl Radiation Monitors ML20046D0441993-08-0909 August 1993 Proposed Tech Specs,Proposing 24 Month Fuel Cycle ML20044G1331993-05-20020 May 1993 Proposed Tech Specs Reducing MSIV Low Turbine Inlet Pressure Setpoint from Greater than or Equal to 880 Lb Psig to Greater than or Equal to 810 Psig & Reducing Min Pressure in Definition of Run Mode from 880 Psig to 785 Psig BECO-93-016, Proposed TS 3.5.C,D & E Re k-infinity Factor,Spent Fuel Pool Storage Capacity & Max Loads Allowed to Travel Over Fuel Assemblies,Respectively1993-02-11011 February 1993 Proposed TS 3.5.C,D & E Re k-infinity Factor,Spent Fuel Pool Storage Capacity & Max Loads Allowed to Travel Over Fuel Assemblies,Respectively 1999-06-16
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20196D0241999-06-16016 June 1999 Proposed Tech Specs Re Reactivity Control Incorporating Operating Requirements That Are Consistent with NEDO-21231, Banked Position Withdrawal Sequence ML20206R8161999-05-11011 May 1999 Proposed Tech Specs Re HPCI & RCIC Surveillance Testing ML20206H9771999-05-0505 May 1999 Proposed Tech Specs Modifying Licensing Basis for EDG on- Site Diesel Fuel Storage Requirements & Corresponding TSs ML20205A1451999-03-23023 March 1999 Core Shroud Insp Plan ML20207F1171999-03-0303 March 1999 Proposed Tech Specs Page 3/4.6-13 Re Reactor Vessel Matl Surveillance Program Withdrawal Schedule ML20151S3851998-08-31031 August 1998 Long-Term Program:Semi-Annual Rept ML20237E0851998-08-24024 August 1998 Proposed Tech Specs Pages Supporting Proposed TS Amend Related to EDG AOT ML20236X7191998-07-31031 July 1998 Proposed Tech Specs Page 3/4.9-5 Re Suppl to EDG for Allowed Outage Time ML20249C7101998-06-26026 June 1998 Proposed Tech Specs Correcting Typos & Updating Bases ML20249B3231998-06-15015 June 1998 Revised Complete Set of TS Pages Re Relocation of Radioactive Effluent TS & Radiological Environ Monitoring Program to ODCM ML20217F9341998-03-26026 March 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20217H2791998-03-25025 March 1998 Proposed Tech Specs 3.6.A.1 & 4.6.A.1,pertaining to Primary Sys Boundary,Thermal & Pressurizations Limitations & Surveillance Requirements & Basis 3/4.6.A ML20203D4981998-02-20020 February 1998 Proposed Tech Specs Pages,Incorporating Ultimate Heat Sink Temperature of 75 F Into TS 3/4.5.B & Bases,As Required by Amend 173 ML20217K5691997-10-24024 October 1997 Proposed Tech Specs Page Adding Footnote Declaring One Containment Isolation valve,30-CK-432,operate for Limited Period Despite Not Being within IST Interval for Reverse Flow Testing ML20211N6871997-09-16016 September 1997 Rev 9 to Procedure 8.I.1.1, Inservice Pump & Valve Testing Program ML20211G2381997-09-15015 September 1997 Rev 8 to PNPS-ODCM, Pilgrim Nuclear Power Station Odcm ML20211G2311997-09-12012 September 1997 Proposed Tech Specs Re Radiological Environ Monitoring Program Moved to ODCM ML20216C0631997-08-29029 August 1997 Semi-Annual Long Term Program Schedule ML20210K4381997-08-0808 August 1997 Revised TS Pages 3/4.5-7,B3/4.5-6 & B3/4/.5-7 Requiring Verification That SBO-DG Is Operable Prior to Voluntarily Entering LCO ML20196J0041997-07-22022 