MONTHYEARML20196D0241999-06-16016 June 1999 Proposed Tech Specs Re Reactivity Control Incorporating Operating Requirements That Are Consistent with NEDO-21231, Banked Position Withdrawal Sequence ML20206R8161999-05-11011 May 1999 Proposed Tech Specs Re HPCI & RCIC Surveillance Testing ML20206H9771999-05-0505 May 1999 Proposed Tech Specs Modifying Licensing Basis for EDG on- Site Diesel Fuel Storage Requirements & Corresponding TSs ML20207F1171999-03-0303 March 1999 Proposed Tech Specs Page 3/4.6-13 Re Reactor Vessel Matl Surveillance Program Withdrawal Schedule ML20237E0851998-08-24024 August 1998 Proposed Tech Specs Pages Supporting Proposed TS Amend Related to EDG AOT ML20236X7191998-07-31031 July 1998 Proposed Tech Specs Page 3/4.9-5 Re Suppl to EDG for Allowed Outage Time ML20249C7101998-06-26026 June 1998 Proposed Tech Specs Correcting Typos & Updating Bases ML20249B3231998-06-15015 June 1998 Revised Complete Set of TS Pages Re Relocation of Radioactive Effluent TS & Radiological Environ Monitoring Program to ODCM ML20217F9341998-03-26026 March 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20217H2791998-03-25025 March 1998 Proposed Tech Specs 3.6.A.1 & 4.6.A.1,pertaining to Primary Sys Boundary,Thermal & Pressurizations Limitations & Surveillance Requirements & Basis 3/4.6.A ML20203D4981998-02-20020 February 1998 Proposed Tech Specs Pages,Incorporating Ultimate Heat Sink Temperature of 75 F Into TS 3/4.5.B & Bases,As Required by Amend 173 ML20217K5691997-10-24024 October 1997 Proposed Tech Specs Page Adding Footnote Declaring One Containment Isolation valve,30-CK-432,operate for Limited Period Despite Not Being within IST Interval for Reverse Flow Testing ML20211G2311997-09-12012 September 1997 Proposed Tech Specs Re Radiological Environ Monitoring Program Moved to ODCM ML20210K4381997-08-0808 August 1997 Revised TS Pages 3/4.5-7,B3/4.5-6 & B3/4/.5-7 Requiring Verification That SBO-DG Is Operable Prior to Voluntarily Entering LCO ML20196J0041997-07-22022 July 1997 Proposed Revised TS Bases for Section 3.5.F,correcting Volume of Water Available in Refuel Cavity & Dryer/Separator Pool When Flooded to Elevation 114 Ft & Revising Torus Water Volume to Reflect Volume Above Min Pump NPSH ML20136J5501997-03-0707 March 1997 Proposed Tech Specs Rev for Section 3.10, Core Alterations Allowing Removal of Suspect Fuel Bundles Out of Planned Sequence ML20134C9671997-01-24024 January 1997 Proposed Tech Specs 2.0 Re Safety Limits ML20133A6511996-12-23023 December 1996 Proposed Revised Tech Specs 1.0 Re definitions,3.4 Re Standby Liquid Control sys,3.5 Re Core & Containment Cooling systems,3.7 Re Containment Systems & 3.9 Re Auxiliary Electrical Sys ML20132E5491996-12-10010 December 1996 Proposed Tech Specs Table 3.2.C.1 Re Instrumentation That Initiates Rod Blocks,Table 3.2.C.2 Re Control Rod Block Instrumentation Setpoints & Table 4.2.C Re Minimum Test & Calibr Frequency for Control Rod Blocks Actuation ML20135C1461996-11-26026 November 1996 Proposed Tech Specs,Modifying Definition 1.M, Primary Containment Integrity, to Include All Instrument Line Flow Check Valves to Make Definition Consisten W/Lco 3/4.7.A.2.a.4 ML20134K4361996-11-0707 November 1996 Proposed Tech Specs Re Installation of BWROG Enhanced Option 1A ML20117K6551996-09-0505 September 1996 Proposed Tech Specs,Providing Revised TS Pages 3/4.5-7 & 3/4.5-6 ML20116M1561996-08-12012 August 1996 Proposed Tech