' LIMITING CONDITION FOR OPERATION SURVEILLANCE RE0UTREMENT 4.5.H Maintenance of Filled Discharae Pipe (Cont'd) 3.
Whenever the HPCI or RCIC system is lined up to take suction from the torus, the discharge piping of the HPCI l
and RCIC shall be vented from the high point of the system and water flow observed on a monthly basis.
9409150041 940906 PDR ADOCK 0500r 3
Amendment No. 39, 135 112
BASES:
3.5.H Maintenance of Filled Discharae Pipe If the discharge piping of the core spray, LPCI system, HPCI, and RCIC are not filled, a water hammer can develop in this piping when the pump and/or pumps are started. An analysis has been done which shows that if a water hammer were to occur at the time at which the system were required, the system would still perform its design function.
However, to minimize damage to the discharge piping and to ensure added margin in the operation of these systems, this Technical Specification requires the discharge lines to be filled whenever the system is in an operable condition.
An acceptable method of ensuring that the discharge lines are full is to i
vent them at their high points. The monthly frequency is based on the gradual nature of void buildup in the ECCS piping, the procedural controls, and operating experience.
j i
i f
J l
i 1
I i
i 4
1 Amendment No. 135 121
Attachment C to BECo Letter 94-098 Marked up Technical Specification Pages i
t i
l i
I I
l l
l 1
i
LIMITING CONDITION FOR OPERATION SURVEILLANCE REOUIREMENT e
4.5.H Maintenance of Filled Discharae Pine (Cont'd) 3.
Whenever the NPCI or RCIC system is lined up to take suction from the torus, the discharge piping of the HPCI and RCIC shall be vented i
from the high point _of the system l
and water-flow observed on a monthly basis.
n witches Atch-mnnitnr the ditcharae lines to
- ansere that_thay-ara MLshaM-be-
_ functionally tested-every-month i
1 and calibrated every three-months, i -
\\
1 i -
i i
i 1
i i
1 I
i 1
1 I
i f
I l
t i
l 6
112
s BASES:
l
'3.5.H Maintenance of Filled Discharae Pine If the discharge piping of the core spray, LPCI system, HPCI, and RCIC are not
'l j
filled, a water hammer can develop in this piping when the pump and/or pumps are started. An analysis has been done which-shows that if a water hammer were to occur at the time at which the system were required, the system would i
still perform its design function.
However, to minimize damage to the discharge piping and to ensure added margin in the operation of these systems, j
this Technical Specification requires the discharge lines to be filled whenever the system is in an operable condition.