ML20206U113

From kanterella
Revision as of 00:42, 28 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Summary of 860909-11 Meetings W/Util at Atlanta,Ga Corporate Ofc & Plant Site Re Proposed Organization for Operation from Company President Down Through Proposed Operating Staff at Site.List of Attendees & Agenda for Visits Encl
ML20206U113
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/30/1986
From: Jacqueline Thompson
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8610070312
Download: ML20206U113 (8)


Text

.-

paacog

, , fg UNITED STATES

, , y J g NUCLEAR REGULATORY COMMISSION 5 -l WASHINGTON, D. C. 20555

  • t,, /

Docket Nos.: 50-424 3 0 SEP 1986 and 50-425 APPLICANT: Georgia Power Company FACILITY: Vogtle Electric Generating Plant, Units 1 and 2

SUBJECT:

SUPMARY OF MEETING HELD SEPTEMBER 9-11, 1986 ON LICENSEE QUALIFICATIONS FOR OPERATIONS On September 9-11, 1986, the staff met with the applicant to discuss the pro-posed organization for operation of the Vogtle Unit 1 Electric Generating Plant from the level of the company president down through the proposed operating staff at the site. The staff met on September 9 and 10 at the Corporate office in Atlanta with Georgia Power Company. The agenda for the corporate office visit is listed as Attachment 1.

In addition, on September 10-11, 1986, the staff met with the applicant at the Vogtle site to discuss the site organization. The agenda for the site visit is listed as Attachment 2.

The staff interviewed each of Georgia Power Company's superintendents and managers and discussed each of the job functions and responsibilities associated

, with each. Attachment 3 is the interview schedule with the superintendents and i managers for Georgia Power Company. The staff concluded the site visit with de-

parting comments and observations on the Licensee Qualification Program at the exit meeting.

l The following items were discussed at the exit meeting:

l 1. The Senior Vice President - Nuclear Operations has strengthened the corporate staff considerably and is developing plans to strengthen site management at both Hatch and Vogtle.

2. The operating organization has not yet been finalized. The staff will require more information reflecting the actual proposed l organizational structure.
3. Both the corporate and site organizations have been staffed with experienced, knowledgeable people who are committed to operating l Plant Vogtle safely and reliably.

i hA i

,,,--,--.m ~.-m..--:~.-. ,---mmy.-,.--- .-,,,-- -,e- ww- wwww"*r,m'*v - *-

4. Section 13.4.11.2 of the staff's SRP states that acceptable qualifi- l cations for the SRB Chairman will meet or exceed those described in Section 4.7.1 of ANSI /ANS-3.1-1978 and the regulatory position of Regulatory Guide 1.8. In Section 13.4.2 of the FSAR, the qualifi-cations of the Chairman of the Safety Review Board (SRB) are not delineated.

John Thompson, Project Manager PWR Project Directorate #4 Division of PWR Licensing-A

Enclosures:

As stated cc: See next page PWR#4/ -A t

PWRp,/fPWR-A

[

PW e / WR-A JTh mac MD6H{an e BJYoungblood 09/ //86 09/J[J/86 09/q786

s .

Mr. R. E. Conway Georgia Power Company Vogtle Electric Generating Plant cc:

Mr. L. T. Gucwa Resident Inspector Chief Nuclear Engineer Nuclear Regulatory Consnission Georgia Power Company P. O. Box 572 P.O. Box 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302 Mr. Ruble A. Thomas Deppish Kirkland, III, Counsel Vice President - Licensing Office of the Consumers' Utility Vogtle Project Council Georgia Power Company / Suite 225 Southern Company Services, Inc. 32 Peachtree Street, N.W.

P.O. Box 2625 Atlanta, Georgia 30303 Birmingham, Alabama 35202 James E. Joiner Mr. Donald O. Foster Troutman, Sanders, Lockerman, Vice President & Project General Manager & Ashmore Georgia Power Company Candler Building Post Office Box 299A, Route 2 127 Peachtree Street, N.E.

Waynesboro, Georgia 30830 Atlanta, Georgia 30303 Danny Feig Mr. J. A. Bailey 1130 Alta Avenue Project Licensing Manager Atlanta, Georgia 30307 Southern Company Services, Inc.

P.O. Box 2625 Carol Stangler Birmingham, Alabama 35202 Georgians Against Nuclear Energy Ernest L. Blake, Jr. 425 Euclid Terrace Atlanta, Georgia 30307 Bruce W. Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.

Washington, D. C. 20036 L

Mr. G. Bockhold, Jr.

