Core Shroud Insp Plan
ML20205A145
Person / Time
Site: Pilgrim
Issue date: 03/23/1999
From:
BOSTON EDISON CO.
To:
Shared Package
ML20205A137 List:
References
PROC-990323, NUDOCS 9903300304
Download: ML20205A145 (14)


Text

t

[t. --

ENCLOSURE A PILGRIM CORE SHROUD INSPECTION PLAN BACKGROUND Boston Edison Company (BECo) completed a core shroud modification during refueling outage (RFO) 10 in response to GL 94-03. BECo examined the core shroud modification daring RFO 11 in accordance with BWRVIP-07 " Guidelines for Reinspection of BWR Core Shrouds", EPRI TR-105747, s dated February - 1996, whien addresses NRC SER requirements and recommendations. The following RFO 12 examination plan is developed based on BWRVIP guidelines. ,

CORE SHROUD AND SHROUD SUPPORT

-e Visual examinaiion of shroud vertical welds with the intent of completing 50% of the total length baselins examination. This examination will complement an ultrasonic examination performed in RFO 11. The examination ~ will be a EVT-1 and follow the guidelines of BWRVIP-03.

.~ Visual examination by VT 3 of-the three remaining repair hardware assemblies. This examination will be performed to the attributes in BWRVIP-07. l e Visual examination by '

, for the th,ee remaining repair anchorage assemblies. This examination will follovv' , ue guidelines of BWRVIP-07. Also two additional anchorage assemblies (gussets) v .. .,e examined to satisfy the baseline examination of BWRVIP-38

. Visual baseline examination by EVT-1 of 10% of the accessible H9 weld assembly following the guidelines of BWRVIP-38.

JET PUMP ASSEMBLY e All beam bolts will be ultrasonically examined as a baseline. This will include locations BB-1 and BB-2 of BWRVIP-41.

  • Five of the RS-3 welds (riser pipe to transition piece) will be visually examined to EVT-1 as stated in SWRVIP-41 i

e The general condition of 50% of the jet pumps will be examined per Boston Edison l

. specifica 5ns.

. The Riser Brace on 18 jet pumps (all except 3 and 5) will M examined by EVT-1. This ,

exceeds the scope of BWRVIP -41 due to the status of the swing gates and set screws. )

l

. The set screw gaps will be measured on Jet pumps 1,2,8,10,12,13,14,15,16,17,18, 19, and 20.

  • Swing gates that were found not engaged in RFO 11 will be inspected, these are; 1,4, 6, 7, 8,9,16, and 17.

CORE PLATE  !

e The remaining 3 sets of Core Plate wedges will be examined for proper installation as part of the Shroud repair examination.

9903300304 990323 PDR ADOCK 05000293 O PDR , j i

I TOP GUIDE e Examination shall be a VT-1 in two adjacent aligner assemblies in accordance with BWRVIP-26.

STEAM DRYER e Examination shall be a VT-3 of Drain Channels and 1.eveling Screws REPORTING OF INSPECTION RESULTS The RFO 12 inspection results will be reported to the NRC as an attachment to the ASME Section XI refue!ing outage report.

I l

l

a: -

ENCLOSURE B .

CORE SPRAY INTERNAL PIPING AND SPARGER EXAMINATIONS RACKGROUND NRC IE Bulletin 80-13 requires in'spections of core spray spargers and piping between the inlet nozzle and the vessel shroud during each refuc':ng outage. In the event cracks are identified, an evaluation shall be submitted to the NRC for review and approval pncr to retum to operation.

The 3 oiling Water Reactor Vessel and Intemals Project has developed guidelines, "BWR Core

' Spray Intemals Inspection and Flaw Evaluation Guidelines" (BWRVIP-18), Ated July 1996.

Based on BWRVIP-18 guidelines and NRC Bulletin'80-13, BECo completed examination of ,

core spray intemal piping during RFO 11 and resolved examination findings. On October 15, 1998, BECo presented to the NRC staff Pilgrim-specific tecnniques for the examination of core q spray piping weld P-9 and subsequently demonstrated the examination tecnnique at the I GE/EPRI facility on February 8,1999, in line with our commitment to provide a plan for I reinspection and repair of core spray piping intemals (TAC NO. M93398 and BECo letter No. j 2.97-033, dated March 18,1997). The following examination plan is developed in accordance J with BWRVIP-18 guidelines.

CORE SPRAY PIPING

+ All welds with ultrasonic indications from RFO 11 will be reexamined by ultrasonic methods; welds without ultrasonic indications will not be examined in RFO 12. This follows guidelines established in BWRVIP-18.