July 1997 Proposed Revised TS Bases for Section 3.5.F,correcting Volume of Water Available in Refuel Cavity & Dryer/Separator Pool When Flooded to Elevation 114 Ft & Revising Torus Water Volume to Reflect Volume Above Min Pump NPSH ML20210K3551997-07-0101 July 1997 Rev 16 to Procedure 7.8.1, Water Quality Limits ML20136J5501997-03-0707 March 1997 Proposed Tech Specs Rev for Section 3.10, Core Alterations Allowing Removal of Suspect Fuel Bundles Out of Planned Sequence ML20134C9671997-01-24024 January 1997 Proposed Tech Specs 2.0 Re Safety Limits ML20133A6511996-12-23023 December 1996 Proposed Revised Tech Specs 1.0 Re definitions,3.4 Re Standby Liquid Control sys,3.5 Re Core & Containment Cooling systems,3.7 Re Containment Systems & 3.9 Re Auxiliary Electrical Sys ML20132E5491996-12-10010 December 1996 Proposed Tech Specs Table 3.2.C.1 Re Instrumentation That Initiates Rod Blocks,Table 3.2.C.2 Re Control Rod Block Instrumentation Setpoints & Table 4.2.C Re Minimum Test & Calibr Frequency for Control Rod Blocks Actuation ML20135C1461996-11-26026 November 1996 Proposed Tech Specs,Modifying Definition 1.M, Primary Containment Integrity, to Include All Instrument Line Flow Check Valves to Make Definition Consisten W/Lco 3/4.7.A.2.a.4 ML20134K4361996-11-0707 November 1996 Proposed Tech Specs Re Installation of BWROG Enhanced Option 1A ML20117K6551996-09-0505 September 1996 Proposed Tech Specs,Providing Revised TS Pages 3/4.5-7 & 3/4.5-6 ML20116M1561996-08-12012 August 1996 Proposed Tech Specs to Plant TS Section 6.0,Administrative Controls & Sections 6.5.B.10.C & 6.14 of Util Quality Assurance Manual ML20117K6611996-07-17017 July 1996 Rev 15 to PNPS Procedure 1.2.2 Administrative OPS Requirements ML20111C2761996-05-0101 May 1996 Proposed Tech Specs 3.1.1 Re Reactor Protection Sys (Scram) instrumentation,3.2.C.1 Re Instrumentation That Initiates Rod Blocks & 3/4.4 Re Standby Liquid Control ML20111B4201996-05-0101 May 1996 Proposed Tech Specs,Reflecting Implementation of 10CFR50 App J,Option B ML20108C1071996-05-0101 May 1996 Proposed Tech Specs,Relocating Administrative Controls Re QA Review & Audit Requirements of Section 6 from Plant TS to Boston Edison QA Manual ML20108C0581996-05-0101 May 1996 Proposed Tech Specs Re Core Alteration to LCO & Surveillance Conditions Associated W/Secondary Containment ML20108A6561996-04-25025 April 1996 Proposed Tech Specs Re Part of Overall Effort to Improve Outage Performance at Plant ML20095E0771995-12-0808 December 1995 Proposed Tech Specs Bases Page B2-2,including GE11 GEXL Correlation Axial Power Profile & R-factor Ranges & Correcting Error in GE11 GEXL Correlation Mass Flux Range in GE Design ref,NEDE-31152-P, GE Fuel Bundle Designs ML20100J2521995-11-22022 November 1995 Rev 7 to Pilgrim Nuclear Power Station Odcm ML20092B5861995-09-0101 September 1995 Rev 0 to Third Ten-Yr Interval ISI Plan for Pilgrim Nuclear Power Station ML20092C4331995-09-0101 September 1995 Startup Test Rept for Pilgrim Nuclear Power Station Cycle 11 ML20092A4421995-08-31031 August 1995 Corrected Tech Spec Page Re Reactor High Pressure Trip Setting ML20086K2661995-07-14014 