Vogtle Plant Manager Georgia Power Company Route 2, Box 299-A Waynesboro, Georgia 30830 Regional Administrator, Region II U.S. Nuclear Regulatory Conunission 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 i

I L

A7TAcHMsr>T L AGENDA NRC REVIEW OF GEORGIA POWER COPFANY MANAGEMENT FOR PLANT V0GTLE OPERATIONS l

SEPTEMBER 9,1986 23rd FLOOR " VIDE 0" ROOM 8:30 - 8:35 WELCOME AND INTRODUCTIONS 8:35 - 8:50 OPENING REMARKS J. P. O'REILLY 8:50 - 10:20 J. P. O'REILLY CORPORATE NUCLEAR OPERATIONS OVERVIEW o DVERALL CORPORATE ORGANIZATION J. T. BECKHAM, JR o NUCLEAR SAFETY AND LICENSING L. T. GUCWA o NUCLEAR TRAINING & EMERGENCY PREPAREDNESSJ. M. HOWARD o PERFORMANCE AND ANALYSIS D. G. SMITH o NUCLEAR SUPPORT T. J. McHENRY o RADIOLOGICAL SAFETY S. C. EWALD

.a MAINTENANCE & OUTAGE PLANNING B. K. McLEOD o ENGINEERING P. R. BEMIS o QUALITY ASSURANCE D. S. READ 10:20 - 10:30 BREAK 10:30 - 11:00 INTERVIEW: MR. J. H. MILLEP., JR. 24TH FLOOR PRESIDENT, GEORGIA POWER CO.

11:10 - 11:40 INTERVIEW: MR. J. P. O'REIILY 14TH FLOOR -

SR. VICE PRESIDENT NUCLEAR OPERATIONS 11:40 - 12:30 LUNCH

  • 12:30 - 1:00 INTERVIEW: J. T. BECKHAM, JR.

20TH FLOOR VICE PRESIDENT & GENERAL MGR.

NUCLEAR OPERATIONS 1:10 - 1:40 INTERVIEW: L. T. GUCWA 14TH FLOOR MANAGER, NUCLEAR SAFETY a LICENSING 1:45 - 2:15 INTERVIEW: E. M. HOWARD 14TH FLOOR i

MANAGER, NUCLEAR TRAINING &

EMERGENCY PREPARE 0 NESS 2:20 - 2:50 INTERVIEW: D. G. $NITH 14TH FLOOR MANAGER, PERFORMANCE & ANALYSIS i

' 3:00 - 3:30 INTERVIEW: B. K. McLEOD 20TH FLOOR MANAGER, MAINTENANCE a OUTAGE PLANNING 3:40 - 4:10 INTERVIEW: D. S. READ 18TH FLOOR GENERAL MANAGER, QUALITY j

ASSURANCE j

j

A Tracio1eo r

. . .. . 2_

AGENDA NRC PRESENTATION FOR V0GTLE SITE VISIT SEPTEMFZR 10, 1986

1. UVERVIEW AND ORGANIZATION G. B0cKHOLD 2:15-2:30
2. TEST PROGRAM fh R. M. BELLAMY 2:30-2:40
3. PREPARATIONS FOR OPERATIONSde H. P. WALKER 2:40-2:50
4. TM1 ACTION ITEMS - OPERATIONS . gig W. F. KITCHENS 2:50-3:05
5. TRAINING Pavu P. D. RUSHTON 3:05-3:20 6.

OPERATIONS ASSESSMENT PROGRAM J. F.mc D'AMIc0 3:20-3:25

. 7. SECURITY Ro ws.u_ R. K. BROWN 3:25-3:30

'l e

- ---,,,-,,---,,.,,--.-<-,----~--w, - - - - - - - - - - - - - - - - - - - - - - - - , - - - - - ~ , - - - - ~ , - - , ,--

n .

MMOte-nk b NRC INTERVIEW SCHEDULE September 10, 1986 '

3:30-4:00

6. Bockhold General Manager 4:15-4:45 H. P. Walker Manager Unit Operations 1 .

September 11, 1986

, 8:30-9:00 R. M. Bellamy Manager Test Outage 9:15-9:45 ,

J. F. D'Amico Superintendent Regulatory Compliance 10:00-10:30 W. F. Kitchens Superintendent Operations 10:45-11:15 M. A. Griffis Superintendent Maintenance 11:30-12:00 A. L. Mosbaugh Superintendent Plant Engineer Services

.. 1:15-1:45 W. bouJ cu su.erce m ous

, R . ^^ n-- Sr.t S;th^

sueuwson 2:00-2:30

8. Whittemore Shift Technical Advisor i

l

. . _ _ _ _ _ - - . . ,_ _ - - - - -- - - - - - - - - ~ ~ ' ' - - - ~ ~ ~~~~

F Attachment 4 s

PARTICIPANTS NRC SOUTHERN COMPANY SERVICES Dhompson R. Thomas L. Crocker K. Kopecky D. Hickman J. Bailey GEORGIA POWER COMPANY L. Gucwa D. Hudson J. P. O'Reilly J. Beckham, Jr.

E. Howard D. Smith T. McHenry S. Ewald B. Mcleod -

P. Bemis D. Read J. Miller, Jr.

G. Buckhold R. Bellamy H. Walker W. Kitchens P. Rushton J. D'Amico R. Brown i

h 1

i i

2

_ . . . ._. _ _ _ . _ _ _ . _ . - - . . , _ ~ _ __ . _ _ . _ _ _ _ . - . _ _ _ _ ,

\_,.**

  • MEETING

SUMMARY

DISTRIBUTION ,

l[Docketkibe NRC Participants NRC POR L PDR

' J. Inompson NSIC L. Crocker D. Hickman PRC System PWR#4 Reading File Project Manager J. Thompson M. Duncan P. O'Connor M. Miller i OGC J. Partlow E. Jordan B. Grimes ACRS (10)

OTHERS bec: Licensee & Service List 1

6 t

t

.- -- .,, -