Specs to Plant TS Section 6.0,Administrative Controls & Sections 6.5.B.10.C & 6.14 of Util Quality Assurance Manual ML20111B4201996-05-0101 May 1996 Proposed Tech Specs,Reflecting Implementation of 10CFR50 App J,Option B ML20108C1071996-05-0101 May 1996 Proposed Tech Specs,Relocating Administrative Controls Re QA Review & Audit Requirements of Section 6 from Plant TS to Boston Edison QA Manual ML20111C2761996-05-0101 May 1996 Proposed Tech Specs 3.1.1 Re Reactor Protection Sys (Scram) instrumentation,3.2.C.1 Re Instrumentation That Initiates Rod Blocks & 3/4.4 Re Standby Liquid Control ML20108C0581996-05-0101 May 1996 Proposed Tech Specs Re Core Alteration to LCO & Surveillance Conditions Associated W/Secondary Containment ML20108A6561996-04-25025 April 1996 Proposed Tech Specs Re Part of Overall Effort to Improve Outage Performance at Plant ML20095E0771995-12-0808 December 1995 Proposed Tech Specs Bases Page B2-2,including GE11 GEXL Correlation Axial Power Profile & R-factor Ranges & Correcting Error in GE11 GEXL Correlation Mass Flux Range in GE Design ref,NEDE-31152-P, GE Fuel Bundle Designs ML20092A4421995-08-31031 August 1995 Corrected Tech Spec Page Re Reactor High Pressure Trip Setting ML20086K2661995-07-14014 July 1995 Proposed Tech Specs Re Section 2.1,Bases:Safety Limits; Section 3.3.C,scram Insertion Times & Section 4.11.C, Minimum Critical Power Ratio to Reflect Use of Advanced GE-11 Fuel Design in Cycle 11 ML20078R6221995-02-15015 February 1995 Proposed Tech Specs Substituting for Pages Contained in Proposed TS Amends Submitted Prior to 950130 Authorization ML20078N4861995-02-0909 February 1995 Proposed Tech Specs,Increasing Reactor High Water Level Isolation Trip Level Setting ML20077M6921995-01-0909 January 1995 Proposed Reformatted Tech Specs & Bases ML20078K8151994-11-22022 November 1994 Proposed TS Pages 3/4.2-20 & 3/4.2-35 Re Tables 3.2.C-1 & 4.2.C ML20078K7961994-11-22022 November 1994 Proposed Tech Specs Re Changes to MSIV Leakage Requirement ML20077A8991994-11-22022 November 1994 Proposed Tech Specs Re Suppression Chamber Water Level ML20077B1861994-11-22022 November 1994 Proposed Tech Specs 3.5.F,4.5.F.1 & 3.9.B.1 & 2 Re EDG Allowed out-of-svc Time ML20072T0521994-09-0606 September 1994 Proposed Tech Specs Modification to Append a of Operating License DPR-35 Re Maintenance of Filled Discharge Pipe ML20072S0501994-09-0606 September 1994 Proposed Tech Specs Re Instrumentation That Initiates Primary Containment Isolation & Initiates or Controls Core & Containment Systems ML20072S0081994-09-0606 September 1994 Proposed Tech Specs Re Primary Containment,Oxygen Concentration & Vacuum Relief ML20072S0861994-09-0606 September 1994 Proposed Tech Specs Re Standby Gas Treatment & Control Room High Efficiency Air Filtration Sys Requirements ML20069M3311994-06-0909 June 1994 Proposed Tech Specs,Increasing Allowed out-of-service Time from 7 Days to 14 Days for Ads,Hpci & RCIC Sys,Including Section 4.5.H, Maint of Filled Discharged Pipe ML20067B7111994-02-0909 February 1994 Proposed Tech Specs Revising Wording for Page 3 of License DPR-35,clarifying Words to Aid Operators & Removing Obsolete Mechanical Snubber Acceptance Criterion BECO-93-156, Proposed Tech Specs Requesting Changes Supporting 24 Month Fuel Cycle (Submittal 3)1993-12-10010 December 1993 Proposed Tech Specs Requesting Changes Supporting 24 Month Fuel Cycle (Submittal 3) ML20059A9361993-10-19019 