July 1995 Proposed Tech Specs Re Section 2.1,Bases:Safety Limits; Section 3.3.C,scram Insertion Times & Section 4.11.C, Minimum Critical Power Ratio to Reflect Use of Advanced GE-11 Fuel Design in Cycle 11 ML20078R6221995-02-15015 February 1995 Proposed Tech Specs Substituting for Pages Contained in Proposed TS Amends Submitted Prior to 950130 Authorization ML20078N4861995-02-0909 February 1995 Proposed Tech Specs,Increasing Reactor High Water Level Isolation Trip Level Setting ML20077Q1181995-01-13013 January 1995 Owner'S Specification for Reactor Shroud Repair ML20077M6921995-01-0909 January 1995 Proposed Reformatted Tech Specs & Bases ML20077B1861994-11-22022 November 1994 Proposed Tech Specs 3.5.F,4.5.F.1 & 3.9.B.1 & 2 Re EDG Allowed out-of-svc Time ML20078K8151994-11-22022 November 1994 Proposed TS Pages 3/4.2-20 & 3/4.2-35 Re Tables 3.2.C-1 & 4.2.C ML20078K7961994-11-22022 November 1994 Proposed Tech Specs Re Changes to MSIV Leakage Requirement ML20077A8991994-11-22022 November 1994 Proposed Tech Specs Re Suppression Chamber Water Level ML20078N8421994-11-18018 November 1994 Rev 32 to Procedure 8.7.3, Secondary Containment Leak Rate Test 1999-06-16
[Table view] |
Text
-. - _ _ _
. ! i y
.niqm colmmotm roa op.tyon 7 cmynrig;;;_pguygggy 3 6 . 11 Mrbtrne Erfluents )' , '.
. 4.0,6 dir% rne T.friuonte_
..o . . 3
- 1. The rolekco rate of cross 1. Tbc crock and M rticult,to ,
6ctivity execist for hrJogena activlty of R13 v4acoua i yhotos relcaned to the environ- \
tnd Mrtionintes with br,1f-liver. lobCor thtu cicht dhyn, trent ,chall be toonitored one shall not exceed ,
recorded
- c. >br offluent stre ws he.ving Qa 4 Qv continuous tionitoring g
- capbility, the notivity and 0.25/E a 0.10/lg. f1w rato chs11 bo nonitored -
- nna recorded.
vbere b. Tor effluent strew n without
. continuous rf.initoring ceqc-Qc
- relebec rate fro:u en$n .b1 Aity, the activity nnd t,tt.ch in Curico/cccond, relcace vohme chall be ,
tenitored cud recorded and Qv n rolesso reste frora the the reltace rate chn11 be retetor buildina exhavet controlled to eithin the vent.in Ocrico/cecond. liteits eMoiflod in 3.8.B.l.
E er dic- -
e hvetcco intecrationenergy (l'ovp/Dic) in.
the stsch (s) t.nd vent .
(v) effluent.
R. 'h) The relesco rate linit of 2 Gro.to rt.dionotivity of C60coun cli radiojodinen e.no effluents chall bo ponitored redioactive m terinin in Gud recorded to enetelo relcrao Mrticultto fornivith r6 ten of cropo radionctivity hsif-liven creater than to be.deterr.ined on an hour)v c1Cht dayry relenced to bccic the environo ac 3crt of the cascoun vnttes frosi , ,
the cite abs 11 be such
, tht.t N
1.8 r.105Qy 4 1.8 x 10 Qs .s 3 ,
vhero:
Qy ' releace rate fro:a the i reactor buildiun exhsunt ;
l veut in curicc/ cec'.- '
Q3 = relence rate fro:>, the cain cttch in curicc/cco. -
. \
179
~
a 8606300116 860613 -
"' ~ " ~ ~ ' '
NS ::
6-58 PDR l
1 I Q:WIli3_CQ30TI0ln JtTI OP7%710!! ._
, fttrtV!'Ila!.lOI: R1'QUJn W.D:70
' 3 . 0 , 11 bj orr o 1Tf.hmala (Cont'd) II.8.D Er,byrno_y.ffherde. (Cont'd)
(b) The cycrt.co rclesco rate por cito of hil radiof odinos tmd rbdiccotivc totericio in Mrtiot0Lto form with he.lf.