  • Welds which could only be visually examined in RFO 11, will be reexamined by EVT 1
  • All four P-9 welds will b9 ultrasonically examined.

CORE SPRAY SPARGERS. SfARGER BRACKETS. CORE SPRAY PIPING BRACKETS l

. No examinations are planned in RFO 12 REPORTING OF INSPECTION RESULTS The inspection results will be reported to the NRC as an attachment to the ASME Section XI refueling outage report, and in accordance with IE Bulletin,80-13.

i

h ENCLOSURE C .

ASME SE' 'ON XI ISI PLAN FOR 1999 ON-LINE AND HEFUEL OUTAGE il I

1 l

l I

I I

I 1

, Enclosure (C)

PILGRIM NUCLEAR POWER STATION ASME XIINSERVICE INSPECTION PLAN FOR 1999 ON-LINE AND '

REFUEL OUTAGE 12 EXAMINATIONS CO31 Pone.NT DESCRIPTION CATEGORY CODE ITE31 SYSTE31 ISO 31ETRIC EXA31 ON-LINE ,

RPV-N1 A NIR NOZZLE INNER RADIUS B-D B3100 RPV 1S1-1-54-1 UT No

]

RPV-N2A-NIR NOZZLE INNER RADIUS B-D B3.100 RPV 151-I.54-1 UT No i

RPV-N28-NIR NOZZLE INNER RADIUS B-D 133.100 RPV 1S!1-54-1 UT No l l

RPV-N2C NIR NOZZLE INNER RADIUS B-D B3.100 RPV ISII-54-1 UT No RPV-N4A-NIR NOZZLE INNER B-D B3.100 RPV ISII-54-1 UT No RADIUS & BORE l

RPV N4B-NIR NOZZLE INNER BD B3.100 RPV 1S1-1-54-1 UT No RADIUS & BORE RPV-N4C-NIR NOZZLE INNER B-D B3.100 RPV ISI-I-54-1 UT No RADIUS & BORE RPV-N4D-NIR NOZZLE INNER B-D B3.100 RPV 1S1-1-54-1 UT No RADIUS & BORE RPV-N9A-NIR NOZZLE INNER RADIl>S B-D B3.100 RPV ISI-I-54-1 UT No RPV-N I A-NV NOZZLE TO VESSEL B-D B3.90 RPV 1S1-1-54-1 UT No RPV N2A NV NOZZLE TO VESSEL B-D B3.90 RPV 1S1-1-54-1 UT No RPV-N2B-NV NOZZLE TO VESSEL B-D B3.90 RPV 1S1-1-54-1 UT No RPV-N2C-NV NOZZLE To VESSEL B-D B3.90 RPV 151-I-54-1 UT No RPV-N4A NV NOZZLE TO VESSEL B-D B3.90 RPV 15!l34-1 t,T No RPV-N9A NV NOZZLE TO VESSEL B-D B3.90 RPV 1S1 1-54-1 UT No 14-A-1 SAFE END TO NOZZLE B-F B5.10 RPV 1S1-1-14-1 UT AUTO No 14-B-1 SAFE END TO NOZZLE B-F B5.10 RPV 151-1 14 1 PT UT AUTO No 2R-N1A-1 NOZZLE TO SAFE END B-F B5.10 RPV ISI-1-21'-B PT UT AUTO No 2R-N2A-1 SAFE END TO NOZZLE B-F B5.10 RPV ISI-12R-A PT UT AUTO No 2R-N28j SAFE END TO NOZZLE B-F B5.10 RPV ISI-I-2R-A PT UT AUTO No 2R-N2C-1 SAFE END TO NOZZLE B-F B 5.10 RPV ISI-I 2R-A PT UT AUTO No 3-I- 1 NOZZLE TO CAP B-F B5.10 RPV ISI-l-3-1 UT No 6-N4 A-1 SAFE END TO NOZZLE B-F B5.10 RPV 151-1-6 1 MT UT No 6 N4B-1 SAFE END TO NOZZLE B-F B510 RPV 1S1-1-6-1 MT UT No Pace 1 of 10 L

, Encinure (C)

PILGRIM NUCLEAR POWER STATION

! ASME XiINSERVICE INSPECTION PLAN FOR 1999 ON-LINE AND l-REFUEL OUTAGE 12 EXAMINATIONS arseni"nox c^'econv coatt" svstr^' 's">'tT"'c cmussect _

ex^^' _ ox-'ist i

6-N4C-1 SAFE END TO NOZZLE B-F B5.10 RPV ISI-I 1 M T UT No l i

6-N4D-1 SAFE END TO NOZZLE BF B5.10 RPV 1S1-1-61 MT UT No RPV N9A-1 NOZ?.LE 'lO SAFE END B-F B5.10 RPV ISI-I 54-4 PT UT No 14 A-10A VALVE TO PIPE B-F B5.130 CS ISI-I-14-1 UT AUTO No i l

