Summary of 900628 Interface Meeting W/Util in Birmingham,Al Re Potential Issues Affecting Both NRC & Licensee Organizations.Next Interface Meeting Tentatively Set for Dec 1990 or Jan 1991.Agenda Encl
ML20055F734
Person / Time
Site: Hatch, Vogtle  Southern Nuclear icon.png
Issue date: 07/11/1990
From: Tim Reed
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 9007190111
Download: ML20055F734 (5)


Text

_ _ _ _ _ . _ _ _ _ _ _ __ _ __ _ . . _ __

j

' f[p usg'o

'g

, UNITE D STATE S ]

g g NUCLE AR "JGUL ATORY COMMISSION i

)

  • -E

$ WHINGTON, D. C. 20$$$

'\ July 11, 1990 9...., j Docket Nos.: 50-321, 50-366 50-424, 50-425 LICEN$EE: Georgia Power Company FACILITY: Plant Hatch, Units 1 and 2 Plant Vogtle, Units 1 and 2 1

. /

SUBJECT:

SUMMARY

OF JUNE 28, 1990, GPC/NEC INTERFACE MEETING J

Cn June 28, 1990, theNRCstaff(includingNRRProjectManagers, Region 11 personnel,andresidentinspectorsforboththeHatchandVogtleplants) met with representatives of Gecrgia Power Company (GPC) at the corporate j office in Birmingham, Alabara, to discuss issues that have the potential for  ;

affecting both the NRC and GPC organizations. Meeting attendees are listed j in Enclosure 1. The agenda is Enclosure 2. j Mr. Hairston, Senior Vice President of Georgia Power Company, opened the i meetingw(SONOPCO).ith Company a status The contract of the to enable formation 50N0PC0 of the Southern to operate the Hatch Nuclear and Operating

'Yogtle facilities has been largely resolved, and barring unforeseen diffi-I culties, should go to the co owners' boards for approval in approximately 30 days. At this time, it appears that the SONOPC0 formation should go smoothly.

Mr. Beckham, Vice President-Hatch, provided a status of the key activities l ongoing at Plant Hatch. Mr. Beckham also discussed the recert event at Hatch )

Unit 1 involving a fire in the charcoal absorbers.

t Mr. McCoy, Vice President-Vogtle, discussed the current status of activities l at the Vogtle site focusing primarily on the corrective actions steming from l the March 20, 1990, event et Yogtle Unit 1. GPC had identified 115 items for l corrective action consideration prior to issuance of NUREG 1410. That list expanded to 253 items (many are redundant items) now under consideration for

corrective action (a significant percentage of issues have already been  !

! addressed), i Mr. McCracken, Manager of Regulatory Engineering and Environmental Services, discussed the generic issues currently of greatest interest to GPC. These I L incluoe decomissioning (funding), plant life extension, Individual Plant  :

Examinations (IPE). External Events IPE, and the current projected 18-24 month d j delay in opening of the Southeast Conipact (North Carolina).

l l

l 9007190111 900711 '

DR ADOCK0300{}1 g
  • to

. I  ;

July 11, 1990 Mr. Matthews, NRR Project Director, discut .::d the NRC's view of GPC's -

interpretation of 10 CFR 50.73 Engineered Safety Feature (ESF) actuations.  !

NRR and AEOD are currently in agreernent with Region II's interpretation of what constitutes a reportable ESF actu6 tion. However, NRR also believes this issue j should be addressed in the larger context of 10 CFR 50.73 in general (industry '

is currently addressing the pros and cons of 50.73 and where improveraents can ,

be made) and should be addressed on an industry basis. Mr. Matthews also dis- '

cussedthestatusofGenericSafetyIssues(GSis)mentioningthatGSIswould be handled in an analogous fashion to the USIs.

Cindy Tully, Senior Engineer for GPC, presented GPC's and the DWR Owner's Group views regarding the interpretation of 10 CFR 50.73. Both Ms. Tully and Steve Bethey (GPC Hgr. Licensing. Hatch) emphasized the need for NRC to ,

address the spcifics of 10 CFR 50.73, particularly with respect to the cefinition of the 50.73 language (e.g., Engineered Safety Feature).

The last portion of the meeting was dedicated to the individual plant breakout sessions where the status of current licensing was discussed.

The next GPC/NRC interface meeting has been tentatively set for December 1990 or January 1991 cnd will be held at Plant Hatch.

/5/

Timothy A. Reed, Project Manager i Project Directorate 11 3

Division of Reactor Projects I/11 l

Office of Nuclear kcactor Regulation  ;

Enclosures:

DISTRIBUTION; L As stated Docket File'" NRC & Local PDRs

l. Treed F. Miraglia l RIngram J. Partlow ,

DMatthews OGC PDi!.3 r/f E. Jordan ACRS (10) NRC Participants (Enclosure 1)

RBorchardt 17G21 l

l

.) \ .