liven creater than cicht drys during tary enicador quarter ,
sinn be cuch th'itt 13(1.8x109 Qy + 1.8 x lol iR3) g 1 -
(c) me nyerece rolence rate per cite of a n radicioM nco end rndiccotive ratorit:)c in
- prticulate forv. vith half-liven creator thm cicht dcyo during any.leriod of 12 councoutive tronthr shs11 bc .
cuch thst: .
R5(1.8 x 105 Qy 4 1.8 x 10N Q 3 )r1 (d) We enount of iodino-131 rc)cneed -
during nny culenist quarter t,hsu not execed & Ci/rcactor.
(c) The trount of iodine-131 relcaced -
during Luy period of 32 consecu.
tive rcntha t.hc.n not exceed 401/rcactor. ,
(f) fiheuld cny of the CMditiobn of 3 0.D.2(f)(1) or (P) listed belon exict, the liccuoco ehu n tmke
.cn .$ nvectiotion to iccatify, '
the caut.cn of the relcarte raten, define tant initiato a progre.m of totion to reduce the reic6cc <
ratto to the desich objcotivo levelc. We der;1cn objectiven ~
ttiWinto thst the.nnnual toted .
quantity of all r&dioiodinec ;
end radionet$re uterird,in '
Mytiotor,tc forlac uith hdif-liven crenter than cicht doyo, t bove 14c):cround, fro:, cu '
.s -
reactorts at a cite.chotdd riot I recult in an annud'dnhc to cny ormu of sn individus1 in ;
kn unret:tricted nrca fron un Mthvt.yc of cypor,ure in excean . -
of 15 tec a, cnd that the i.tumai ' ,
tots,1 quantity of iodino-331 diccharced from cach rcactor "
at a t:ito should not execed 101.
The licennco t;hnu report these .
ections to 1MC within 30 dayo from the end, of the quarter during which the releacco ooonrred. '
l?9/i .
-..:p.......
< v * .*- . .. ...--- --.--6 . ~ . . . . . ,
._ }
i
! . - . p i -
l h181ICLim,S.fsibl2'J IDifl_1,M1 5,0.7 MU 70n DURYJ.'J.lsIGilr ro'tuyj194mW
- 3. U.li 6,illi.p2;trL }ltO.15.tf_Lt A (Cont'd) 14 . 0 . 11 /W 1yynt_ITfJ m l.1 (Cont'c1)
(3 ) i f tbc swet*e r*,r* rc3coev twto ye s it,e cif' r 3.1 s t.diesitx11 tion sind rt.dics-
&ctive sisstue$ rJ S sn Mrtic404to foraa w$f,b 14f-;nivor, ever ter thr. t > a icht, crtyn duriuG t.11y cid ete) .r
. nutrt,cr *
$ t. E t,gryta (1545 f, g LO(3.8 x 109 (y + 1.8 x acb d3) A 1 .
(P) if tho ee,mnet of sodint..
i 1,31 rtd e a.ned during antry -
i celoudstr queart.or in creator tbnto O.S Ci/rs.4.oLor i ,
- 3. 'na t' ev 3 ( e.c as **c.t o of e.coen cdocous S. An S ectorio hnOycia tr M 2.3. b e kotivlty frtaa thu ta:11: tathch t. ht+1.1 . tad o o f ti yt@rc u e nt.t.tivo r u t"3'3 tt init, e>: coed 0.10 curien/ tic cond of ' the Ce 6 COVE: red 3 % U15V3tY Oben qwa s.. nvented
- r. cever tit (v et.lendhr .boins rohnera which rabt.11 i
- s oent.i ry emd da,te.rs ins the, saus.ut$ t y of t.ho yu A e6v$ 3*n swc1(2- .