14-A 3 PIPE TO REDUCER B-F B5.130 CS 1S1-1-14-1 PT UT AUTO No l l

14-B-10A VALVE TO PJPE B-F B5.130 CS 1S1-1 14 1 PT UT AUTO No l 14-B-3 PIPE TO REDUCER B-F B5.130 CS 1S11-14-1 PT UT AUTO No RPV-N16A R-1 NOZZLE TO SAFE END B-F B5.20 RPV 1S1 1-54-4 PT No 2 PB-20l A PUMP BOLTING B-G-1 B6.180 RECIRC ISt i-2R-A UT No 2-PB-2010 PUMP BOLTING B-G-1 B6.180 RECIRC ISI-I-2R-B UT No l 2-PN-201 A PUMP NUTS B-G-1 B6.200 RECIRC ISI-1-2R-A VT-1 No l

, 14-VB-1400-25 A VALVE BOLTING B-G-2 B7.70 CS 1S1-1 14-1 VT-1 No l

14-VB-1400-25B VALVE BOLTING B-G-2 B7.70 CS 1S1-1-14-1 VT-1 Yes 6-vB-58 A VALVE BOLTING B-G-2 B7.70 FW 1S1-1-6-1 VT-1 No 6-VB-58B VALVE BOLTING B-G-2 B7.70 FW ISI-1-6-1 VT-1 No 1-VB-203 2C VALVE BOLTING <2' B-G-2 B'.70 MS ISI-1-1-I Sil2 VT-1 No 1-VB-203-2D VALVE BOLTING <2' B-G-2 B7.70 MS 151-11-1S112 VT-1 No l-VB-203-3 A VALVE BOLTING <2' B-G 2 B7.70 MS 1S1-1-1-1 S111 VT-1 No 1 VB-203-3B VALVE BOLTING <2' B-G-2 B7.70 MS 151-1-1-1S111 VT-1 No 1-VB-203-3C VALVE BOLTING <2' B-G-2 B7.70 MS 1S1-1 1-1 Sill VT-1 No 1 VB-203-3D VALVE BOLTING <2' B-G-2 B7.70 MS IS!-I-t -l S!!! VT-1 No I-VB-203-4 A VALVE BOLTING <2' B-G-2 B7.70 MS 151-I-1-1S111 VT-1 No 1-VB-203-4B VALVE BOLTING <2' B-G-2 B7.70 MS 151-1-1-15111 VT-1 No 13 VB-1301-49 VALVE BOLTING B-G-2 B7,70 RCIC 1S1 1-13-1 VT-l Yes Page 2 of 10

Encl sure(C) i PILGRIM NUCLEAR POWER STATION I

ASME XI INSERVICE INSPECTION PLAN FOR 1999 ON-LINE AND f

REFUEL OUTAGE 12 EXAMINATIONS  ;

C031PONENT_ DESCRIPTION CATEGORY CODE ITE31 SYSTE31 ISO)1ETRIC EXA31 ON-LINE l 13-VB-1501 50 VALVE BOLTING B-G-2 B7.70 RCIC 1S1-1-13-1 VT-1 No i i

12 VB-12015 VALVE BOLTING B-G-2 B7.70 RWCU ISI-1-12-.lSH I VT 1 No l

12-VB-1201-81 VALVE BOLTING B-G-2 B7.70 RWCU 1S1-1-12-2 VT-1 Yes j l

1 12-VB-1201-85 VALVE BOLTING B-G-2 B7.70 RWCU ISI-I-12-ISill VT-l No l 14-A-19 VALVE TO PIPE B-J B9.11 CS I.01-1-14 1 UT No 14R-A-16 PENETRATION TO B-J B9.11 CS 1S1-I-14-1 PT UT No ELBOW 14R-B-16 P2 JETRATION TO B-J B9.11 CS ISI-1-14-1 PT UT No ELBOW l 14R-B-21 A PIPE TO PIPE B-J B9.11 CS 1S1-1 14-1 UT No 6-N4A-7 PIPE TO ELBOW B-J B9. l l FW 1S1-1-6-1 MT UT No I-A-15 FLUED ilEAD TO PIPE B-J 89.11 MS ISI-l-1-ISH2 MT UT No l l-A-7 ELBOW TO ELBOW B-J B9.11 MS ISI-1-1-ISHI MT UT No 1-A-8 ELBOW TO PIPE B-J 89.11 MS ISI-I-1-I SH 1 MT UT No l

l l-A-9 PIPE TO ELBOW B-J B9.11 MS ISI-1-1-ISHI MT UT No l

2R NI A 10 PIPE TO VALVE B-J B9.11 RECIRC ISI-1-2R-B PT UT No 2R-Ni A-8 ELBOW TO PUMP B-J B9.11 REClRC ISI-I-2R-B PT UT No 1

