ML20150C030
| ML20150C030 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/04/1988 |
| From: | Lanning W Office of Nuclear Reactor Regulation |
| To: | Rossi C Office of Nuclear Reactor Regulation |
| References | |
| OREM-88-009, OREM-88-9, NUDOCS 8803170266 | |
| Download: ML20150C030 (8) | |
Text
.
MAR 041988 MEMORANDUM FOR: Charles E. Rossi, Director Division of Operational Events Assessment Office of Nuclear Peartor Regulation FROM:
Wayne Lanning, Chief Events Assessment Branch Division of Operational Events Assessment Office of Nuclear Reactor Regulation
SUBJECT:
THE OPERATING REACTORS EVFNTS MEETING March 1, 1988 - MEETING 88 09 On March 1,1988 an Operating Reactors Events meeting (88 09) was held to brief senior managers from NRR, RES, AE0D and Regional Offices on events which occurred since our last meeting on February 23, 1988. The list of attendees is included as Enclosore 1.
The events discusstd and the significant elements of these events are presented in Enclosure 2.
The Enclosure 3 presents a tabulation of long-term followup assignments to be completed, one event suggested for long tenn followup, and a summary of reactor scrams.
No significant events were identified for input to*
NRC's perfonnance indicator program.
Or$ 1nal S1 ned by 8
8 Wa ne D. Lanning r
Wayne Lanning, Chief Events Assessment Branch Division of Operational Events Assessment Office of Nuclear Peactor Regulation
Enclosures:
As stated cc w/Enclo.:
See Next Page DISTRIBUTION
' Central File-EAB Reading' File Circulating Copy EAB Staff MLReardon, EAB j
p D0udinot, EAB LKilgore, SECY, PDR g
U
,y 8
h gghg 8803170266 880304 PDR ORG NRRB
( r-PDR
~'
OFC :EAB:NRR
- C:{B' RR i
NAME :M
- WLann!ng
.....g............:............:...............................................................
DATE :03/o 2/88
- 03/p/88 OFFICIAL RECORD COPY
MAR 0 41988 cc:
T. Murley J. Sniezek F. Miraglia J. Forsyth, INP0 E. Jordan E. Beckjord W. Russell, RI B. Davis, Rll!-
'J. Nelson Grace, Rll
'R. D. Martin, RIV J. B. Martin, RV W.-Kane, R1 L. Reyes, Ril C. Norelius, Rll!
J. Callan, RIV D. Kirsch, RV S. Varga D. Crutchfield C. Boger l
G. Lainas i
G. Holshan-L. Shao J. Partlow B. Grirss F. Congel-E. Keiss i
S. Black T. Hartin J. Stone R. Hernan H. Bailey J. Guttmanr.
A. Thadani S. Rubin
'l i
t l
i L
l 4
i l
4 1
go on%g
,e k
UNITED STATES m
y ec g
NUCLEAR REGULATORY COMMISSION 2
j WASHINGTON, D C. 20555 0
/
MAR 0 4 1988 MEMORANDUM FOR:
Charles E. Rossi, Director Division of Operational Events Assessment Office of Nuclear Reactor Regulation FROM:
Wayne Lanning, Chief Events Assessment Branch Division of Operational Events Assessment Office of Nuclear Reactor Regulation SURJECT:
THE OPERATING REACT 0PS EVENTS MEETING March 1, 1988 - PEETING 88-09 On March 1,1988 an Operating Reactors Events meeting (88-09) was held to brief senior managers from NRR, PES, AEOD and Regional Offices on events which occurred since our last meeting on February 23, 1988. The list of attendees is included as Enclosura 1.
The events discussed and the significant elements of thec events are presented in Enclosure 9 The Enclosure 3 presents a tabulation af long-term followup assignments ts be completed, one event suggested for long term followup, and a sumary of reactor scrams.
