T TT f UNITED STATES NUCLEAR REGULATORY COMMISSION 8' b $d 10 W ASHIN GTON, D. C. 20555 s
June 11,1975 F. Schroeder, Acting Director, Division of Technical Review, NRR TECHNICAL ASSISTANCE REQUEST NO. ORB-2-159 PLANT NAME:
Pilgrim Unit 1 DOCKET NUMBER:
50-293 BRANCH CODE: ORB-2 PROJECT MANAGER:
Paul W. O'Connor (ext. 7403) 7 TECHNICAL REVIEW BRANCH:
Radiological Assessment Branch REQUESTED COMPLETION DATE: June 30, 1975 DESCRIPTION OF REQUEST:
Because the Pilgrim iodine effluent limits have been recalculated based on the real cow, the Office of the Executive Legal Director has requested us to determine whether the technical specifications for facilities such as Pilgrim Unit 1, whose limits are based on the real cow, should require a cow census be performed to comply with the Regulatory position stated in Regulatory Guide 1.42, Section C.2.c(3).
Please determine the need to incorporate a cow census in the technical specifications i
for plants such as Pilgrim Unit 1 that are implementing effluent release limits based on a real cow after having operated with a limit previously calculated using a " fence-post" 2 A cow.
If a cow census specification is needed for plants of this type, please' prepare a model technical specification and bases for incorporation in existing specifications.
\\
- a. m tW M p,.ww.'>- /
s S
Dennis L. Ziemann, C ief Operating Reactors ranch #2 Division of Reactor Licensing cc:
J. Kastner K. Go'ler
{
T. Carter S. Varga i
f