2R-Ni A-9 PUMP TO PlPE B-J B9.11 REClRC ISI-I 2R-B PT UT No 2R-N I B-10 ELBOW TO PUMP B.J B9.11 RECIRC ISl-I-2R-A PT UT No 2R-N 1 B-11 PUMP TO PIPE B.J B9.11 RECIRC ISI-1-2R-A PT UT No 10- A-14 PIPE TO FLUED HEAD B-J B9.11 RHR 1S1-1-10-1 PT UT No 10-I A-15 VALVE TO PIPE B-J 89.11 RHR 151 1-10-1 PT UT No 10R-I A-12 PENETRATION TO B-J 89.11 RilR 151-1-10-1 PT UT No ELBOW 10R-1B-14 PIPE TO FLUED HEAD B.J B9.1 i RilR 1S1-1 10-1 PT UT No 10R-1B-5 VALVE TO ELBOW BJ 89.11 RilR ISI-I 1 PT UT No 10R-O-12 ELBOW TO VALVE B-J B9.11 RHR ISI.1-10-I A PT UT No Pace 3 of 10

Enclosure (C)

PILGRIM NUCllAR POWER STATION TSME XI INSERVICE INSPECTION PLAN FOR 1999 ON-LINE AND REFUEL OUTAGE 12 EXAMINATIONS l l

COS!PONENT DESCRIPTION CATEGORY CODE ITESl SYSTESI ISOMETRIC EXAM ON-LINE 10R-O-6 45 ELBOW TO PIPE B-J B9.11 RHR ISI-I-10-1 A PT UT No 10R-O-7 PIPE TO VALVE BJ B9.11 RHR 1S11 10-1 A PT UT No 10R-O-8 VALVE TO ELBOW B-J B9.11 RHR ISI-I-10-I A PT UT No 10R-O-9 ELBOW TO PIPE B-J B9.11 RHR ISI I-10-I A PT UT No 12-126 ELBOW TO PIPE B-J B9.11 RWCU ISI-l-12-2 UT No 12-1-27 PIPE TO ELBOW B-J B9.11 RWCU ISI-I-12 2 UT No 12R-O-23 ELBOW TO dJ 89.11 RWCU ISI I-12-ISH 1 PT UT No PENETRATION 1-BR-1 PIPE TO WELDOLET B-J B9.31 MS ISI-1-1-ISHI MT UT No 2R-nib 9BC-1 BR CONN TO ELBOW B-J B9.31 RECIRC ISI-1-2R-A PT UT No 12R-O-l PIPE 70 SWEEP-O-LET B-J B9.31 RWCU 1S1-1 12-1SHI ' T UT No B.II-159 PIPE TO VALVE B-J B9.40 SBLC 1S1-1-11-1 PT No B-11-320 ELBOW TO PIPE B-J 89.40 SBLC 1S1-1 11-1 PT No B-11-321 PIPE TO ELBOW B-J 89.40 SBLC ISI-I-l 1-1 PT No B-11-322 ELBOW TO PIPE B-J 89.40 SBLC 1S1-1 11-1 PT No B-l l-323 PIPE TO ELBOW B-J 89.40 SBLC 1S1 1-11-1 PT No ,

l i

l-A-8HLl(8) SUPPORT LUGS B-K-1 B10.10 MS ISI I t-ISHI M1 No 1

2R NIB-14HL2(4) 4 HANGER LUGS B-K-1 B10.10 RECIRC ISI-1-2R-A PT No GB-10-174HLl(2) SUPPORT LUGS C-C C3.20 RHR IS' .-10-3B MT No HB-10-83HLl(4) SUPPORT LUGS C-C C3.20 RHR 1S1-I-10-1 B MT No DB/DC-14 3001-4-1 PIPE TO PIPE C-F-1 C5.1 i CS 1S1-1-14-2B PT UT No DB/DC-14-3002-5-1 ELBOW TO PIPE C-F-1 C5. l l CS ISI I 14-2A PT UT No s

DC-14-Fi PIPE TO VALVE C-F 1 C5.11 CS 1S1-1141 UT No Pane 4 of 10

, Enctisure (C)

