ML20206K439
See also: IR 05000293/1975002
Text
_ _ - _ _
"
,
,.
~
@
'
'
UNITE 3 STATES
'
NUCLEAR REGULATORY COMMISSION
a - h.+e
ItEGION I
sSt PARK AVENUE .
KlNG oF PRUSSIA. PENNSYLVANSA 19404
Boston Edison Company
License No. DPR-35
Attention: Mr. M. J. Feldmann
Inspection No. 50-293/75-02
Vice President and Director
i
of Operations and Engineering
800 Boylston Street
,,
Boston, Massachusetts 02199
,.
g,
Centlemen:
i},
This refers to the inspection conducted by Mr. Hyson of this office
1.
on January 16 and 17, 1975 at the Pilgrim I Nuclear Power Station of
activities authorized by AEC License No. DPR-35 and to the discussions
of our findings held by Mr. Hyson with Mr. Baston and other members
"
of your staff at the conclusion of the inspection.
.
Areas examined during this inspection are described in the Regulatory
Operations Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel,
and observations by the inspector.
During this inspection, it was found that certain of your activities
appeared to be in violation of AEC requirements. The items and
references to the pertinent requirements are listed in the enclosure
.
to this letter. This letter constitutes a notice sent to you pursuant
'c
to the provisions of Section 2.201 of the AEC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations. Although Section
2.201 requires you to submit to this office, within 20 days of your
..
receipt of this notice a written statement of explanation, we note
iC
that these violations were corrected prior to the completion of our
.
inspection and therefore, no response with respect to these matters
~
- is required.
.
In accordance with Section 2.790 of the AEC's " Rules of Practice",
,
Part 2, Title 10, Code of Federal Regulations, a copy of this
letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
>*
'
that you (or your contractor) believe to be proprietary, it is
-
necessary that you make a written application within 20 days to
<
this office to withhold such information from public disclosure.
[
a0#%
i
4
.
i
f
.
.
1
- //6*19 8
,
8606300092 860613
.j
l,
BURNSTEIB6-58
6-6
lL2
.
. - - _ --
.
. -
- - - - -
- - -' --
.
.
.
.
i
e
.
.
.
Bo ton Edison Company
-2-
.
Any such application must include a full statement of the
reasons on the basis of which it is claimed that the information
'
is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a
,
separate part of the document.
If we do not hear from you in
-
this regard within the specified period, the report will be
<
g
placed in the Public Document Room.
>
.
j
No reply to this letter is required; however, should you have any
'
i~.
questions concerning this inspection, we will be pleased to discuss
them with you.
"
'
Sincerely,
J' a ] s
Paul R. Nelson, Chief
Radiological and Environmental
,
i
Protection Branch
.
Enclosures:
1.
Description of Violations
2.
R0 Inspection Report No. 50-293/75-02
i -
s
cc:
W. M. Sides, Quality Assurance Manager
G. Baston, Pilgrim Division Head
.
.
E. F. Kearney, Project Engineering lbnager
+ 4 1
J. E. Larson, Senior Licensing Engineer and Coordinator
~
-
'A. Z. Roisman, Counsel for Citizens Committee for Protection of
-
the Environment (Without Report)
,
.
.
bec's: RO Chief, FS&EB
RO:HQ (4 cpys of ler., 5 cpys of report)
RO Files
-
' s.
Central Mail & Files
"
DL (4 cpys of ltr., 13 cpys of report)
.
RS (1 cpy of ler., 3 cpys of report)
'
Local PDR
State of Massachusetts
Reg Reg Reading Room
i
RO Directors (II, III, IV) (Report Only)
A. 2. Roisman. Counsel for Citizens Committee for Protection
'
of the Environment
1
m'
8 8
9
e
e
- L - - ---
- -
-
- -
-
- - - -
- -
-
- .
. - -
. -
.
.
- - - - - .
- - -
.
.
-
- .
. .
.
. .
- -
- -
. - - -
. - - - - . - - - - - -
-
- -
-