ML20206K259

From kanterella
Jump to navigation Jump to search
Forwards Amend 10 to License DPR-35,per 750402 Request & 750522 Suppl.Amend Revises Airborne Effluent Release Limits to Provide Assurance That Releases of Radioactive Iodines & Particulates w/half-lives Greater than 8 Days Alap
ML20206K259
Person / Time
Site: Pilgrim, 05000000
Issue date: 05/23/1975
From: Ziemann D
Office of Nuclear Reactor Regulation
To: Feldmann M
BOSTON EDISON CO.
Shared Package
ML20204E974 List:
References
FOIA-86-58 NUDOCS 8606300058
Download: ML20206K259 (2)


Text

~

' 7

.. p

% t'

, UNITED STATES NUCLEAR REGULATORY COMMISSION W ASHINGToN, D. C. 20555 May 23, 1975 Docket No. 50-293 Boston Edison Company ATTN: Mr. Maurice J. Feldmann Vice President Operations and Engineering 800 Boylston Street Boston, Massachusetts 02199 Gentlemen:

The Commission has issued the enclosed Amendment No. 10 to Facility License No. DPR-35 for the Pilgrim Nuclear Power Station. This amendment includes Change No. 12 to the Technical Specifications and is in response to your request dated April 2, 1975 and a supplement thereto dated May 22, 1975.

This amendment revises the Pilgrim Nuclear Power Station Unit I airborne effluent release limits in a manner to provide reasonable assurance that releases 'of radioactive iodines and particulates with half lives greater than eight days to unrestricted areas would be as low as practicable.

Copies of the related Safety Evaluation and the Federal Register Notice also are enclosed.

Sincerely,

( ,

j 4wy% i

['7d /Wae Dennis L. Ziemann,[. hief Operating Reactors Branch #2

  • Division of Reactor Licensing

Enclosures:

1. Amendment No. 10 to License No. DPR-35 w/ Change No. 12
2. Safety Evaluation
3. Federal Register Notice cc w/ enclosures: ,

See next page f"" %g

, b  ?

i J l O?e-191

  • khkOUh 8 860613 l BURNSTEIB6-58 PDR g / *2-1

r ,

j a t. V Boston Edison Company May 23, 1975 cc w/ enclosures: cc w/ enclosures and BEC's Mr. Dale G. Stoodley, Counsel filings of 4/2/75 and Boston Edison Company 5/22/75:

800 Boylston Street Henry Kolbe, M. D.

Boston, Massachusetts 02199 Acting Commissioner of Public Health Mr. J. Edward Howard, Superintendent Massachusetts Department of Nuclear Engineering Department Public Health Boston Edison Company 600 Washington Street 800 Boylston Street Boston, Massachusetts 02111 Boston, Massachusetts 02199 Mr. Wallace Stickney Mr. Grant Baston, Pilgrim Division Head Environmental Protection Agency Boston Edison Company JFK Federal Building.

RFD #1 Rocky Hill Road Boston, Massachusetts 02203 Plymouth, Massachusetts 02360 Mr. Winfield M. Sides , Jr.

Quality Assurance Manager I 800 Boylston Street Boston, Massachusetts 02199 i

Anthony Z. Roi,sman, Esquire Berlin, Roisman and Kessler 1712 N Street, N. W.

Washington, D. C. 20036 i

Plymouth Public Library North Street Plymouth, Massachusetts 02360 Mr. J. E. Larson l Senior Licensing Engineer I

and Co-ordinator Boston Edison Company 1 RFD #1 Rocky Hill Road Plymouth, Massachusetts 02360 Mr. David F. Tarantino Chairman, Board of Selectman 11 Lincoln Street Plymouth, Massachusetts 02360 b

~

s v

-