PILGRIM NUCLEAR POWER STATION ASME XI INSERVICE INSPECTION PLAN FOR 1999 ON-LINE ANb-REFUEL OUTAGE 12 EXAMINATIONS CO311'ONENT__DESCRII" TION CNI'EGORY CODE ITE}31 __SYSTE31 ISO 31ETRIC EXA51 ON-LINE DC-14-F31 PlPE TO VALVE C-F-1 C5.11 CS ISI-1-14-1 PT UT No DB/DC 10-3001-2-1 ELBOW TO PIPE C-F-1 C5.11 RHR ISl-I-10-4BSill PT UT No DB/DC-10-3002-3-3 PIPE TO P!PE C-F-l C5. I l RHR ISI i-10-4 ASH 2 PT UT No DC-10-F10R PIPE TO VALVE C-F-1 C5.11 RliR ISI l 10-4BSHI PT UT No DC-10-F9 PIPE TO VALVE C-F-! C5.11 RilR ISI-l.10-4 ASH 2 UT No liL-14-F4 NO7.ZLE TO PIPE C-F-2 C5.51 CS ISI-1-14 2A MT UT Yes

,HB-23-F75 PIPE TO TEE C-F-2 C5.51 IIPCI ISI-I-23-3 MT UT Yes HB 23-F87 REDUCER TO PIPE C-F-2 C5.51 flPCI 1S1-1-23-3 MT UT Yes llL-23-F67 PIPE TO NOZZLE C-F-2 C5.51 HPCI ISI-I-23-3 MT UT Yes f

flL-13 2-3C ELBOW TO PIPE C-F-2 C5.51 RCIC ISI-I-13-3 MT UT Yes I l

G B-10-14-3 D-1 TEE TO PIPE C-F-2 C5.51 RHR ISI-I 10-3B MT UT Yes G B-10-F124 PUMP TO PIPE C-F-2 C5.51 RilR ISI I-10-3A MT UT Yes GB-10 F129R PIPE TO HX C-F-2 C5.51 RHR ISI I-10-3 A MT UT Yes GB-10-F 167 PUMP TO PIPE C 7-2 C5.51 RilR 1S1-1 10-3 B MT UT Yes GB-10-F171 ELBOW TO VALVE C-F-2 C5.51 RiiR 1S1-110-38 MT UT Yes GB 10-Fl77 PIPE (HX) TO PIPE C-F-2 C5.51 RHR 1S1-1-10-3B MT UT Yes llB 10-F145 FLANGE TO PIPE C-F-2 C5.51 RilR ISI-I-10-2B MT UT Yes lil,-10-F100 NOZZLE TO PIPE C-F-2 C5.51 R11R ISI I-10-2B MT UT Yes liL-10-F136 ELBOW TO VALVE C-F-2 C5.51 RIIR ISI-I-10-2B MT UT Yes HB 23-2-lli FLANGE TO PIPE C-F-2 C5.70 HPCI ISI-I-23-3 MT Yes GB 10-18-4C WELDOLET TO P!PE C-F-2 C5.8 i RilR ISI-1 10-3 A MT UT Yes

}IE-30-130PS STANCillON D-B D2.20 RBCCW 151 I 30-15111 VT 3 Yes llE-30-131PS STANClllON D-B D2.20 RBCCW 151-I 30-1S111 VT 3 Yes llE-301324HL HANGER LUG DB D2.20 RBCCW ISI t-30-ISHI VT-3 Yes Pace 5 of 10

r Enclosure (C)

PILGRIM NUCLEAR POWER STATION ASME XI INSERVICE INSPECTION PLAN FOR 1999 ON-LINE AND REFUEL OUTAGE 12 EXAMINATIONS COSIPO,NENT DESCRIPTION CATEGORY CODE ITEM SYSTESI ISOMETRIC EXA31 ON-LINE llE-30-IllL HANGER LUG D-B D2.20 RBCCW ISI-1-30-2SH2 VT-3 Yes flE-30-2851st HANGER LUG D-B D2.20 RBCCW 1S1-I-30-1S111 VT 3 Yes l 1

IIE-30-294PS STANCHlON D-B D2.20 RBCCW ISI-I-30-ISH1 VT-3 Yes HE-30-30HL HANGER LUG D-B D2.20 RBCCW ISI-t-30-2SH2 VT-3 Yes lie-30-36HL llANGER LUG D-B D2.20 RBCCW ISI-I-30-I SH2 VT-3 Yes llE-30-3711L(4) IIANGER LUGS D-B D2.20 RBCCW ISI-1-30-ISH2 VT-3 Yes H E-30-41 fiL(4) IIANGER LUGS D-B D2.20 RBCCW ISI-1-30-ISil2 VT-3 Yes HE-30-42HL HANGER LUG D-B D2.20 RBCCW IS! I 30-1SH2 VT-3 Yes l IWE-GVWD-01 GENERAL VISUAL E-A El .11 CONT ISI-lWE-AUG-1 VISUAL No WALKDOWN 1

IWE-ANNDRN-080 ANNULUS DRAINS (2) AT E-C E4.11 CONT ISI-lWE-AUG 1 VT-2 No 80 AZ.

