ML20236B189

From kanterella
Jump to navigation Jump to search

Summary of 890309 Meeting W/Utils & Westinghouse in Rockville,Md Re Pressurizer Surge Line Analysis,In Response to NRC Bulletin 88-11
ML20236B189
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 03/10/1989
From: Hopkins J
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
IEB-88-011, IEB-88-11, TAC-71891, NUDOCS 8903200418
Download: ML20236B189 (4)


Text

-_- .

J l

. March 10, 1989 l g l Docket No. 50-425 ,

I J

LICENSEE: Georgia Power Compan FACILITY: Vogtle Unit 2

SUBJECT:

SUMMARY

OF MEETING HELD MARCH 9, 1989, TO DISCUSS THE V0GTLE UNIT 2 PRESSURIZER SURGE LINE ANALYSES (TAC 71891)

On March 9, 1989, the staff met with representatives of the Georgia Power Company at the NRC offices in Rockville, Maryland to discuss the Vogtle Unit 2 pressurizer surge line analyses. Participants are listed in the Enclosure.

A presentation was made regarding the confirmatory analyses performed of the pressurizer surge line thermal stratification issue in response to NRC Bulletin '

88-11. The licensee concludes from the confirmatory analyses that the pressurizer surge line still meets acceptance criteria regarding stress, fatigue, leak before break, and fatigue crack growth analyses. The NRC staff requested that additional information be submitted by March 14, 1989. The licensee agreed to submit the requested information.

Jon B. Hopkins, Project Manager Project Directorate 11-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Enclosure:

As stated cc: See next page 4 DISTRIBUTION FOR MEETING

SUMMARY

DATED: March 9, 1989 Facility: V0GTLE UNIT 2

, Docket' File D. Matthews 14-H-25 "NRC PDR M. Rood 14-H-25 Local PDR J. Hopkins 14-H-25 PDII-3 Reading OGC 154-18 T. Murley 12-G-18 E. Jordan MNBB-3302 J. Sniezek 12-G-18 B. Grimes 9-A-2 G. Holohan 13-A-2 J. Schiff 14-H-25 G. Lainas 14-E-4 ACRS (10) gensP-135-E. Adensam 14-H-3 B. Borchardt 17-D-19 jPDII-3 PDI PDIIr3 n [

JHopkins:ls JS fgens DMatthews l 03/g/89 89 03//d/89 d 5

f$03200$$ bbbb i

u air

,- '; / UNITED STATES 1 o,i NUCLEAR REGULATORY COMMISSION h l WASHINGTON, D. C. 20656 t

g.....) March 10, 1989 Docket No. 50-425 i

LICENSEE: Georgia Power Comparut FACILITY: Vogtle Unit 2

SUBJECT:

SUMMARY

OF MEETING HELD MARCH 9,1989, TO DISCUSS THE V0GTLE UNIT 2 PRESSURIZER SURGE LINE ANALYSES (TAC 71891)

On March 9, 1989, the staff met with representatives of the Georgia Power Company at the NRC offices in Rockville, Maryland to discuss the Vogtle Unit 2 pressurizer surge line analyses. Participants are listed in the Enclosure.

A presentation was made regarding the confirmatory analyses performed of the pressurizer surge line thermal stratification issue in response to NRC Bulletin 88-11. The licensee concludes from the confirmatory analyses that the pressurizer surge line still meets acceptance criteria regarding stress, fatigue, leak before break, and fatigue crack growth analyses. The NRC staff requested that additional information be submitted by March 14, 1989. The licensee agreed to submit the requested information, q t

i r/ 4W Jon B. Hopkins, Pfoject Manager Project Directorate II-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation l

Enclosure:

As stated cc: See next page i

l l

1 l

l j

. j

- g .,.

r.

't '

s ENCLQSURE ATliENDEES MARCH 9, 1989 NRC GEORGIA POWER COMPANY J. Schiffgens J. Bailey J. Hopkins P. Rice P. Kuo J. Kane S. Hou K. Wichman SOU,THERN COMPANY SERVICES.

S. Lee L Uwen D. Matthews W. Ramsey WESTINGHOUSE

0. Roburty R. Patel B. Maurer G. Ellis-K. Chang S. Sway T. Liu R. Morrison I

ii h

! i e

n .

4: ,

- i

'Mr, W, 4. 'Hairsten, 541 < I

'Georgie Power'0empsey. Vogtie flectric' Generattng Plant cc:

  • Mr. 'J. P Kane Resident Inspector Manager, Licensing and Engineering Nuclear Regulatory Comission i Georgia Power Company P.O.' Box 572 .

P.O. Box 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302

~Deppish Kirkland, III, Counsel Mr. Ruble'A. Thomas Office of the Consumers' Utility Execctive Consultant' Counc'il Southern Company Services, Inc. Suite 225 .

P.0. Box 1295 32 Peachtree Streeti H.E.

4 Birmingham, Alabama 35201 Atlanta, Georgia 30302 Mr. Paul D.. Rice James E. Joiner Vice ~ President 1 Project Director Troutman, ' Sanders, Lockerman, l Georgia Power Company & Ashmore  ;

Post Office Box 282 1400 ' Candler Building i Waynesboro, Georgia 30830 127 Peachtree Street,.N.E. ,

Atlanta, ' Georgia 30303 l Mr. J. :A. :Baile i Project Licensing Manager . Danny Feig . -j

' Southern Company .' Services, Inc. 1130 Alta Avenue P.O. Box l'295 ' Atlanta., Georgia 30307 Birmingham, Alabama -35201 Carol Stangler Ernest L. Blake, Jr. Georgians Aga. inst Nuclear Energy- 4 Bruce W. Churchill, Esq. 425 Euclid Terrace Shaw., Pittman, Potts and Trewbridge ' Atlanta, Georgia 30307 2300 N Street,:N. W.

Washington, D, C. 20037 Nr. R. P. Mcdonald Executive Vice President -

Mr. G. Bockhold , Jr.. Nuclear Operations General Manager, Nuchaf Operations Georgia Power Company i Georgio Power Company P.O. Box 1295 3 P.'O. . Box 1600 Birmingham, Alabama 35201 1 Waynesboro; ' Georgia .30830 Regional Administrator., Region II Mr. J. Leonard Ledbetter, Commissioner U.S. Nuciear Megulatory Comission Department of ' Natural Resources 101 Marietta Street, WW., Iuite 2900 270 Vas'hington Street,'NW Atlanta, Geetsia 303f3 Athnta, Georgia 30334 Office of the Counity Commissioner Attorney General l Burke County Commission Law Departirent Waynesboro, Gecbsf a ' 30830 T32 Judicial Building Atianta, Georgia 30334 l Office of Pisnt.ing and Bedget g Room 615B Mr.' Alan R..Herdt, Chief 4 270 Washington Street, S.W. Project' Branch (3

. Atlanta, Georgia 30334 U.S. Nuclear Regulatory Consission 101 'Marietta $treet, NW, Suite 2900  ;

Atlanta, Georgia 30323

)

. . ,