LA
PDIl.3 PM:Euw  : :

gl.3  :  :  : ;

l0FL.

l......:................:.//..f..k3 R!ngram[

7...........:..............:..............:.............

iNAME  : Treed /rt  : )tthews  :  :  : :

i......:................:..............:..............:..............:..............:............. '

!DATE :q /t /90  : 7//Q'90 A /th/90  :  :  :

. v 0FFICIAL RECORD COPY Docunent Name: GPC/NRC INTERFACE MEETING

Mr. W. G. Hairston, III Edwin 1. Hatch Nuclear Plant Georgia Power Company Yogtle Electric Generating Plant cc:

Shaw, Pittman, Potts and Trowbridge Mr. R. P. Mcdonald 2300 N Street, N.W. Executive Vice President - I l War,hington, D.C. 20037 Nuclear Operations Gecrgia Power Company ,

Mr. J. T. Beckman P. O. Box 1295 l Vice President - Plant Hatch Birmingham, Alabama 35201 I Georgia Power Company '

P. O. Box 1295 Mr. Alan R. Herdt, Chief Birmingham, Alabama 35201 Project Branch #3 U.S. Nuclear Regulatory Comission Mr. S. J. bethay 101 Marietta Street, NW, Suite 2900 Manager Licensing - Hatch Atlanta, Georgia 30323 Georgia Power Company ]

l

P.O. Box 1295 J. A. Bailey l Birmingham, Alabama 35201 Manager - Licensing i Georgia Power Company 1 i

Mr. H. C. Nix P.O. Box 1295 l General Manager, Nuclear Plant Birniingham, Alabama 35201 l Georgia Power Company 1 Route 1. Box 439 Mr. G. Bockhold, Jr.  :

Baxley, Georgia 31513 General Manager, Vogtle Electric 1 Generating Plant Resident inspector P.O. Box 1600 l U.S. Nuclear Regulatory Comission Waynesboro, Georgia 30830 l Route 1, Box 725 Buley, Georgia 31513 Of fice of the County Comissioner Burke County Comission Regional Administrator, Region II Waynesboro, Georgia 30830 U.S. Nuclear Regulatory Commission i 101 Marietta Street, Suite 2900 Office of Planning and Budget

Atlanta, Georgia 30323 Room 6158 l 270 Washington Street, S.W.

Mr. Charles H. Cadger Atlanta, Georgia 30334 Office Planning and Budget Roam 610 Mr. C. K. McCoy l

270 Washington Street, S.W. Vice President - Nuclear,

Atlanta, Georgia 30334 Vogtle Project Georgia Powe? Company Mr. J. Leonard Ledbetter, Director P.O. Box 1295 Environrental Protection Division Birmingham, Alabama 35201 Department of Natural Resources

, 205 Cutler Street, S.L., Suite 1252 Rest N t inspector l Atlanta, Georgia 30334 Nuclear' Regulatory Comission P.O. Box 572 Chairman Waynesboro, Georgia 30830 Applying County Commissioners County Courthouse Attorney General Bexley, Gt.crgia 31513 Law Department

! 132 Judicial Building L

Mr. W. G. Hairston,III Atlanta, Georgia 30323 Senior Vice President -

Nuclear Power Company P.O. Box 1295 Birmingham, AL 35201

Enclosure 1 Attendees Name Organization Timothy A. Reed NRC/Vogtle PM David B. Matthews NRC/ Project Director Alan R. Herdt NRC/RII/ Projects Branch Chief Ken E. Brockman NRC/Ril/RPS3B Len Wert NRC/R!l/ Hatch Senior Res Lawrence P. Crocker NRC/NRR/ Hatch PH Brad Moore APC0/ Licensing Ngr Rick Odom - GPC/NSAC Supy Jim Bailey GPC/Mgr Licensing /Vogtle R. A. Musser NRC Hatch Resident Inspector J. D. Heidt GPC/Mgr Eng & Lic/ Hatch K. W. McCracken SCS/Mgr Reg, Eng & Env Serv Steve Bethey GPC/Mgr Licensing / Hatch J. T. Beckham, Jr. GPC/VF/ D iant Hatch W. G. Hairsten, !!! GPC/APC/Sr VF' Nuclear Operations C. K. McCoy GPC/VP/ Plant Vogtle Brian Bonser NRC/Vogtle SRI I

L l

o .' $ o o ,.

Enclosure 2 GEORGIA POWER /NRC ,

REGULATORY COMPLIANCE INTERFACE MEETING t

JUNE 28, 1990 i BIRMINGHAM, ALABAMA i

AGENDA 8:15 A.M. Opening Ren. arks W. G. Hairston, 111 8:30 A.M. Sonopco Update ,

i 8:40 A.M. Hatch Status J. T. Beckham 9:00 A.M. Yogtle Status C. K.,McCoy ,  ;

March 20 Corrective Actions l 9:45 A.M. Generic Issues K. W. McCracken i

- Decommissioning

- Proposed Rules '

- IFE ,

10:00 A.M. 10CFR 50.73 Reportability D. Matthews ESF Actuations i GPC/50.73 C. Tully l 11:15 A.M. Plant Specific Break Out Sessions i

- Hatch

- Vogtle 12:00 Noon Lunch  !

t

._ . - . . _ , , - . . - - -v ,