October 1993 Proposed Tech Specs for Removal of Scram & Group 1 Isolation Valve Closure Functions Associated W/Msl Radiation Monitors BECO-93-132, Proposed Tech Specs Removing Low Condenser Vacuum Scram in Order to Reduce Spurious Scrams,Unnecessary Plant Transients & Turbine First Stage Pressure Setpoint1993-10-19019 October 1993 Proposed Tech Specs Removing Low Condenser Vacuum Scram in Order to Reduce Spurious Scrams,Unnecessary Plant Transients & Turbine First Stage Pressure Setpoint ML20046D0441993-08-0909 August 1993 Proposed Tech Specs,Proposing 24 Month Fuel Cycle ML20044G1331993-05-20020 May 1993 Proposed Tech Specs Reducing MSIV Low Turbine Inlet Pressure Setpoint from Greater than or Equal to 880 Lb Psig to Greater than or Equal to 810 Psig & Reducing Min Pressure in Definition of Run Mode from 880 Psig to 785 Psig BECO-93-016, Proposed TS 3.5.C,D & E Re k-infinity Factor,Spent Fuel Pool Storage Capacity & Max Loads Allowed to Travel Over Fuel Assemblies,Respectively1993-02-11011 February 1993 Proposed TS 3.5.C,D & E Re k-infinity Factor,Spent Fuel Pool Storage Capacity & Max Loads Allowed to Travel Over Fuel Assemblies,Respectively 1999-06-16
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20196D0241999-06-16016 June 1999 Proposed Tech Specs Re Reactivity Control Incorporating Operating Requirements That Are Consistent with NEDO-21231, Banked Position Withdrawal Sequence ML20206R8161999-05-11011 May 1999 Proposed Tech Specs Re HPCI & RCIC Surveillance Testing ML20206H9771999-05-0505 May 1999 Proposed Tech Specs Modifying Licensing Basis for EDG on- Site Diesel Fuel Storage Requirements & Corresponding TSs ML20205A1451999-03-23023 March 1999 Core Shroud Insp Plan ML20207F1171999-03-0303 March 1999 Proposed Tech Specs Page 3/4.6-13 Re Reactor Vessel Matl Surveillance Program Withdrawal Schedule ML20151S3851998-08-31031 August 1998 Long-Term Program:Semi-Annual Rept ML20237E0851998-08-24024 August 1998 Proposed Tech Specs Pages Supporting Proposed TS Amend Related to EDG AOT ML20236X7191998-07-31031 July 1998 Proposed Tech Specs Page 3/4.9-5 Re Suppl to EDG for Allowed Outage Time ML20249C7101998-06-26026 June 1998 Proposed Tech Specs Correcting Typos & Updating Bases ML20249B3231998-06-15015 June 1998 Revised Complete Set of TS Pages Re Relocation of Radioactive Effluent TS & Radiological Environ Monitoring Program to ODCM ML20217F9341998-03-26026 March 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20217H2791998-03-25025 March 1998 Proposed Tech Specs 3.6.A.1 & 4.6.A.1,pertaining to Primary Sys Boundary,Thermal & Pressurizations Limitations & Surveillance Requirements & Basis 3/4.6.A ML20203D4981998-02-20020 February 1998 Proposed Tech Specs Pages,Incorporating Ultimate Heat Sink Temperature of 75 F Into TS 3/4.5.B & Bases,As Required by Amend 173 ML20217K5691997-10-24024 October 1997 Proposed Tech Specs Page Adding Footnote Declaring One Containment Isolation valve,30-CK-432,operate for Limited Period Despite Not Being within IST Interval for Reverse Flow Testing ML20211N6871997-09-16016 September 1997 Rev 9 to Procedure 8.I.1.1, Inservice Pump & Valve Testing Program ML20211G2381997-09-15015 September 1997 Rev 8 to PNPS-ODCM, Pilgrim Nuclear Power Station Odcm ML20211G2311997-09-12012 September 1997 Proposed Tech Specs Re Radiological Environ Monitoring Program Moved to ODCM ML20216C0631997-08-29029 August 1997 Semi-Annual Long Term