truolidin, except tritturn, r
. olt aped s e
f i
f 9
l g l
. n P
I ba e#& . gae am **=w* ewe *= . .-ee..%,
kb e
4 4
5 5
4
, 9 p-.
k .,
g **.-
[
,, e Ce_ _ _ _ _ _ _
. ( .p/Sta: ~.
h sob.B cud li.8.B Af riornghtfluentn
- hadiocetivo cacco cre routinc3y diccherced from the Etntion vin the noin otsch 4 and potentially frota the bui161pc exbsuct vent. 9hc lirraita in cpeef fiention 3.8.h rro derived to kcep the off-tite docen en lov cc practionb3o and belov h{
y the lir.ite given in 10 Crit 20. '!bece cpecificction,c g)j)ay to,the jnter.its period prior to operntion of the cuartentect enneoun ho.Laup cyctein, vhen y hppropr$hte chancen vD1 be tv.6e to the crecificctionc. ,
y - -
y Dr.thiled doce eniculat'ionn have been nodo by the cpplicent end nre contained .
k in Appendix E of the pDAR. 'Jhone calculationo concider site netcorology t;nd li f rotopic content of the effimnt. Independent doce etaculationn for revercl 1
30entions off-cite have been lado by the Ahc ctaff. Tr o AUC retnft nethod i utilized on-nite incteordlogieni data devo2oped by the opplicent.
h he nethod utilf red by the etcff in deteribed in Section 7-5.P.$ of
- % ttorolopy and Aton,ie )
- ncrcy-1 % B", Tne renultt, of thece enicujntionn vere i teore conservotive then those cencrated by the app 3 f ecnt and vero thuc chcocn a to be uted an the basic of cr.tob)f olegnt of the linitc. 9M equation citen
$ in Specific 6 tion 3.8.h.1 provi6tc c nothod to be used in curc,ing the hirborne '
2 effluente fro a the tr. tin ctock t,nd the buf)dinc exhaur.t vent that vill annure g thrit total off-cito dr#r.co are not in c>.ccon of tht, )iidtn cpecified in 1 10 CpH 20. 9hc continuouc relecco of rcof ot;ctive nobic car.eu in cirborno
{ cffluento nt the ratoo pemir.cib)e by Specification 3.8.D.) tre ec1culated a by the Comincion'n etnff to correcpond to en upper liief t doen of 500 ,
l- tren per your at the 1.oct rectrictivo innd boundary (Ok' of the etntion).
7hc perc.iccibic relcrine rate from the pinnt stoch nione by thic c}>ccifict tion j $r chout 0 36 curict/necond boced on en avoroce dicintegration cncrcy of 0 7 li Mov. ,
!' 9tc cpplication of the hvercp dibintenention energy for'the relcoted rediocotivo cococ mkco the forttulo approprinto to a vide ronce of relconn i conditionc cnd extended holdup pcriodc.
Vhe relcar:o rate Specificationn for a rtMolodine end radiotictive PAtorit.1. iii I Nrticulate fora vith holf-livcc crecter than eight dsyn are dependent ou
, exit. ting rtdonuclide Mthwayc to ran. Tric pt.thvoyn which vere exctc,ined for these Optef fier tionn nrer 1) Individus1 inhniation of airborne rndionucliden, f P) oc}cottion of radionuoliden onto creen 'lenty vegetation vith rubsequent
& cont.unption by r,8n, an$ 3) 6epocition onto granny r.rcern where railch unitt.nic creto vith concunption of the ut.1k by 14n. Methodo for cctitating d.ocott to the thyroid vitt thece pnthvoyo ort, deteribed in Drnit Hectnatory Guide 1.AA.
j She offcite loetif on vith the highcot anticip;ted thyroid dofc rate from rediofodinen cud radiodetivo 14tcrit.) in particulato forn with half-livoo
/[ greater than eight dnyt vnc detemined uoing on-cite c.etcorologieni data and the exproccienc Ger.oribed in Dr0ft Regn1ntory Guido 1.44.