I IWE-ANNDRN-170 ANNULUS DRAINS (2) AT E-C E4. l l CONT ISI-lWE-AUG-1 VT-2 No j 170 AZ. l 1

IWE-ANNDRN-260 ANNULUS DRAINS (2) AT E-C E4.ll CONT ISI-IWE-AUG 1 VT-2 No 260 AZ.

1 IWE-ANNDRN-350 ANNULUS DRAINS (2) AT E-C E4.l l CONT ISI-IWE-AUG-1 VT-2 No 350 AZ.

lWE-LINERDRAINS LINER DRAINS E-C E4. l l CONT ISI-IWE-AUG 1 VT-2 No l IWE-VENT-157 AUGMENTED VENT PIPE E-C E4.11 CONT ISI lWE-AUG-1 VT-l (2 Sided) No AT 157 AZ IWE-VENT-202 AUGMENTED VENT PIPE E-C E4.11 CONT ISI-lWE-AUG-1 VT-I (2-Sided) No AT202 AZ IWE-VENT-292 AUGMENTED VENT PIPE E-C E4.11 CONT ISI-!WE-AUG-1 VT-1 (2-Sided) No AT 292 AZ IWE-VENT-337 AUGMENTED VENT PIPE E-C E4. l l CONT ISI-lWE-AUG-1 VT-1 (2-Sided) No AT 337 AZ IWE-SNDCUSil-125 AUGMENTED DRYWELL E-C E4.12 CONT ISI-lWE-AUG-1 UT No UT AT 9 FT 125 AZ.

IWE SNDFUSif-305 AUGMENTED DRYWELL E-C E4.12 CONT ISI lWE-AUG-1 UT No UT AT 9 FT 305 AZ.

Page 6 of 10

7

+

, Enclosure (C)

PILGRIM NUCLEAR POWER STATION ASME XI INSERVICE INSPECTION PLAN FOR 1999 ON-LINE AND REFUEL OUTAGE 12 EXAMINATIONS COMPONENT DESCRIPTION CATEGORY CODE ITEM SYSTEM ISOMFTRIC EXAM ON-LINE I, IWE-TOR US. AUGMENTED TORUS UT E-C E4.12 CONT ISI-lWE-AUG-1 UT Yes LOWER B1 elev.-Ilft 6in BAY l l

IWE-TORU; AUGMENTED TORUS UT E-C E4.12 CONT ISI-lWE-AUG-1 UT Yes LOWER-Bl3 elev. Ilft 6 n BAY 13 IWE-TORUS. AUGMENTED TORUS UT E-C E4.12 CONT IS!-lWE-AUG 1 UT Yes LOWER B5 elev.-Ilft 6in BAY 5 iWE-TORUS- AUGF 'ENTED TORUS UT E-C E4.12 CONT ISI-lWE-AUG-1 UT Yes LOWER B9 elev. .Ift 6in BAY 9 JWE-TORUS-MWL- AUGMENTED TORUS UT E-C E4.12 CONT ISI-lWE-AUG-1 UT Yes Bl AT MWL BAY l IWE-TORUS-MWL- AUGMENTED TORUS UT E-C E4.12 CONT ISI-lWE-AUG-1 UT Yes B13 AT MWL BAY 13 IWE-TORUS-MWL- AUGMENTED TORUS UT E-C E4.12 CONT ISI-lWE-AUG 1 UT Yes B5 AT MWL BAY S IWE-TORUS-MWL- AUGMENTED TORUS UT E-C E4.12 CONT ISI-lWE- AUG-1 UT Yes B9 AT MWL BAY 9 ,

JWE UPDW-72-252 AUGMENTED DRVWELL E-C E4.12 CONT ISI-lWE- AUG-1 UT No UT AT 72 FT 252 A7.. )

l IWE UPDW-83-252 AUGMENTED DRYWELL E-C E4.12 CONT ISI lWE-AUG-1 LTF No )