Program Schedule ML20210K4381997-08-0808 August 1997 Revised TS Pages 3/4.5-7,B3/4.5-6 & B3/4/.5-7 Requiring Verification That SBO-DG Is Operable Prior to Voluntarily Entering LCO ML20196J0041997-07-22022 July 1997 Proposed Revised TS Bases for Section 3.5.F,correcting Volume of Water Available in Refuel Cavity & Dryer/Separator Pool When Flooded to Elevation 114 Ft & Revising Torus Water Volume to Reflect Volume Above Min Pump NPSH ML20210K3551997-07-0101 July 1997 Rev 16 to Procedure 7.8.1, Water Quality Limits ML20136J5501997-03-0707 March 1997 Proposed Tech Specs Rev for Section 3.10, Core Alterations Allowing Removal of Suspect Fuel Bundles Out of Planned Sequence ML20134C9671997-01-24024 January 1997 Proposed Tech Specs 2.0 Re Safety Limits ML20133A6511996-12-23023 December 1996 Proposed Revised Tech Specs 1.0 Re definitions,3.4 Re Standby Liquid Control sys,3.5 Re Core & Containment Cooling systems,3.7 Re Containment Systems & 3.9 Re Auxiliary Electrical Sys ML20132E5491996-12-10010 December 1996 Proposed Tech Specs Table 3.2.C.1 Re Instrumentation That Initiates Rod Blocks,Table 3.2.C.2 Re Control Rod Block Instrumentation Setpoints & Table 4.2.C Re Minimum Test & Calibr Frequency for Control Rod Blocks Actuation ML20135C1461996-11-26026 November 1996 Proposed Tech Specs,Modifying Definition 1.M, Primary Containment Integrity, to Include All Instrument Line Flow Check Valves to Make Definition Consisten W/Lco 3/4.7.A.2.a.4 ML20134K4361996-11-0707 November 1996 Proposed Tech Specs Re Installation of BWROG Enhanced Option 1A ML20117K6551996-09-0505 September 1996 Proposed Tech Specs,Providing Revised TS Pages 3/4.5-7 & 3/4.5-6 ML20116M1561996-08-12012 August 1996 Proposed Tech Specs to Plant TS Section 6.0,Administrative Controls & Sections 6.5.B.10.C & 6.14 of Util Quality Assurance Manual ML20117K6611996-07-17017 July 1996 Rev 15 to PNPS Procedure 1.2.2 Administrative OPS Requirements ML20108C0581996-05-0101 May 1996 Proposed Tech Specs Re Core Alteration to LCO & Surveillance Conditions Associated W/Secondary Containment ML20111B4201996-05-0101 May 1996 Proposed Tech Specs,Reflecting Implementation of 10CFR50 App J,Option B ML20111C2761996-05-0101 May 1996 Proposed Tech Specs 3.1.1 Re Reactor Protection Sys (Scram) instrumentation,3.2.C.1 Re Instrumentation That Initiates Rod Blocks & 3/4.4 Re Standby Liquid Control ML20108C1071996-05-0101 May 1996 Proposed Tech Specs,Relocating Administrative Controls Re QA Review & Audit Requirements of Section 6 from Plant TS to Boston Edison QA Manual ML20108A6561996-04-25025 April 1996 Proposed Tech Specs Re Part of Overall Effort to Improve Outage Performance at Plant ML20095E0771995-12-0808 December 1995 Proposed Tech Specs Bases Page B2-2,including GE11 GEXL Correlation Axial Power Profile & R-factor Ranges & Correcting Error in GE11 GEXL Correlation Mass Flux Range in GE Design ref,NEDE-31152-P, GE Fuel Bundle Designs ML20100J2521995-11-22022 November 1995 Rev 7 to Pilgrim Nuclear Power Station Odcm ML20092B5861995-09-0101 September 1995 Rev 0 to Third Ten-Yr Interval ISI Plan for Pilgrim Nuclear Power Station ML20092C4331995-09-0101 September 1995 Startup Test Rept for Pilgrim Nuclear Power Station Cycle 11 ML20092A4421995-08-31031 August 1995 Corrected Tech Spec Page Re Reactor High Pressure Trip Setting ML20086K2661995-07-14014 July 1995 Proposed Tech Specs Re Section 2.1,Bases:Safety Limits; Section 3.3.C,scram