Dpecifictation 3.8.D.2 (c) limits tho tc)ctioc rt te of redioiodinon and l radionetive pr.terini in particu1 rite fem with hnif-31ven creater thcn richt '
dcyc r.o tht.t the corret:ponding nunval thyroid dopo v$n the rect rectrictive pathvay la lecc then 1500 brem 191A
, ' m~ ~.-
..-.J..- - ..-.- ... - . ~. -.. .,- - -
( -
f fi iBijfQ: "
f i
3.8.B and h.D.B Airborno Effluente (Cont'd) "
l Por radiciodinen emd radion.otivo ratorird in particulate forrn uith '
hair. liven creater thnn eicht ocye, the ruont rentrictivo 30ention in l n o. airy cov Jochged $603 notera in the vp,ct direction (vent X/Q u P.2 x 30-7 coo /u >; stach X/Q c 1.8 x 10-0 riec/m3),
Droitication 3.8 B.2(b), (c), (d) r.nd (o) entnblichen upgr olfcite
! 3 cyclo for the relcanen of radiciodinen and radionotivo laterint in .
)crtf oultto forn, dth hnif-liVCS Crchter than eight dnya at tdoo the .
decicn objective ennual quantity during smy oulendar quarter, or four tinico the d. coign objcotivo nunual quantity during any priod of IP l connecutive r.ouths. In addition to tho )fr.iting conditione for .
opMetion of 8poifications 3.8.U.2(t) through (c) the reprting i
requiren. ente of 3.8.D.2(f) provide thct tho cause chall bo identified thencycr the releta,o of caecoue effaucuta execcdn one bnit h denign -
objective umual gunntity during t.ny enlonder quarter rmd that the popaned proaraw of notion to rod.ueo nuoh releuco ratco to the decicn -
objectivco t.hn11 bo donoribed. -
P.pecifiention 3.8.D.3 ectcb35t. hen oc 3w an practiokblo limite for the relonco Icycar, of coccouc cffluento for the interita priod. 'jhe valuco chosen
' t.rc concistent with interdu lit.ita ut.cd for other Ifdn's vithout .
aucu.ented. tyntemn. % der thece creificationn, the licennce wl)1 be required to tnhe auch c.ctiono, including reducing niation power, or other cppropriato Lateuren,,na lay be necenntry to hecp the avoroco radioactivo caneous rolencen be)w tMn level, but afforded the f)oxibility regarding short-term plcut oMration to t.nintsin ntntito -
ponor for pub 3$e needc. ,
Spoificntion 3.0.E.6 reo,uirca that the prir.nry contailunt atrocphere r000$ve trohtuent for the renoval of coccous iodinco (md prticulatea prior to its relcann whenever the rer:ctor in in the RlG tode. Shin opcificktion provjden a further rec.uotion from thin pource of rolcaco of iodinec emd particulaton from the station. '
W curycillenoc requirementa given under 8pecifiention h.8.h provide accurnnco that radioactive caneone effluento from the ntation'aro proper)y controlled. emd uc>nitored over the 3$fo of the statich. 'ihene ouryciliance requiretwnto provido the enth for the licennco cud the Ov.ar.iccion to cynivate the ctation'a prformnon relctive to radionotivo enecous vectes rolenced. to the environnent. Reports on the qucutitics of radioactive
- inatorinin rc3 caned in concoun effluenta tholl be furniched, to the Com.
toittion on the bacia of Ocetion 6.6 of theco hhnical Op0cifice,tions. ,,
On the bonia of cuch reparto tmd any tidditionni inforation the Cota,in-Dion imy obttdn fro.'s the liconace or othero, tho Cox.r.iccion tny fro:n tina to time require the liocnoce to tale cuch action no the Co:rninsion deons cppropriate.
1913 g&- t