Summary of 900412 VEGP Plant Review Board Meeting 90-57 to Discuss Listed Items,Unanimously Recommended for Approval
ML20129F532
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/12/1990
From: Kitchens W, Tynan C
GEORGIA POWER CO.
To:
GEORGIA POWER CO.
Shared Package
ML20128F432 List: ... further results
References
FOIA-95-81 NUDOCS 9610040171
Download: ML20129F532 (4)


Text

-

~

4 VEGP PLANT R2 VIEW DvARD MEETING MINUTES

~

MEETING NO.

90-37 DATE 04/12/90 PAGE 1

OF 4

ra:ETING CONVENED 1:10 AM/PM; MEETING ADJOURNED 2:50 AM/PM

(

  • VIA TELECON)

THIS MEETING CHAIRED BY:

(x) CHAIRMAN

( ) VICE CHAIRMAN W. F. Kitchens VOTING MEMBERS PRESENT:

M. W. Horton J. G. Aufdenkampe J. E. Swartzwalder A. L. Mosbaugh PRB SECRETARY C.

Cross Tynan NON-VOTING MEMBERS PRESENT:

G. R. Frederick M. B. Lackey K. R. Holmes C.

P. Stinespring i

j VOTING ALTERNATES PRESENT:

1 l

M. L. Hobbs FOR H. M. Handfinger 4

l I. A. Kochery FOR R. L. LeGrand h

NON-VOTING ALTERNATES PRESENT:

f FOR FOR I

FOR FOR l'

j FOR 1

s GUESTS / TECHNICAL ADVISORS:

W. K. Smith T. E. Webb PRB ACTION ITEMS OPENED:

None PRB ACTION ITEMS CIDSED:

None PRB MINUTES APPROVED 90-48 to and including 90-56 n

U Y&

b. O W

&f

^

/

/

PRB SECRETARY PRB CHAIRMAN

}

CC: NRC RESIDENT INSPECTOR (FORM NAME=PRBAGEND) 9610040171 960827 PDR FOIA WILMOTH95-81 PDR

.r PRB 90-57 Page 2 of 4 PRB MEETING MINUTES CONTINUATION SHEET A.

Meeting Minutes 90-48, 90-49, 90-51, 90-52, 90-53, 90-54 and 90-1 55 were unanimously approved as presented.

j Meeting Minutes 90-50 were unanimously approved with comment to indicate that the attached Event critique Package is a draft report.

Meeting Minutes 90-56 were unanimously approved as presented, j

however J. E. Swartzwalder stated that a revision to Procedure 12005-C was no longer needed as determined from the review since the last PRB meeting.

1 B.

The following items were unanimously recommended for approval.

i No unreviewed safety question involved.

}

12006-C, Rev. 16

" Unit Cooldown to Cold Shutdown" i

TCP-T-ENG-90-09-02

" Diesel Generator Functional j

Checkout" TCP-T-ENG-90-13-01

" Sequencer Operability Check" TCP-T-ENG-90-11-01 "A-Train Undervoltage Test"

?

g Quarterly Operational Monitoring Report (NOTS-00352) j LDCR FS 90-11 Revise.FSAR Table 9.5.1-10, Section, j

9.5.1.2.1.4.B and 9A.1.86.N - DCP i-88V1N0046 adds two sprinkler heads l

to Control Building Room 178 by l

extending branch piping from system j

079.

LDCR FS89-087 Revise FSAR Table 7.5.2-1 to make ERF indication of variables

]

(Feedwater Bypass Isolation Valve Status) consistent with actual valve function.

Also to clarify other indications for Reg. Guide 1.97 conformance (DCP 89-V2NO320).

LDCR TS 90-05 Change to Tech. Spec. 4.0.3 and associated bases - Revise.in accordance with Generic Letter 87-09 to include a specific acceptable time limit of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to complete an inadvertantly missed surveillance before the provisions of the Action Requirements apply.

i

~.- -.-..----.. -.. -. -

} n y ' v r::.. ;3,;. c +

z... 13p,a g;3g a,- :;m _...

PRB 90-57 Page 3 of 4 j

-93100-C, Rev. 6

" Refueling Tools and Equipment Preservice Inspection and Checkout" 83503-1, Rev. O

" Unit Operation During Secondary 3

]

Plant Performance Test" 83504-1, Rev. O

" Secondary Plant Performance Test Instrumentation Installation and Setup" l

l Settlement Monitoring Report to NRC (Correspondence ELV-01473)

C.

The following items were unanimously recommended for approval j

with comment.

No unreviewed safety question involved.

19033-C, Rev. 6 "ES-3.3 Post-SGTR Cooldown Using l

Steam Dump".

Reword the caution on page 2, add (initiate an offsite i

release permit).

j 19100-C, Rev. 5 "ECA-0.0 Loss of All AC Power".

Page 5, underline RAT.

Step 3F, sample valve should be repeated i

elsewhere in procedure.

RLER 1-90-008

" Typographical Error Leads to a Missed ASME Section XI Valve Test".

Change. title to " procedural i

j inadequacy" instead of

" typographical error". Section D -

delete last sentence.

D.

The following items were tabled by.the board with the comment indicated.

l l

00409-C, Rev. 7 "Open Item / Commitment Tracking".

?

Review to determine if the proposed change is necessary.

i LER 1-90-06

" Loss of offsite Power Leads to Site Area Emergency".

Section A -

delete items a) and b) and include y

another section that would state this is a summary of Site Area Emergency event.

Return / rewrite as 8 pages or less.

  • u sc h m. M u y G w p: m sra.nzan~g.h s r;d. w;r=resq. i. m.1. s q

. _..O r:.- %

PRB 90-57 Page 4 of 4 E.

The board unanimously concurred with the reportability determination for the following Deficiency Cards.

1-90-0157 1-90-0182 1-90-0165 90-0183 1-90-0166 1-90-0185 1-90-0167 1-90-0186 1-90-0168 1-90-0192 1-90-0171 1-90-0194 1-90-0173 1-90-0196 1-90-0175 1-90-0193 1-90-0177 1-90-0197 1-90-0179 1-90-0189 1-90-0100 1-90-0200 Meeting Adjourned

.