Insertion Times & Section 4.11.C, Minimum Critical Power Ratio to Reflect Use of Advanced GE-11 Fuel Design in Cycle 11 ML20078R6221995-02-15015 February 1995 Proposed Tech Specs Substituting for Pages Contained in Proposed TS Amends Submitted Prior to 950130 Authorization ML20078N4861995-02-0909 February 1995 Proposed Tech Specs,Increasing Reactor High Water Level Isolation Trip Level Setting ML20077Q1181995-01-13013 January 1995 Owner'S Specification for Reactor Shroud Repair ML20077M6921995-01-0909 January 1995 Proposed Reformatted Tech Specs & Bases ML20077A8991994-11-22022 November 1994 Proposed Tech Specs Re Suppression Chamber Water Level ML20077B1861994-11-22022 November 1994 Proposed Tech Specs 3.5.F,4.5.F.1 & 3.9.B.1 & 2 Re EDG Allowed out-of-svc Time ML20078K7961994-11-22022 November 1994 Proposed Tech Specs Re Changes to MSIV Leakage Requirement ML20078K8151994-11-22022 November 1994 Proposed TS Pages 3/4.2-20 & 3/4.2-35 Re Tables 3.2.C-1 & 4.2.C ML20078N8421994-11-18018 November 1994 Rev 32 to Procedure 8.7.3, Secondary Containment Leak Rate Test 1999-06-16
[Table view] |
Text
-- - -
0 l
l 1
ATTACHMENT B BECO LETTER 94-097 AMENDED TECHNICAL SPECIFICATION PAGES PAGE
\
1 45 48 68 l
i l
l l
l 9409130402 940906 PDR ADDCK 05000293 P PDR.
._ _m _ _ _ .
PE(PS TABLE 3.2.A INSTRUMENTATION THAT INITIATES PRIMARY CONTAINMENT ISOLATION .
Operable Instrument channels Per Trip System (1)
Minimum Available Instrument Trio Level Settinn Action (2) 2(7) 2 Reactor Low Water Level 211.7" indicated level (3) A and D 1 1 Reactor High Pressure $76 psig D l 2 2 Reactor Low-Low Water Level at or above -46.3 in. A indicated level (4) 2 2 Reactor High Water Level $45.3" indicated level (5) B 2(7) 2 High Drywell Pressure 52.22 psig A 2 2 High Radiation Main Steam $7 times normal rated B Line Tunnel (9) full power background 2 2 Low Pressure Main Steam Line 2810 psig (8) B 2(6) 2 High Flow Main Steam Line $136% of rated steam flow B 2 2 Main Steam Line Tunnel Exhaust Duct High Temperature $170 F B 2 2 Turbine Basement Exhaust Duct High Temperature $150 F B 1 1 Reactor Cleanup System High Flow $300% of rated flow C 2 2 Reactor Cleanup System High Temperature $150 F C i
Revision 170 Amendment No. 86, 147, 150, 151 45
PNPS TABLE 3.2.B (Cont'd)
INSTRUMENTATION THAT INITIATES OR CONTROLS THE CORE AND CONTAINMENT COOLING SYSTEMS Minimum # of Operable Instrument Channels Per Trip System (1) Trin Function Trip Level Setting Remarks 2 High Drywell Pressure $2.22 psig 1. Initiates Core Spray; LPCI; HPCI.
- 2. In conjunction with Low-Low Reactor Water Level, 94.4 - 115.6 second time delay and LPCI or Core Spray pump running, initiates Auto Blowdown (ADS)
- 3. Initiates starting of Diesel Generators
- 4. In conjunction with Reactor Low Pressure initiates closure of HPCI vacuum breaker containment isolation valves.
1 Reactor Low Pressure 400 psig i 5 Permissive for Opening Core Spray and <
LPCI Admission valves.
1 Reactor Low Pressure 576 psig In conjunction with PCIS signal permits closure of RHR (LPCI) inj ection valves.
1 Reactor Low Pressure 400 psig i 5 In conjunction with Low-Low Reactor Water Level initiates Core Spray and LPCI.
2 Reactor Low Pressure 900 psig i 5 Prevents actuation of LPCI break detection circuit.
2 Reactor Low Pressure 80 psig i 5 Isolates HPCI and in conjunction with High Drywell Pressure initiates closure of HPCI vacuum breaker containment isolation valves.
