4 VEGP PLANT R2 VIEW DvARD MEETING MINUTES
~
MEETING NO.
90-37 DATE 04/12/90 PAGE 1
OF 4
ra:ETING CONVENED 1:10 AM/PM; MEETING ADJOURNED 2:50 AM/PM
(
- VIA TELECON)
THIS MEETING CHAIRED BY:
(x) CHAIRMAN
( ) VICE CHAIRMAN W. F. Kitchens VOTING MEMBERS PRESENT:
M. W. Horton J. G. Aufdenkampe J. E. Swartzwalder A. L. Mosbaugh PRB SECRETARY C.
Cross Tynan NON-VOTING MEMBERS PRESENT:
G. R. Frederick M. B. Lackey K. R. Holmes C.
P. Stinespring i
j VOTING ALTERNATES PRESENT:
1 l
M. L. Hobbs FOR H. M. Handfinger 4
l I. A. Kochery FOR R. L. LeGrand h
NON-VOTING ALTERNATES PRESENT:
f FOR FOR I
FOR FOR l'
j FOR 1
s GUESTS / TECHNICAL ADVISORS:
W. K. Smith T. E. Webb PRB ACTION ITEMS OPENED:
None PRB ACTION ITEMS CIDSED:
None PRB MINUTES APPROVED 90-48 to and including 90-56 n
U Y&
- b. O W
&f
^
/
/
}
CC: NRC RESIDENT INSPECTOR (FORM NAME=PRBAGEND) 9610040171 960827 PDR FOIA WILMOTH95-81 PDR
.r PRB 90-57 Page 2 of 4 PRB MEETING MINUTES CONTINUATION SHEET A.
Meeting Minutes 90-48, 90-49, 90-51, 90-52, 90-53, 90-54 and 90-1 55 were unanimously approved as presented.
j Meeting Minutes 90-50 were unanimously approved with comment to indicate that the attached Event critique Package is a draft report.
Meeting Minutes 90-56 were unanimously approved as presented, j
however J. E. Swartzwalder stated that a revision to Procedure 12005-C was no longer needed as determined from the review since the last PRB meeting.
1 B.
The following items were unanimously recommended for approval.
i No unreviewed safety question involved.
}
12006-C, Rev. 16
" Unit Cooldown to Cold Shutdown" i
TCP-T-ENG-90-09-02
" Diesel Generator Functional j
Checkout" TCP-T-ENG-90-13-01
" Sequencer Operability Check" TCP-T-ENG-90-11-01 "A-Train Undervoltage Test"
?
g Quarterly Operational Monitoring Report (NOTS-00352) j LDCR FS 90-11 Revise.FSAR Table 9.5.1-10, Section, j
9.5.1.2.1.4.B and 9A.1.86.N - DCP i-88V1N0046 adds two sprinkler heads l
to Control Building Room 178 by l
extending branch piping from system j
079.
LDCR FS89-087 Revise FSAR Table 7.5.2-1 to make ERF indication of variables
]
(Feedwater Bypass Isolation Valve Status) consistent with actual valve function.
Also to clarify other indications for Reg. Guide 1.97 conformance (DCP 89-V2NO320).
LDCR TS 90-05 Change to Tech. Spec. 4.0.3 and associated bases - Revise.in accordance with Generic Letter 87-09 to include a specific acceptable time limit of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to complete an inadvertantly missed surveillance before the provisions of the Action Requirements apply.
i
~.- -.-..----.. -.. -. -
} n y ' v r::.. ;3,;. c +
z... 13p,a g;3g a,- :;m _...
PRB 90-57 Page 3 of 4 j
-93100-C, Rev. 6
" Refueling Tools and Equipment Preservice Inspection and Checkout" 83503-1, Rev. O
" Unit Operation During Secondary 3
]
Plant Performance Test" 83504-1, Rev. O
" Secondary Plant Performance Test Instrumentation Installation and Setup" l
l Settlement Monitoring Report to NRC (Correspondence ELV-01473)
C.
The following items were unanimously recommended for approval j
with comment.
No unreviewed safety question involved.
19033-C, Rev. 6 "ES-3.3 Post-SGTR Cooldown Using l
Steam Dump".
Reword the caution on page 2, add (initiate an offsite i
release permit).
j 19100-C, Rev. 5 "ECA-0.0 Loss of All AC Power".
Page 5, underline RAT.
Step 3F, sample valve should be repeated i
elsewhere in procedure.
RLER 1-90-008
" Typographical Error Leads to a Missed ASME Section XI Valve Test".
Change. title to " procedural i
j inadequacy" instead of
" typographical error". Section D -
delete last sentence.
D.
The following items were tabled by.the board with the comment indicated.
l l
00409-C, Rev. 7 "Open Item / Commitment Tracking".
?
Review to determine if the proposed change is necessary.
i LER 1-90-06
" Loss of offsite Power Leads to Site Area Emergency".
Section A -
delete items a) and b) and include y
another section that would state this is a summary of Site Area Emergency event.
Return / rewrite as 8 pages or less.
- u sc h m. M u y G w p: m sra.nzan~g.h s r;d. w;r=resq. i. m.1. s q
. _..O r:.- %
PRB 90-57 Page 4 of 4 E.
The board unanimously concurred with the reportability determination for the following Deficiency Cards.
1-90-0157 1-90-0182 1-90-0165 90-0183 1-90-0166 1-90-0185 1-90-0167 1-90-0186 1-90-0168 1-90-0192 1-90-0171 1-90-0194 1-90-0173 1-90-0196 1-90-0175 1-90-0193 1-90-0177 1-90-0197 1-90-0179 1-90-0189 1-90-0100 1-90-0200 Meeting Adjourned
.