UT AT 83 FT 252 AZ. )

l IWE-UPDW 83 288 AUGMENTED DRYWELL E-C E4.12 CONT ISI-lWE-AUG-1 UT No j Ur AT 83 FT 288 AZ. l I

                  • l l

lWE-MB-DW-09 MOISTURE BARRIER AT E-D E5.30 CONT ISI lWE-AUG-1 VT-3 No l DRYWELL 9 FT l

IWE-CB-DWilEAD CONTAINMENT BOLTING E-G E8.10 CONT N/A VT-1 No IWE-CB-GIBS 270 CONTAINMENT BOLTING E-G ES.!0 CONT N/A VT-1 No IWE-CB X2008 CONTAINMENT BOLTING E-G E8.10 CONT N/A VT-1 No IWE-CB-X203 A CONTAINMENT BOLTING E-G E8.10 CONT N/A VT 1 No IWE-CB-X203B CONTAINMENT BOLTING E-G E8.10 CONT N/A VT-1 No IWE-CB-X203C CONT AINMENT BOLTING E-G E8.10 CONT N/A VT-1 No IWE-CB-DWilEAE CONTAINMENT BOLTING E-G E8.20 CONT N/A VT l No IWE-CB-GIBS 270 CONTAINMENT BOLTING E-G E8.20 CONT N/A VT 1 No Pasrc 7 of 10

Enclosure (C)

PILGRIM NUCLEAR POWER STATION

! ASME XI INSERVICE INSPECTION PLAN FOR 1999 ON-LINE AND j -

REFUEL OUTAGE 12 EXAMINATIONS

. - - - -COM[ONEE,F DESCRII TION CATEGORY CODi(ITEM _ _

SYSTEM ISOMETRIC _ _ _ _

EXAM ON-LINE lWE-CB-X2008 CONTAINMENT BOLTING E-G E8.20 CONT N/A VT-1 No IWE-CD-X203A CONTAINMENT BOLTING E-G E8.20 CONT N/A VT-1 No iWT-CB-X203B CONTAINMENT BOLTING E-G E8.20 CONT N/A VT-l No IWE-CB-X203C CONTAINMENT BOLTING E-G E8.20 CONT N/A VT-1 No 11-23 1-75 RIG!D llANGER F-A F1.10 A IIPCI 1S1-1-23-1 VT-3 No H-13 1 7SS RIGID llANGER FA Fl .10-A RCIC 1S1-1-13-1 VT-3 No 11 10-1-48S11 RIGID ilANGER F-A Fl .10- A RllR ISI-1-10-1 A VT-3 Yes 11 11 1-19 RIGID ilANGER F-A Fl .10-A SBLC 1S1-1 11-1 VT-3 No ll 1-1-X; A ANCHOR F-A Fl .10-B MS ISl-I l-ISil2 VT-3 No H-131-X53 ANCllOR F-A Fl .10-B RCIC ISI-l 13-1 VT-3 Yes ll-12 14SG RIGID RESTRAINT F-A Fl .10-B RWCU ISI-I-12-2 VT-3 Yes H-12 1-SS A ANCHOR F-A Fl.lu-B RWCU 1S1-1-12 2 VT-3 Yes 11-11-1 18 GUIDE F-A F l .10-B SBLC 1S11-11-1 VT-3 No 11 11 1-30 GUIDE FA Fl.10-B SBLC 1S11-11-1 VT-3 No ,

11-l l- 1 -32 GUIDE F-A F1 10-B SDLC 1S1-1 11-1 VT-3 Yes ll-14-1 15S SNUBBER FA Fl.10-C CS 1S1-1-14 1 VT-3 No ll 1 1-HAl SPluNG HANGER F-A Fl .10-C MS ISI-1 1-I SH I VT-3 No 11-2-1-111 8 SPRING HANGER F-A F l .10-C RECIRC ISI-l-2R-A VT-3 No H-2-1 -SS2 SNUBBER F-A Fl .10-C RECIRC ISI t-2R.A VT-3 No  ;

l H-2-1-SS20 SNUBBER F-A Fl .10-C RECIRC ISI-t-2R-A VT-3 No i H-2-1-SS21 SNUBBER F-A F l .10-C RECIRC ISI-1-2R-A VT-3 No H-2-1-SS22 SNUBBER F- A F l.10-C RECIRC ISI-l-2R A VT-3 No II 10-1-177 JNG HANGER F-A Fl 10-C RilR ISI!-10-1A VT-3 No H-12-1-14 SPRING HANGER F-A Fl .10-C RWCU ISI I-12-ISH I VT-3 No

!!-45-1 1 RIGID ilANGFR F-A F l .20-b CACS ISl 150-1 VT-3 No Pace 8 of 10 m

, Enctisure (C)