Revision 170 Amendment No. 42--113, 148, 151 48
. BASES:
3.2 In addition to reactor protection instrumentation which initiates a reactor scram, protective instrumentation has been provided which initiates action to mitigate the consequences of accidents which are i beyond the operator's ability to control, or terminates operator errors l before they result in serious consequences. This set of specifications !
provides the limiting conditions of operation for the primary system isolation function, initiation of the core cooling systems, control rod block, and standby gas treatment systems. The objectives of the Specifications are, (i) to assure the effectiveness of the protective 1 instrumentation when required by preserving its capability to tolerate a single failure of any component of such systems even during periods when portions of such systems are out of service for maintenance, and (ii) to prescribe the trip settings required to assure adequate performance.
When necessary, one channel may be made inoperable for brief intervals to conduct required functional tests and calibrations.
Some of the settings on the instrumentation that initiate or control core and containment cooling have tolerances explicitly stated where the ;
high and low values are both critical and may have a substantial effect j on safety. The set points of other instrumentation, where only the high '
or low end of the setting has a direct bearing on safety, are chosen at a level away from the normal operating range to prevent inadvertent actuation of the safety system involved and exposure to abnormal situations.
Actuation of primary containment valves is initiated by protective instrumentation shown in Table 3.2.A which senses the conditions for which isolation is required. Such instrumentation must be available whenever primary containment integrity is required.
The instrumentation which initiates primary system isolation is connected in a dual bus arrangement.
The low water level instrumentation closes all isolation valves except those in Groups 1, 4 and 5. This trip setting is adequate to prevent core uncovery in the case of a break in the largest line assuming a 60 second valve closing time. Required closing times are less than this, l l
Reactor pressure instrumentation is used for closure of Group 3 isolation valves and is set to trip at 176 psig. This prevents overpressurization of the RHR shutdown cooling piping. The isolation setpoint is chosen: (1) at a pressure below where the RHR piping could be overpressurized, (2) so that the isolation valves can close in the required time, and (3) at the point where the maximum differential pressure associated with the isolation valves is not exceeded.
The low low reactor water level instrumentation closes the Main Steam Line Isolation Valves, Main Steam Drain Valves, Recirc Sample Valves (Group 1) activates the CSCS subsystems, starts the emergency diesel generators and trips the recirculation pumps. This trip setting level was chosen to be high enough to prevent spurious actuation but low enough to initiate CSCS operation and primary system isolation so that no fuel damage will occur and so that post accident cooling can be accomplished and the guidelines of 10 CFR 100 will not be violated. For large breaks up to the complete circumferential break of a 28-inch recirculation line and with the trip setting given above, CSCS initiation and primary system isolation are initiated in time to meet the above criteria.
Revision 170 Amendment No. 105, 113, 151 68
- . w
6 I
ATTACHMENT B BECO LETTER 94-097 AMENDED TECHNICAL SPECIFICATION PAGES i PAGE i
45 48 68 l
i 1
l i
~
r PNPS TABLE 3.2.A INSTRUMENTATION THAT INITIATES PRIMARY CONTAINMENT ISOLATIdN Operable Instrument Channels Per Trip System (1) .
Minimum Available Instrument Trip Level SettinE Action (2) 2(7) 2 Reactor Low Water Level 29" indicated level (3) A 'nd a D 1 1 Reactor High Pressure 110 ps 8 76 f5l6 D.
2
- 2 Reactor Low-Low Water Level at or above -49 in. A .
indicated level (4) 2 2 Reactor liigh Water Level $48" indicated level (5) B 2(7) 2 High Drywell Pressure $2.5 psig A
~
2 2 High Radiation Main Steam $7 times normal rated B '
Line Tunnel (9) full power background 2 2 Low Pressure Main Steam Line 2810 psig (8) B 2(6) 2 High Flow Main Steam Line 5140% of rated steam flow B 2 2 Main Steam Line Tunnel Exhaust Duct High Temperature $170 F B 2 2 Turbine Basement Exhaust Duct High Temperature 5150 F B 1 1 Reacter Cleanup System High Flow $300% of rated flow C 2 2 Reactor Cleanup System High Temperature $150 F C Revision 169 Amendment No. 86, 147, 150 45
PNPS TABIE 3.2.B (Cont'd)
Minimum # of INSTRUMENTATION THAT INITIATES OR CONTROLS THE CORE AND CON ,
Operable Instrument Channels Per Trip System (1) Trip Function Trip Level Setting Remarks 2
High Drywell Pressure 52.5 psig 1. Initiates Core Spray; LPCI;' HPCI.