No significant events were identified for input to NRC's perfomance indicator program,
,f g l
t i ytte L nning, Chief Events Assessment Br Division of Operational Events Assessment Office of Nuclear Reactor Regulation
Enclosures:
As stated cc w/Enclo.:
See Next Page
ENCLOSURE 1 LIST OF ATTENDEES OPERATING REACTORS EVENTS BRIEFING (88-08)
March 1, 1988 NAME ORGANIZATION NAME ORGANIZATION W. Lanning NRR/DOEA S. Varga NRR/DRP K. Eccleston NRR/ADR-2 T. Silko AE00 C. Schulten NRR/DOEA G. Klingler NRR/PFAS R. Dudley NRR/DRSP B. Grimes NPR/DRIS J. Sniezek NRR V. Benaroya AEOD/DSP M. L._Reardon NRR/DOEA J. Heltemes
'AEOD V. Beraroya AEOD/DSP W. Minners RES/DRSP L. Norrholm NRR/DRIS C. E. Rossi NRR/DOEA A. Thadan*
NRR/ DEST W. H. Regan NRR/DLPQ R. J. Eckenrode NR9/DLPQ L. Zerr NRR/DOEA R. J. Cook NRR/PDTMI i
1 e
i I
i 1
)
ENCLOSURE 2 OPERATING REACTORS EVENTS BRIEFING 88-09 LOCATION:
19-B-11 WHITE FLINT FOR:
TilESDAY, MARCH 01,-1988, 11:00 A.M.
THIS INFORMATION MAY ALSO BE OBTAINED BY DIALING EXTENSION 21449.
NC STATE RESEARCH REACTOR RCS LEAK (TELECON).
FOREIGN REACTOR EVENT (PROPRIETARY) e r --
g
ENCLOSURE 3 l
l LONGTERM FOLLOWUP ASSIGNMENTS TO BE COMPLETED LONGTERM FOLLOWUPS OUTSTANDING ORGANIZATION 02/02/88 02/09/88 02/16/88 02/23/88 03/01/88 AEOD 0
0 0
0 1
EAB 0
0 2
2 2
EMTB 0
0 0
1 0
ESGP 1
1 1
1 1
ICSB 2
2 2
2 2
OGCE 1
1 1
1 1
OTSB 2
1 1
1 1
PD2-2 1
1 1
1 1
PD2-3 1
1 1
1 1
PD3-2 1
1 1
1 1
PD5 2
2 2
2 2
RIII O
0 1
1 i
P.VI P.
4 4
4 3
2 SELB 5
5 5
6 5
SPLP 5
5 5
5 5
SRXB 2
2 3
4 3
TOTAL 27 26 30 32 29 i
f 4
(
4 S
S S
t C
C 8
8 3
)
i i
)
)
)
)
)
)
)
9 c:_
ttE
-a =
W e;
SO &
O W w L
di 2
1 SC*
a C.'
WEg RE-s 168 da*d g *: E~o
- CEE t-g 5
? E3 s
3535 5
-50:
a wawl
-W
- =g.-
3 050-bbk5
.Y 3
N
-e IA 5
9 ti E
5 ;
C =
g re s
KW 2 d E5%
5 3 C
18m
=
.- 3
-35E
- S 8 C. t:
3 -
ma
- M Edw
- E" E
EWS 5
ti -
ts 5*
G t
5 7
a w
g R
C
.q h
h-h 3
Ws
~
se~
2 *J 2*
E
REA 101 SCRA% SUF.MA;f hiEK Eh!!WS 02/26/25
!. FLA%i SPEtlFit DATA IATE Slit L%1T F0nif S!ENAL CAsiE COMFLI-YTD YTE YTD CAT 10%3 Aitvi !!.0d TOTAL l'1 151 02/I4/!! it' E' 4A FE;!:NNEL h;
O 1
1 02/24/!! !!0N 1
42 A Uht%:sN N2 1
0 1
02/21:21 Hair-100 A
'L%FN0nN h:>
1 0
1 (2/:Eli! 5:374 TEIAS 1
0A UNik:k1 N:
0 1
1 02!25!!! C5.fii;. Fl'.!R 45 &
EGU!FtE%i YES 1
0 1
SJ5?'JY Cr (cuy;1tg!}cx3 5:!E t%II lt".:LIC Ai!:s!
CRfiiAL R!sEi