PILGRIM NUCLEAR POWER STATION ASME XI INSERVICE INSA ECTION PLAN FOR 1999 ON-LINE AND 1

REFUEL OUTAGE 12 EXAMINATIONS COMPONENT DESCRIPTION 0 ISOMETRIC EXA31 ON-LINE

_ }TEGORY CODE ITEM SYSTEM 11-3-1-48 RESTRAINT F-A F t.20-B CRD ISI-I-3-1 VT-3 Yes H-3 1-49 RESTRAINT F-A Fl .20-B CRD ISI I-3-l VT 3 Yes li 14-1-20S RESTRAINT F-A Fl .20-B CS ISI-I-14-2 A VT-3 Yes 11 14-1-22 RIGID SUPPORT F-A Fl .20-B CS ISI 1 14-2A VT-3 Yes

!!-14 1-4 RIGID liANGER FA Fl .20-B CS ISI-I 14-2.A VT3 Yes H-23-1-21 S A ANCHOR F-A Fl .20-B HPCI ISI-1-23 5 VT-3 Yes 11-23-1-30 RIGID HANGER F-A Fl.20-B IIPCI 1S1-1-23 5 VT-3 Yes 11-13-1 27 RIGID SUPPORT F-A Fl.20-B RCIC ISI I-13 2 VT-3 Yes i

H-10-1-129 RIGID HANGER F-A Fl .20-B RHR ISl.1-10-4BSH I VT-3 Yes H-10-1-2 l SR LATERAL RESTRAINT F-A Fl 20-B RHR ISI-I 10-2A /T-3 Yes H-45 1-4 SPRING HANGER F-A Fl .20-C CACS ISI-I-50-1 VT-3 Yes H-3-1-21 SPRING HANGER F-A Fl .20-C CRD ISI-I-3-1 VT-3 Yes {

11 14-1 29 SPRING IIANGER F-A Fl .20-C CS ISI-1-14-2A VT-3 Yes H 23-133 SPRING HANGER FA Fl .20-C HPCI 1S1-1-23-5 VT-3 Yes H 23-Is '

SNUBDER F-A Fl .20-C HPCI 151-1-23-3 VT-3 No r

H 10-1 144 SPRING HANGER F-A F l .20-C RilR ISI-I-10-3 A VT-3 Yes l l

H-10-1-197 SPRING HANGER F.A F1.20-C RHR ISI-l-10-4 ASII2 VT-3 Yes  !

!! 10-1-22SH SPRING SUPPORT F-A Fl .20-C RHR ISI-I-10-2 A VT-3 Yes H-10-133Sil SPRING HANGER F-A F t .20-C RHR 1S1 I-10-2B VT-3 Yes li 10-1-5SS SPRING SUPPORT F-A Fl .20-C RHR ISI-I-10-3 A VT-3 Yes i

H-30-1-135 RIGID HANGER F-A Fl .30-A RBCCW ISI-1-30-2SH I VT-3 Yes H 30-1-43SH RIGID HANGER F-A Fl .30-A RBCcW ISI-I-30-1Sil2 VT-3 Yes ,

I H-30-1 -65 RIGID HANGER FA F l .30- A RBCCW ISI-130 2SH1 VT-3 Yes  !

H-29 1-27 !GID tlANGER F-A Fl .30-A SSW 1S1-1 29 1S112 VT-3 Yes  ;

l H 291-863 PIPE RESTRA!NT FA Fl .30-A SSW .lSI-1-2'>-I SH I VT-3 Yes f

11 30-1-131 RIGID ilANGER FA Fl .30-B RBCCW ISI-1-30-ISHI VT 3 Yes

- H-29-1 5 RIGID il ANGER F-A Fl .30-B SSW ISI 1-29-ISH I VT-3 Yes j i -

Page 9 0f 10

o

+

, Enclosure (C)

PILGRIM NUCLEAR POWER STATION j ASME XI INSERVICE INSPECTION PLAN FOR 1999 ON-LINE AND REFUEL OUTAGE 12 EXAMINATIONS CATEGORY CODE ITEM SYSTEM ISOMETRIC EXAM ON LINE

--COSIPONENT__ DESCRIPTION __

fi-30-1-40SH SPRING HANGER F-A Fl .30-C RBCCW ISI-I 30-1SH2 VT 3 Yes 1-1-50 TORUS SUPPORTS F-A Fl.40B CONT Cl Al75 Sill & CI A- VT-3 Yes j TORUSDAYl3 62-4 Il-50-1-270 GIBS DRYW ELL STABILIZER F-A Fl.40C CONT ISl-lWE-AUG-1 VT-3 No 11-2 0-1-7 GUIDF F-A-Cl 4 F l .20-B RWCU 1S1 1 12-lS112 VT-3 No l

l I

i f

i l

l l

t Pue 10 of 10