- 2. In conjunction with Low-Low Reactor Water Level, 120 second time delay and LPCI or Core Spray pump running, initiates Auto Blowdown (ADS)
- 3. Initiates starting of Diesel Cenerators
- 4. In conjunction with Reactor Low Pressure initiates closure of HPCI valves. breaker containment isolation vacuum 1
Reactor Low Pressure 400 psig i 25 Permissivo for Opening Core Spray and LPCI 6.7GPsth Admission valves.
1 Reactor Low Pressure 5110 psig In conjunction with PCIS signal permits closure of RHR (LPCI) injection valves.
1 Reactor Low Pressure 400 psig i 25 In conjunction with Low-Low Reactor Water Level initiates Core Spray and LPCI.
2 Reactor Low Pressure 900 psig i 25 Prevents circuit. actuation of LPCI break detection 2
Reactor Low Pressure 100>P>50 psig IsolatesPressure HPCI and in conjunction with High Drywell initiates closure of HPCI (
vacuum breaker containment isolation valves.
Revision 167 Amendment No. 427 -113, 148 '
48
BASES:
3.2 In addition to reactor protection instrumentation which initiates a reactor scram, protective instrumentation has been provided which initiates action to mitigate the consequences of accidents which are beyond the operator's ability to control, or terminates operator errors before they result in serious )
consequences. This set of specifications provides the limiting conditions of !
coeration for the primary system isolation function, initiation of the core j cooling systems, control rod block, and standby gas treatment systems.
The objectives of the Specifications are, (i) to assure the effectiveness of the protective instrumentation when required by preserving its capability to tolerate a single failure of any component of such systems even during periods when portions of such systems are out of service for maintenance, and (ii) to prescribe the trip settings required to assure adequate performance. When l necessary, one channel may be made inoperable for brief intervals to conduct required functional tests and calibrations.
I Some of the settings on the instrumentation that initiate or control core and l containment cooling have tolerances explicitly stated where the high and low values are both critical and may have a substantial effect on safety. The set points of other instrumentation, where only the high or low end of the setting i has a direct bearing on safety, are chosen at a level away from the normal l operating range to prevent inadvertent actuation of the safety system involved ;
and exposure to abnormal situations. ;
i Actuation of primary containment valves is initiated by protective !
instrumentation shown in Table 3.2.A which senses the conditions for which ;
isolation is required. Such instrumentation must be available whenever l primary containment integrity is required. j The instrumentation which initiates primary system isolation is connected in a l dual bus arrangement.
The low water level instrumentation closes all isolation valves except l those in Groups 1, 4 and 5. This trip setting is adequate to prevent core I uncovery in the case of a break in the largest line assuming a 60 second valve i closing time. Required closing times are less than this.
> kWF j The low low reactor water level instrumentation closes the Main Steam Line i Isolation Valves, Main Steam Drain Valves, Recirc Sample Valves (Group 1) l activates the CSCS subsystems, starts the emergency diesel generators and I trips the recirculation pumps. This. trip setting level was chosen to be high enough to prevent spurious actuation but low enough to initiate CSCS operation and primary system isolation so that no fuel damage will occur and so that post accident cooling can be accomplished and the guidclines of 10 CFR 100 will not be violated. For large breaks up to the complete circumferential break of a 28-inch recirculation line and with the trip setting given above, CSCS initiation and primary system it,olation are initiated in time to meet the above criteria. .
Reactor pressure instrumentation is used for closure of 'iroup 3 isolation valves and is set to trip at 176 psig. This prevents overpressurization of the RHR shutdown cooling piping. The isolation setpoint is chosen: (1) at a pressure below where the RHR piping could be overpressurized, (2) so that the i. solation valves can close in the required time, and (3) at the point where the maximum differential pressure associated with the isolation valves is not exceeded.